Power saving module which is consisted of ferroelectric ceramic capacitor and time delay switching circuit was installed into electronic ballast in order to enhance energy efficacy and extend life time of fluorescent lamp. The impedance matching of negative resistance characteristics of F/L was optimized with the characteristics of ferroelectric ceramics capacitor to increase the light efficiency of the electronic ballast. The high efficiency of the electronic ballast was achieved by minimizing wasted power at the filament of F/L during the lighting by using the switching function of time delay circuit from preheating mode to non-preheating mode. The life time of F/L was also extended by eliminating the reverse electromotive force using time delay circuits to minimize the impacts to the filament of F/L from unwanted high voltage peaks during light-up period. As the results, the electronic ballast with the first grade energy efficiency was developed using ferroelectric ceramics and time delay module.
This paper explains how eliminating contamination from the manufacturing processes will lead to better product quality and hence the need for reworking, a trouble free commissioning period and greatly improved production efficiency. All of these will reduce costs and energy usage. It will also ensure that the product is delivered to the customer in a condition that will ensure improved reliability and longer life, again reducing both energy and other operating costs. Correctly designing the contamination control measures will achieve and maintain the level of fluid cleanliness that is required by the end user. The filter is critical to cleanliness management and should be selected with the same degree of thought and consideration as for other major components. This paper explains the role that Cleanliness Management plays in the reducing the carbon footprint of systems and processes by making them perform more efficiently for longer periods. It also examines two differing ways of selecting filters to incorporate the features of newer designs, and shows how significant savings in the costs of ownership can be achieved using these approaches.
Recently, the demand for improving energy efficiency has rapidly increased because of the growing concerns over environmental issues. In this work, the tribo-test and simulation for the initial wear and lubrication performance were performed for the piston pin in the small end system of the connecting rod of a marine engine, to obtain useful data for improving the efficiency of marine engine systems. In addition, a diamond-like carbon (DLC) coating was applied to the piston pin to explore feasibility of eliminating the bush used in the system. The initial wear and lubrication characteristics between the uncoated piston pin and bush were compared with that between the DLC-coated piston pin and connecting rod in the tribo-test. The simulation for the wear and lubrication performance according to the wear progression was conducted based on the data obtained from the test. The wear characteristics were quantitatively assessed by the wear depth and wear volume, and the lubrication performance was characterized with the change of pressure and minimum oil film thickness with respect to the crank angle. It was found that the DLC-coated piston pin may provide better initial wear characteristics and lubrication performance. The results of this work may provide fundamental information for marine engines with improved efficiency.
On the assessment results of the non-point source pollutant removability of bio-block using waste sewage sludge, at the reactor's initial operation stage, the removal efficiency of COD was slightly unstable. However, after the reactor was stabilized, the COD removal efficiency was higher in the reactor filled with bio-blocks compared to the reactor filled with broken stones. In terms of nitrogen and phosphorus, their removal efficiency was unstable at the initial stage of the reactor operation. This phenomenon was investigated through the bio-block elution experiments. Results indicated that nitrogen and phosphorus were eluted from the bio-blocks affecting their removal at the initial operation. Furthermore, based on elution tests conducted after the dry ashing of the waste sewage sludge, part of the nitrogen and phosphorus was eluted similar to the bio-block elution test results, although considerable amounts of nitrogen and phosphorus were reduced compared to the sludge cake. Prior to the use of the waste sewage sludge bio-blocks as a filter medium to remove non-point source pollutants, a stabilization period of 10 days was required. After the stabilization process, results showed similar characteristics as general aggregates. Moreover, to use the bio-block as a filter medium for the non-point pollutant removal, the filling ratio of 75% was the most suitable as it resulted in the highest nitrogen removal efficiency after the stabilization. The results of this study suggested that waste sewage sludge can be suitably recycled as a mixed raw material for the bio-blocks, with satisfactory application as a filter medium in artificial wetlands, stormwater runoff problems, stream water pollutants to eliminate non-point source pollutants.
This paper presents a control scheme with a focus on the combination of phase disposition pulse width modulation (PDPWM) and DC capacitor voltage control for a chopper-cell based modular multilevel converter (MMC) for the purpose of eliminating the time-consuming voltage sorting algorithm and complex voltage balancing regulators. In this paper, the convergence of the DC capacitor voltages within one arm is realized by charging the minimum voltage module and discharging the maximum voltage module during each switching cycle with the assistances of MAX/MIN capacitor voltage detection and PDPWM signals exchanging. The process of voltage balancing control introduces no extra switching commutation, which is helpful in reducing power loss and improving system efficiency. Additionally, the proposed control scheme also possess the merit of a simple executing procedure in application. Simulation and experimental results indicates that the MMC circuit together with the proposed method functions very well in balancing the DC capacitor voltage and improving system efficiency even under transient states.
Kim, Jibum;Kim, Inbin;Kwon, Namgu;Park, Heemin;Chae, Jinseok
KSII Transactions on Internet and Information Systems (TIIS)
/
v.9
no.2
/
pp.600-619
/
2015
We propose a cost-efficient hybrid algorithm for online location updates that efficiently combines feature point detection with the online trajectory-based sampling algorithm. Our algorithm is designed to minimize the average trajectory error with the minimal number of sample points. The algorithm is composed of 3 steps. First, we choose corner points from the map as sample points because they will most likely cause fewer trajectory errors. By employing the online trajectory sampling algorithm as the second step, our algorithm detects several missing and important sample points to prevent unwanted trajectory errors. The final step improves cost efficiency by eliminating redundant sample points on straight paths. We evaluate the proposed algorithm with real GPS trajectory data for various bus routes and compare our algorithm with the existing one. Simulation results show that our algorithm decreases the average trajectory error 28% compared to the existing one. In terms of cost efficiency, simulation results show that our algorithm is 29% more cost efficient than the existing one with real GPS trajectory data.
In recent years, various research and developments to introduce composite bridges of new concept have been performed. The types of integral bridge and portal rigid frame bridge are having advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection has problems such as complexity of construction and increase of the construction cost. A new type of bridge, called prestress integral composite girder(PIC girder) bridge, is proposed in this study, which decreases the cost of construction and improves the efficiency of construction by simplifying the detail of construction for girder-abutment connection. PIC girder bridge has the connection detail in which the steel girder and the abutment are integrated by using the PS bar installed in the connection. In this study, finite element analysis and mock-up load test are conducted to evaluate the propriety of design, the effective of fabrication and structural safety for PIC girder bridge. The adequacy of the PIC giredr bridge is verified by the results of static/dynamic load test and finite element analyses.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.11
no.3
/
pp.484-491
/
2000
It is necessary to apply SSB modulation method with high bandwidth efficiency to the DS-CDMA mobile communication systems in order to accommodate the increasing number of voice users as well as the broad band and high data rate service in the future. Even though the bandwidth efficiency increases if SSB modulation is applied to BPSK-DS/CDMA, its performance gets degraded because of the increased multiple access interference. Therefore for eliminating the increased multiple access interference, the SSB/BPSK-DS/CDMA with successive interference canceller(SIC) is proposed and its performance and capacity are analyzed. With the limited system bandwidth, it is shown that the SSB/BPSK-DS/CDMA with SIC can accommodate more capacity than the conventional BPSK-DS/CDMA with SIC.
Early-weaning at an age of less than 21 days and removal of pigs to a second isolated site, which is commonly referred to as segregated early weaning (SEW), has been shown to substantially reduce disease transfer from the dam. This strategy has been successful in reducing the number of pathogens, but has not been successful in eliminating all pathogens. Although SEW has failed in most instances to totally eliminate pathogens, performance as measured by gain and efficiency through the nursery phase has been shown to be enhanced. In addition, SEW pigs have been shown to perform well on less complex nursery diets. Pigs which are continued on a similar isolation regime to market weight have been shown to have a remarkable improvement in feed intake, gain and efficiency. However, pigs which are co-mingled with conventional pigs after the nursery phase have either no improvement in performance or reduced performance. Backfat and carcass lean yield have been shown to be enhanced by SEW in high lean gain pigs, but not in lower lean gain pigs. Exposure of pigs to antigens which activate the immune system and increase the level of immunological stress has been suggested as the mechanism involved in depressing growth and performance of pigs.
No-till direct seeding cultivation of rice has major advantages such as saving of labor and cost by eliminating tillage, preparation of seed bed and trans-planting procedure compared to the conventional transplanting cultivation. A field experiment was conducted to evaluate the effects of straw treatment and nitrogen levels on the rice growth in no-till direct-seeding cultivation. Rice straw, vetch straw, and the mixture of both of the straws were mulched on the surface of soil before seeding while 4 levels of nitrogen fertilizer, 0, 7, 9, and 11 kkg/10a respectively, were applied at 3 split times, 3-weeks after sowing, 5-weeks after sowing and the panicle initiation stage. Mulching of vetch straw significantly reduced seedling establishment of rice which may be attributed to low oxidation-reduction potential of soil by vetch mulching treatment. Vetch straw increased the concentration of soil ammonium leading to an extension of the greenish leaf to panicle initiation stage. Agronomic nitrogen use efficiency (AD $E_{N}$) in heavy-mixed straw mulching plots was lower than other treatments. Grain yield and AU $E_{N}$ in the vetch treatment were less affected by fertilized N levels. Conclusively, it is suggested that heavy straw mulching was not efficient for rice seedling establishment and nitrogen usage.e.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.