• Title/Summary/Keyword: Electricity Substation

Search Result 39, Processing Time 0.026 seconds

A study on the electric railway load pattern analysis and building database program (전기철도 부하특성 분석 및 데이터베이스 구축)

  • Jeon, Yong-Joo;Kim, Chi-Tae;Lee, Gi-Chun;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.719-722
    • /
    • 2006
  • At present, In korea one of big characteristics in electricity power market is unique seller but in the near future competitions are expected in the market. Another big trend is development of IT technology. Through IT, remote inspection for power usage are possible. So huge power consumer like KORAIL it is necessary to investigate power consumption pattern. This paper presents load consumption pattern for representative substation and billing system database program. Base on the substation annual power usage data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. The database program was properly designed to examine the billings.

  • PDF

A Study on Comparative Analysis of Power Consumption Characteristics and the revulsion of investment on the application of a BESS in Subway Substation (도시철도 변전소 단위구간의 전력사용 실태 및 피크제어용 BESS 도입에 따른 경제성 분석)

  • Jung, Hyun-Ki;Kim, Se-Dong;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.85-90
    • /
    • 2014
  • This paper shows a reasonable demand power, that was made by the systematic and statistical way considering actual conditions, such as investigated transformer capacity and peak power for the last 6 years of subway substation customer as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimum and thus it was carried by the linear and nonlinear regression analysis. And we studied on the application of a BESS. Analysis showed that the revulsion of capital is about 3 years and 4 months.

Study on selection and basic specifications design of shield TBM for power cable tunnels (터널식 전력구 쉴드TBM 선정 및 기본설계 사양 제시에 관한 연구)

  • Jung Joo Kim;Ji Yun Lee;Hee Hwan Ryu;Ju Hwan Jung;Suk Jae Lee;Du San Bae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.3
    • /
    • pp.201-220
    • /
    • 2023
  • Power cable tunnels is one of the underground structures meant for electricity transmission and are constructed using shield TBM method when transitting across urban and subsea regions. With the increasing shaft depth for tunnels excavation when the shield TBM excavated the rock mass, the review of selecting closed-type shield TBM in rocks becomes necessary. A simplified shield TBM design method is also necessary based on conventional geotechnical survey results. In this respect, design method and related design program are developed based on combined results of full-scale tests, considerable amount of accumulated TBM data, and numerical simulation results. In order to validate the program results, excavation data of a completed power cable tunnel project are utilized. Thrust force, torque, and power of shield TBM specification are validated using Kernel density concept which estimates the population data. The robustness of design expertise is established through this research which will help in stable provision of electricity supply.

A Study on the Development of a Silencer and Noise Reduce for M.Tr Room (주변압기실의 소음저감 및 소음기 개발에 관한 연구)

  • Kim, Young-Dal
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.1
    • /
    • pp.111-118
    • /
    • 2006
  • Relatively high noise emitted from Transformers of in-door-substation in urban area has become the target of public complaints and the frequency is on the rise in these days due to an extension of transformer installations and new establishment of substations. The noise consist of harmonics of a specific frequency of the twice of the electricity frequency(60[Hz]), which is hard to control by using the general sound proofing techniques. In this work, several effective methods were discussed for reducing the noise from a transformer, which is transmitted through explosion preventing shutter and air tunnels. By applying to the actual site, the effects of the methods were verified.

Study on the Optimal Operation of ESS Considering Urban Railway Load Characteristic (도시철도 부하특성을 고려한 ESS의 최적 운영방안 연구)

  • Heo, Jae-Haeng;Shin, Seungkwon;Park, Jong-young;Kim, Hyeongig
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1508-1516
    • /
    • 2015
  • This paper proposes the optimal operation of ESS (Energy Storage System) in the substation of urban railway in an economical point of view. Since the load patterns of urban railway have different characteristics with the general power demand pattern, the characteristics motivate us to develop the optimal operation algorithm for ESS under Korean electricity billing system. We also introduce two different ESS operation strategies for peak load shaving and electricity consumption charge minimization respectively, and formulate each scheme. Historical data from Namgwangju substation are used for economical comparison of the strategies. The results show that the proposed algorithm is the most cost-effective ESS operation scheme among the strategies and reduces around 5 percent of electric charges compared to the charge without ESS operation.

A Study on a Substation Static Load Model Including the Mobility of a Railway Load (철도 부하의 이동성을 반영한 변전소 정태부하모델링 수립에 대한 연구)

  • Chang, Sang-Hoon;Youn, Seok-Min;Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.315-323
    • /
    • 2015
  • Nowadays, it is expected that mobility loads such as electric railways and electric vehicles will be penetrated gradually and affect on the power system stability by their load characteristics. Various researches have been carried out about electric vehicles for the recent decade though the load of electric railway could be forecasted because of the specified path and timetable, is a field with a long historic background. Some precise 5th polynomial equations are required to analyze the power system stability considering mobility load to be increased in the immediate future while the electric railway dispatching simulator uses load models with constant power and constant impedance for the system analysis. In this paper, seasonal urban railway load models are established as the form of 5th polynomial equations and substation load modeling methods are proposed merging railway station load models and general load models. Additionally, load management effects by the load modeling are confirmed through the case studies, in which seasonal load models are developed for Seoul Subway Line No. 2, Gyeongui Line and Airport Railroad and the substation load change is analyzed according to the railway load change.

Optimal Design of Power Grid and Location of Offshore Substation for Offshore Wind Power Plant (해상풍력발전단지의 전력망과 해상변전소 위치에 대한 최적 설계)

  • Moon, Won-Sik;Won, Jong-Nam;Huh, Jae-Sun;Jo, Ara;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.984-991
    • /
    • 2015
  • This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.

Study on Analysis for Power Consumption and Charge/Discharge Effect with BESS in AC High-Speed Electric Railway System (교류 고속철도계통에서 BESS의 도입을 위한 전력소비 및 충·방전효과 분석에 관한 연구)

  • Jeon, Yong-Joo;Kang, Byoung-Wook;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.20-27
    • /
    • 2014
  • The power consumption pattern of high-speed railway has rarely during night time. But, during service time, the power is consumed irregularly related to train operation. Especially certain unusual about 1-2 days of service time interval to indicate the power consumption is rapidly growing phenomenon, which causes the capacity of the power contract is the annual electricity bill to rise rapidly as the cause. Normally, amount of peak power consumption bill rate at railway substation is over 20% of total electrical bill. Therefore, high-speed railway substation is expected to be considerably larger savings by reducing the peak power of the default charge(demand power).

A Study on tests process for verification of AC Traction system performance (교류 급전시스템 성능검증을 위한 시험방안에 관한 연구)

  • Jung, Ho-Sung;Lee, Ki-Won;Kim, Joo-Rak;Han, Moon-Seob;Kim, Jin-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2202-2203
    • /
    • 2011
  • AC substation of urban transit supplies a suitable AC power on electricity vehicles. AC substation is verified electrical safety of system through pre-operation inspection on electrical installations to be supplied power from KEPCO. However, because test items and method for AC traction system are unprepared on pre-operation inspection, the general safety and performance verification of AC traction system are very insufficient. Therefore this paper analyze the test examples such as factory equipment tests, factory combined tests and railway tests for the safety and performance verification of AC traction system and present a suitable test items and test standard in domestic.

  • PDF

Bus Voltage Analysis of Substation Connected to the Wind Generation Farm (풍력발전단지와 연계된 변전소의 모선전압 분석)

  • Kim Young Hwan;Hyun Gil Ju;Ko Seok Bum;Yang Ik Jun;Na Kyoung Yun;Kim Se Ho
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.236-238
    • /
    • 2004
  • In recent years wind turbine technology has undergone the rapid development in response to the demands for increased use of renewable sources of energy. Using wind turbines for production of electrical energy requires reliable operation. The increased share of wind power in electrical system makes it necessary to have grid-friendly interfaces between the wind turbines and the grid in order to maintain power quality. Increasingly wind turbines are being connected into electricity distribution system. The grid-connected wind power stations have many impacts on power systems such as voltage variations, harmonics. The paper investigates the influences of grid-connected wind power generation system on substation bus voltage.

  • PDF