• Title/Summary/Keyword: Electricity power consumption

Search Result 314, Processing Time 0.028 seconds

Economic implications of optimal operating conditions in a full-scale continuous intermittent cycle extended aeration system (ICEAS) (실규모 연속유입간헐폭기 공정(ICEAS)에서 최적운전조건이 경제성에 미치는 영향)

  • Yong-jae Jeong;Yun-Seong Choi;Seung-Hwan Lee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.38 no.1
    • /
    • pp.29-38
    • /
    • 2024
  • Wastewater management is increasingly emphasizing economic and environmental sustainability. Traditional methods in sewage treatment plants have significant implications for the environment and the economy due to power and chemical consumption, and sludge generation. To address these challenges, a study was conducted to develop the Intermittent Cycle Extended Aeration System (ICEAS). This approach was implemented as the primary technique in a full-scale wastewater treatment facility, utilizing key operational factors within the standard Sequencing Batch Reactor (SBR) process. The optimal operational approach, identified in this study, was put into practice at the research facility from January 2020 to December 2022. By implementing management strategies within the biological reactor, it was shown that maintaining and reducing chemical quantities, sludge generation, power consumption, and related costs could yield economic benefits. Moreover, adapting operations to influent characteristics and seasonal conditions allowed for efficient blower operation, reducing unnecessary electricity consumption and ensuring proper dissolved oxygen levels. Despite annual increases in influent flow rate and concentration, this study demonstrated the ability to maintain and reduce sludge production, electricity consumption, and chemical usage. Additionally, systematic responses to emergencies and abnormal situations significantly contributed to economic, technical, and environmental benefits.

A Study on the Comparison of Electricity Forecasting Models: Korea and China

  • Zheng, Xueyan;Kim, Sahm
    • Communications for Statistical Applications and Methods
    • /
    • v.22 no.6
    • /
    • pp.675-683
    • /
    • 2015
  • In the 21st century, we now face the serious problems of the enormous consumption of the energy resources. Depending on the power consumption increases, both China and South Korea face a reduction in available resources. This paper considers the regression models and time-series models to compare the performance of the forecasting accuracy based on Mean Absolute Percentage Error (MAPE) in order to forecast the electricity demand accurately on the short-term period (68 months) data in Northeast China and find the relationship with Korea. Among the models the support vector regression (SVR) model shows superior performance than time-series models for the short-term period data and the time-series models show similar results with the SVR model when we use long-term period data.

Game Theory-based Bi-Level Pricing Scheme for Smart Grid Scheduling Control Algorithm

  • Park, Youngjae;Kim, Sungwook
    • Journal of Communications and Networks
    • /
    • v.18 no.3
    • /
    • pp.484-492
    • /
    • 2016
  • Smart grid (SG) technology is now elevating the conventional power grid system to one that functions more cooperatively, responsively, and economically. When applied in an SG the demand side management (DSM) technique can improve its reliability by dynamically changing electricity consumption or rescheduling it. In this paper, we propose a new SG scheduling scheme that uses the DSM technique. To achieve effective SG management, we adopt a mixed pricing strategy based on the Rubinstein-Stahl bargaining game and a repeated game model. The proposed game-based pricing strategy provides energy routing for effective energy sharing and allows consumers to make informed decisions regarding their power consumption. Our approach can encourage consumers to schedule their power consumption profiles independently while minimizing their payment and the peak-to-average ratio (PAR). Through a simulation study, it is demonstrated that the proposed scheme can obtain a better performance than other existing schemes in terms of power consumption, price, average payment, etc.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

The Recommendation on Power Saving through the Measuring of the Standby Power of OA Equipments (OA기기의 대기전력 측정을 통한 절전 평가 제안)

  • Kim, Man-Geon;Choi, Don-Mook
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.161-167
    • /
    • 2013
  • The purpose of this study was to assess power loss in the computer and office automation equipment and identified a way to save power consumptions through field measurement. In this study, the meaning of standby power was to consume power while waiting for the use of any electronic equipment. This standby consumption was about 11% of total power consumption even though we did not seriously realize it. Therefore, it was very important to measure accurate power consumption at the standby status of electronic equipment. In addition, it also helped to reduce potential risks of electricity associated disasters. This study proposed the way to reduce power losses through automatic turn off switches for power outlets and switches. Finally, this study can evaluate power consumption patterns that can reduce power consumptions and potential risks of power related disasters. This also can achieve the goals of sustainability that can reduce environmental impacts by lowering energy consumptions and greenhouse gas emissions.

A study on the electric railway load pattern analysis and building database program (전기철도 부하특성 분석 및 데이터베이스 구축)

  • Jeon, Yong-Joo;Kim, Chi-Tae;Lee, Gi-Chun;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.719-722
    • /
    • 2006
  • At present, In korea one of big characteristics in electricity power market is unique seller but in the near future competitions are expected in the market. Another big trend is development of IT technology. Through IT, remote inspection for power usage are possible. So huge power consumer like KORAIL it is necessary to investigate power consumption pattern. This paper presents load consumption pattern for representative substation and billing system database program. Base on the substation annual power usage data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. The database program was properly designed to examine the billings.

  • PDF

Relationship between declining oil use and electrification (탈석유화와 전기화의 관계 분석)

  • Choi, Hyo-Yeon;Kim, Sun-Young;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.23 no.2
    • /
    • pp.119-124
    • /
    • 2014
  • After the oil crisis in 1970s, many countries have tried to reduce oil dependency. Especially, in Korea, rapid declining oil consumption has speedily brought to electrification and a surge in electricity demand. This paper attempts to estimate the relationship between declining oil use and electrification in Korea using OECD panel data covering from 1985 to 2011. To this end, random effect model and fixed effect model are employed. The increase in the ratio of energy oil to total energy consumption by 10%p leads to reduce the electricity demand by about 15%. This result can be useful information to cope with the recent crisis of electric power. In addition, industrial sector is ranked in forth the ratio of industrial electricity use to total electricity use according to the result of comparative analysis of electricity consumption by use in OECD countries. Therefore, industrial sector should be treated as the main target of demand-side management policies for electricity.

A Study on the Spatial Units Adequacy for the Regional Pricing of Electricity: Based on Electricity Self-sufficiency Rates by Si·Gun·Gu (지역별 차등 전기요금제 적용을 위한 공간 단위 검토: 시·군·구별 전력 자급률을 기준으로)

  • Chung Sup Lee;Kang-Won Lee
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.26 no.2
    • /
    • pp.96-109
    • /
    • 2023
  • Recently, there has been a lot of discussion about the regional pricing of electricity and electricity self-sufficiency. In Korea, power generation facilities are highly ubiquitous and there is an imbalance between electricity production and consumption regions. So it is proposed to charge different price by region, instead of the current nationwide uniform price, and the regional electricity self-sufficiency rate is proposed as a criterion for identifying electricity production and consumption regions. However, many discussions set the spatial unit for measuring electricity self-sufficiency by 17 Si·Do, which needs to be analyzed for its appropriateness. In this study, we analyzed the electricity self-sufficiency rate using 17 provinces and 229 Si·Gun·Gu as the spatial unit. As a result of the analysis, there are 7 and 10 electricity producing and consuming regions at Si·Do level, but 38 and 191 at Si·Gun·Gu level. In addition, although the electricity self-sufficiency rate measurement has the advantage of identifying electricity production and consumption areas in a simple and intuitive way, we points out that it has some problems with the criteria for regional pricing of electricity.

Human resource development and needs analysis for nuclear power plant deployment in Nigeria

  • Egieya, Jafaru M.;Ayo-Imoru, Ronke M.;Ewim, Daniel R.E.;Agedah, Ebisomu C.
    • Nuclear Engineering and Technology
    • /
    • v.54 no.2
    • /
    • pp.749-763
    • /
    • 2022
  • The fulcrum of economic development is a sustainable supply of electricity. Nigeria is plagued with blackouts, with one of the lowest per capita electricity consumption in the world (circa. 120 kWh per capita). Hence, policies have been instigated to integrate electricity generation from nuclear power plants (NPP) on or before 2027. However, a critical requirement for NPP generation is the implementation of robust human resource development (HRD) programs. This paper presents the perspective of Nigeria in assessing human resources needs over the entire NPP lifecycle following the milestone approach and employing the IAEA's Nuclear Power Human Resource (NPHR) modeling tool. Three workforce organizations are in focus including the owner/operator, regulators, and construction workers following three decades timeframe (2015-2045). The results indicate that for the study period, a maximum of approximately 9045 personnel (73% construction workers, 24% owner/operator, and 3% regulators) should be directly involved in the NPP program just before the commissioning of the third NPP in 2033. However, this number decreases by about 73% (2465 personnel including 94% operator and 6% regulator) at the end of the study timeframe. The results can potentially provide clarity and guidance in HRD decision-making programs.

Decision of Lighting Power Density for Office Building Lighting (사무용 빌딩의 조명전력 허용기준 연구)

  • Lee, Sang-Jin;Lee, Min-Wook;Kim, Hoon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.1
    • /
    • pp.22-28
    • /
    • 2012
  • To identify energy savings when comparing lighting designs or evaluating installed lighting, it is necessary to analyze the consumption of lighting power with respect to the electricity consumed and the lighting area. In Korea, however, these factors have not been considered in lighting design. In this paper, the lighting power-related standards on indoor lighting in foreign countries have been analyzed. It is determine appropriate lighting power consumption for indoor by calculating the energy consumption has been estimated in a lighting design adopted domestic luminaire used.