Seo, K.S.;Park, S.K.;Park, J.W.;Park, J.H.;Cho, G.B.;Baek, H.L.
Proceedings of the KIEE Conference
/
2002.11d
/
pp.267-270
/
2002
Fractional horse power single phase induction motors have no starting torque their own. So there are several ways of starting single phase induction motors. The most common type is the starting capacitor installed in series with the auxiliary winding to increase the starting torque. Also, the auxiliary winding is disconnected once the speed of the motor reaches 70 to 80 [%] of the rated speed. In the conventional systems, this function is conducted by a centrifugal switch. But the mechanical centrifugal switch has many problems such as switch malfunction. This paper presents the new methods of electronic starting switch by inductor to overcome these shortcomings of centrifugal switch.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.49
no.1
/
pp.70-76
/
2000
This paper describes a one-chip micom controller and phase angle control method for self-starting and energy saving of single-phase induction motor. The proposed method is based on the optimal efficiency control which is running by variable phase angle of main winding current such as to maintain the maximum efficiency characteristics of the motor, in voltage control with TRIAC. Experiments are focused on a capacitor starting single-phase induction motor. The optimal energy saving by variable phase angle control are verified by experimental results. Also, auxiliary winding was controlled by electronic starting switch.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.50
no.5
/
pp.238-245
/
2001
During an AC motor's start-up accelerating period, a large amount of current is required to reach to the rating speed. This is called in-rush current. This peak in-rush current can be more than about several times the operating or steady-state current in the full load rating of the motor. In-rush current is present in both and electronic ballasts. The main area of concern is the tripping of circuit breaker and fuses which can affect electrical system components From this, we can see that the electrical power controllers will be rather concerned, since they have to supply the actual current necessary to start the motor. This paper presents a new method to reducing in-rush current and energy saving of the single-phase induction motor used in air-conditioner. It can be obtained that proposed system is low cost and small size as compared with other controller. Experiments are focused on a capacitor starting single-phase induction motor. The optimal power saving and in-rush current limiting by phase angle control are verified by experimental results. Also, auxiliary winding was controlled by electronic starting switch.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.2
/
pp.338-343
/
2010
Low cost motor drives are being sought for high volume energy efficient home appliances. Key to the realization of such low cost motor drives is to reduce the power electronic converter in terms of its components, particularly the active devices, finding the motor with least complexity for manufacturing and a controller that could extract the desired performance from the machine and converter combination. These and other factors such as self-starting, speed control over a wide range and most of all the crowning aspect of a four quadrant operation with bare minimum number of controllable switch (or switches) remain as formidable challenges for low cost motor drive realization. In this paper, a four quadrant switched reluctance motor (SRM) drive with only one controllable switch is realized by using a two-phase machine. The theory and operation of the proposed four-quadrant SRM drive with the proposed control algorithm for its realization are described. The motor drive is modeled, simulated and analyzed to verify its feasibility for self-starting, speed control and for four quadrant operation and the simulation results are presented. Experimental results confirm the validity of the proposed control algorithm for four quadrant control of the SRM drive. The focus of the paper is mainly directed toward the control algorithm for realizing the four-quadrant operation of the two-phase SRM drive with a single controllable switch converter.
The previous MCC's have the demerits of high cost and much manhour for rework because they are impossible for the standardization of products and have many manual connections. The customers require the products which can operate in connection with SCADA system by digitalizing the functions of the current MCC's and are systematized with capability of remote control. To solve these disadvantages and requirements, we developed the Electronic Motor Control System according to starting type for applying to fields based on this. This system has the various functions such as protection, measurement, and communication. Using these functions, it can monitor motor status through communication with the upper system and define the circuit for lower connection cost according to starting type and shorter manufacture period by program. The development of this product results in establishment of competitive structure with domestic competition and perfect automatic monitoring through linkage with SCADA system. In addition, it provides the comparable dominancy of receiving on orders in switch gear and adaptability to change of MCC market in Japan and Europe.
Park, Su-Kang;Cho, Geum-Bae;Baek, Hyung-Lae;Lim, Yang-Su
Proceedings of the KIEE Conference
/
2000.07b
/
pp.1345-1347
/
2000
This paper presents a new method to reducing inrush current and energy saving of capacitor starting single-phase induction motor used in air-conditioner. It can be obtained that proposed system is low cost and small size as compared with other controller. Experiments are focused on a capacitor starting single-phase induction motor. The optimal power saving and in-rush current limiting by phase angle control are verified by experimental results. Also, auxiliary winding was controlled by electronic starting switch.
Single phase switched reluctance motor has a high speed capability, due to its very robust rotor, and requires only one electronic power switch in its control circuitry. The latter feature considerably reduces the cost of the drive system. But it involves starting problem and strongly torque ripple, which means that the motor is not suitable for application that require constant torque or speed. To solve torque ripple and region of these problem, this paper presents a single phase Switched Reluctance Motor model with a barrier rotor pole. Also it is simulated the designed prototype model by FEM for the prediction of characteristics.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.14
no.6
/
pp.149-157
/
2014
This paper is based on the fabrication of wireless control system for the building shading device. RF Module was controlled by UHF wireless CC1020 chip which has low electrical power and low electrical voltage. Also 447.8625~447.9875 frequency, 4800Baud data rate and 12.5 kHz channel spacing was controlled by the use of SPDT switch and with Microcontroller program. Furthermore, the helical antenna was used. The starting production of 447.8625~447.9875 kHz wireless electrical power was used. As the result, it did not exceed 10dBm which is the standard of low power wireless system. Shading efficiency was measured at 25%, 50%, 75% direction with controlling the interior temperature and the intensity of illumination at the rate of 1 hour. As the result, the intensity of illumination was lowered to 82~87% at 25% direction with $0.6{\sim}1.4^{\circ}C$ lowered temperature. At 50% direction, the intensity of illumination was lowered to 60~68% with $2.3{\sim}4.1^{\circ}C$ lowered temperature. And at 75% direction, the intensity of illumination was lowered to 41~47% with $3.4{\sim}5.1^{\circ}C$ lowered temperature.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.11
no.4
/
pp.436-444
/
2018
Currently, the new substation automation uses the international standard IEC 61850 communication protocol. KEPCO is also constructing a new substation based on IEC 61850 from 2013 through the pilot application and research and development starting from 2007. However, there are few cases where existing substations(Transformer, T/L GIS, D/L GIS, etc.) have been used, and RTU based substations operating systems have been changed to SA substations based on IEC 61850. Therefore, the introduction of IEC 61850 in existing substation facilities has the advantage of enhancing the substantiality of the substation by reusing existing facilities, improving the interoperability with the latest substations introduced, and converting existing substations into systems suitable for unmanned operation. In this paper, we introduce a case of changing the existing RTU based substation operation system to digital substation using IEC 61850 field information processor, Ethernet switch and SA operation system. Also, IEC 61850 client authentication program and Wireshark, which is a packet analysis tool, verify IEC 61850 conformance and its feasibility.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.