• Title/Summary/Keyword: Electromagnetic Susceptibility

Search Result 65, Processing Time 0.024 seconds

Study on Short-range Non-line-of-sight Ultraviolet Communication (근거리의 자외선 비가시거리 통신에 관한 연구)

  • Park, Dong-Kook
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.36 no.1
    • /
    • pp.179-184
    • /
    • 2012
  • A conventional wireless rf communication has relatively high ratio of power dissipation to transmit power for short-range links, susceptibility to interference, interception and jamming of electromagnetic wave. The study on alternative using ultraviolet signal to remedy the shortcomings of conventional rf communication has recently received attention. In this paper, the simulation results about the data rate performance of ultraviolet non-line-of-sight communication are provided. It is found that the direction of transmitting beam, receiving field of view width and the transmitting signal power have a seriously effect on the data rate of on-off-keying non-line-of-sight ultraviolet communication.

The analysis of E-field produced by satellite S-band under fairing of launcher (인공위성 S-band가 형성한 발사체 패어링내의 전기장 해석)

  • Kim, Eui-Chan;Lee, Sang-Kon
    • Aerospace Engineering and Technology
    • /
    • v.10 no.2
    • /
    • pp.82-86
    • /
    • 2011
  • This paper presents an RF Electric field assessment at 2.290 [GHz] inside launcher PROTON M/Breeze M long fairings, produced by COMS TM. COMS intentional RE due to TM ON under fairing has been assessed considering PROTON M / BREEZE M fairing characteristics. As fairings of all launchers present similar sizes, a similar E-field level under fairing is expected for the other launchers. As a result, the RE level under faring is compliant with COMS RS limits, but is not compliant with RS requirements of the launcher PROTON M/Breeze M.

Design of EUT test equipment for EMC Testing (EMC 시험을 위한 EUT 시험장비 설계)

  • Hong-Rak Kim;Youn-Jin Kim;Seong-Ho Park;Man-Hee Lee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.4
    • /
    • pp.35-40
    • /
    • 2023
  • For the EMC test, the radiation characteristics and immunity characteristics of the EUT are measured under the condition that the EUT maintains its normal operation. For normal operation of the EUT, it is necessary to operate the EUT and monitor its status through separate equipment outside the anechoic chamber. External equipment operates and monitors the EUT through various communications such as 1553B communication, RS-485 communication, and Ethernet communication. At this time, external equipment can transmit noise through the communication line. This noise is transmitted to the LISN through the connected power cable and measured. It is also radiated through the connection terminal to the LISN. In this case, the communication line is the power line It should be designed so that noise is not transmitted through electromagnetic isolation as much as possible. In addition, noise from external equipment must be suppressed as much as possible from entering the chamber through the communication line. In this paper, external EUT test equipment applied for EMC test It explains the considerations in the design and manufacture of the design and explains the satisfaction of the design through tests including CE and RE.

A Design Verification for the EQM CBS Ka-band Payload System by EMC Test (EQM 통신방송위성 KA대역 탑재체 시스템의 EMC 시험을 통한 검증)

  • Lee,Ho-Jae;U,Hyeong-Je;Sin,Dong-Hwan;Park,Jong-Heung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.31 no.10
    • /
    • pp.97-104
    • /
    • 2003
  • This paper addresses EMC test results for the EQM Communications & Broadcasting Satellite(CBS) Ka-band Payload System. The aim of the EMC test is to verify that the payload system has no effect on the other system and is not affected by the external field. The compliance of EMC system requirements was verified by the analysis and measurement of the emission level from the payload system. The variation of performance by noise injection was measured to inspect the susceptibility of the payload system. The analysis and test results also showed that the electromagnetic interference has no serious effect on the overall payload system performance. It is confirmed that the EQM CBS Ka-band payload system can be operable in the space environment from the EMC performance's viewpoint. It is also obtained that better performance can be acquired by improving waveguide design and integration method.

Analysis of EMI Between Overlapped Railway Signalling Systems and Its Countermeasure (철도신호시스템 중첩운영으로 인한 전자파장해현상 분석 및 대책)

  • Kho, Young-Hwan;Yoon, Sun-Ho;Choi, Kyu-Hyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1116-1122
    • /
    • 2009
  • ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.