• Title/Summary/Keyword: Electricity Load

Search Result 515, Processing Time 0.026 seconds

Recommended Practice for Demand Factor/Diversity Factor with respect to Power Consumption Characteristics in Commercial Buildings (업무용 빌딩의 전력소비 특성을 고려한 수용률/부등률의 적용에 관한 연구)

  • 김세동
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.16 no.6
    • /
    • pp.74-79
    • /
    • 2002
  • This paper shows a reasonable design standard factor in commercial buildings, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, load characteristic, etc., for 23 commercial buildings. With a rapid growth of national economics with the development of intelligence society , electrical energy consumption markedly increased Expecially, it is increased electrical energy consumption in the commercial buildings and thus an energy conservation through efficient use of electricity became more important In our country, the estimation of demand factor and electric equipment capacity are not properly and thus the application of these factors are confusing and different in each electric design of the field.

Optimal Division Model Configuration Plan According to 6 Divisions 3 Ties in Korea Distribution System (국내 배전계통의 6분할 3연계 최적분할 모델 구성방안)

  • Lee, Dae-Dong;Son, Sung-Hwan;Ha, Bok-Nam;Hyun, Dong-Seok;Kim, Young-Dal
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.4
    • /
    • pp.428-433
    • /
    • 2010
  • According as economy grows, demand for power increases and satisfaction of customer about electricity quality is rising. There is in trend that investment expense by continuously increased supply of electric power equipment is on the increase continuously, but management efficiency improvement through curtailment of supply of electric power equipment investment expense through efficient operation is required rather than to increase investment. In this study, reconsidered about 6 divisions 3 ties that is distribution line basis configuration of Daejeon Geumsan area and analyzed division and tie present condition of truthful distribution System. Examined problem analyzing average division number, tie number and tie switch number, searched about most suitable division that consider load. Hereafter, I wish to take advantage of analysis result in most suitable division and tie of truthful distribution system for power failure section reduction and investment expense curtailment.

Transmission Cost Allocation Considering Reliability Cost (신뢰도 비용을 고려한 송전요금 할당)

  • Park, Yeong-Hyeon;Kim, Dong-Min;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.576-581
    • /
    • 2008
  • Electricity Market in Korea can't provide locational price signal through energy price because energy market is CBP(Cost Based Pool) using uniform price. Generators don't want to locate in a densely populated load area(like the metropolitan area). Because they are paid more fixed cost in metropolitan area. This situation has loss and congestion occurred in power system. However energy market without price signal can't lead generator to the metropolitan. So, market participants should be provided price signal through the transmission price instead of energy price. This paper proposes transmission pricing method considering reliability cost in order to offer price signal. Also, it proposes the method to allocate the transmission cost to each transmission line user through a fair and a reasonable manner. The transmission price is decided by the reliability value of each line. If a transmission line of high reliability value is broke, users using that line will get a loss and a discomfort. So, it is fair that users using a transmission line of high reliability value pay more than the other users. Also, it is reasonable that a transmission line owner get paid more form users using that line.

A Study on the Voltage Upgrading of Transmission Lines using Polymer Insulation Arm (폴리머 절연암을 이용한 송전선로 전압 승압에 관한 연구)

  • Lee, Won-Kyo;Lee, Jung-Won;Kang, Yeon-Woog;Lee, Dong-Il
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.22 no.10
    • /
    • pp.870-878
    • /
    • 2009
  • The large increase in the use of electricity has resulted in an ever-growing electric power demand. It has created the need for the construction of power transmission facility located close to the load centers and it also has to require wide right-of-way and large lots, that are not always available, for especially the installation of the towers. The difficulties in acquiring right-of-way have put pressure on energy companies to either upgrade a line on an existing right-of-way to higher voltage or build a new line on a narrow right-of-way. This paper presents the design of a compact tower with polymer Insulation arm, in order to reduce the separation between phases. the compact tower can be built on a narrow right-of-way. the compact tower can be designed based on 345 kV Tower regarding electrical clearances and right of way, therefore the conventional 154 kV Tower can be upgrading transmission line voltages have moved to 345 kV levels.

Thermal Characteristics of 600 W Brushless DC Motor under Axial Loading Condition (회전축 부하를 고려한 BLDC 모터의 열적 특성에 관한 실험 및 수치 해석적 연구)

  • Kwon, Hwabhin;Lee, Won-Sik;Kim, Gyu-Tak;Park, Heesung
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.33 no.12
    • /
    • pp.999-1005
    • /
    • 2016
  • A brushless direct current (BLDC) motor electronically performs rectification without brushes. It therefore does not have the typical mechanical friction contacts between the brushes and commutators. The BLDC motor has the advantages of high speed, low noise, and electronic noise reduction in addition to high durability and reliability. Therefore, it is mainly used in electric vehicles and electric equipment. However, iron loss and copper loss due to long-term use induce temperature increases in the motor, which reduces its performance and life. The temperatures of the stator and permanent magnet are predicted to be $62.3^{\circ}C$ and $32.2^{\circ}C$, respectively. This study shows the enhanced temperature distribution in a 600 W BLDC motor using unsteady and three-dimensional (3D) numerical investigations validated with experimental data.

Microgrid energy scheduling with demand response

  • Azimian, Mahdi;Amir, Vahid;Haddadipour, Shapour
    • Advances in Energy Research
    • /
    • v.7 no.2
    • /
    • pp.85-100
    • /
    • 2020
  • Distributed energy resources (DERs) are essential for coping with growing multiple energy demands. A microgrid (MG) is a small-scale version of the power system which makes possible the integration of DERs as well as achieving maximum demand-side management utilization. Hence, this study focuses on the analysis of optimal power dispatch considering economic aspects in a multi-carrier microgrid (MCMG) with price-responsive loads. This paper proposes a novel time-based demand-side management in order to reshape the load curve, as well as preventing the excessive use of energy in peak hours. In conventional studies, energy consumption is optimized from the perspective of each infrastructure user without considering the interactions. Here, the interaction of energy system infrastructures is considered in the presence of energy storage systems (ESSs), small-scale energy resources (SSERs), and responsive loads. Simulations are performed using GAMS (General Algebraic modeling system) to model MCMG, which are connected to the electricity, natural gas, and district heat networks for supplying multiple energy demands. Results show that the simultaneous operation of various energy carriers, as well as utilization of price-responsive loads, lead to better MCMG performance and decrease operating costs for smart distribution grids. This model is examined on a typical MCMG, and the effectiveness of the proposed model is proven.

An Operation Strategy of Udo Island Power System with the Introducing ESS (ESS 도입에 의한 우도 전력계통 운영방안)

  • LEE, DOHEON;Kim, Eel-Hwan;Kim, Ho Min;Oh, Sung-Bo;LEE, SEUNGMIN
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.3
    • /
    • pp.57-63
    • /
    • 2015
  • This paper presents a solution by introducing energy storage system(ESS) to solve an annual blackout due to a typhoon or electrical failure in Udo Island. This island is now receiving electrical power through undersea cables from the Jeju Island. During blackout period, ESS will supply the electricity. And it is necessary to estimate the ESS capacity and control the transient state for the operation of stable power system. For the verification of proposed method, ESS capacities have been estimated according to base load and the minimum capacity of only home appliance in Udo Island. Also, in case of restoring from the fault, the algorithm for synchronization is proposed. Finally, the simulation results by using the PSCAD/EMTDC program will show the feasibility.

Simulation on Energy Consumption in the Summer Season Operation of primary HVAC system for Multipurpose Building Complex (다목적 복합건물의 하절기 열원기기 운전시 소비전력에 관한 시뮬레이션)

  • Suh, Jae-Kyoung;Choi, Seung-Gil;Kang, Chae-Dong
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.903-908
    • /
    • 2006
  • Building energy simulation has become a useful tool for predicting cooling, heating and air-conditioning loads for facilities. It is important to provide building energy performances feed back to the mechanical and electrical system operator and engineer for energy conservation and maintenance of building. From this research, we set up the typical weather data of location, basic description of building, geometric modelling data and the specification of Installed primary HVAC system for establishing the simulation model about energy consuming that take place in multipurpose building complex. The simulation tool of building energy - EnergyPlus (DOE and BLAST based simulation S/W), it has been used and accomplished calculations and analyses for evaluating the effect of the system types and operating condition of central HVAC plant on the building energy consumption. In this paper, we offer comparison and simultaneous results those involve electricity consumption pattern and amount between actual operation versus EnergyPlus simulation to the object building during summer season.

  • PDF

TOKAMAK REACTOR SYSTEM ANALYSIS CODE FOR THE CONCEPTUAL DEVELOPMENT OF DEMO REACTOR

  • Hong, Bong-Guen;Lee, Dong-Won;In, Sang-Ryul
    • Nuclear Engineering and Technology
    • /
    • v.40 no.1
    • /
    • pp.87-92
    • /
    • 2008
  • Tokamak reactor system analysis code was developed at KAERI (Korea Atomic Energy Research Institute) and is used here for the conceptual development of a DEMO reactor. In the system analysis code, prospects of the development of plasma physics and the relevant technology are included in a simple mathematical model, i.e., the overall plant power balance equation and the plasma power balance equation. This system analysis code provides satisfactory results for developing the concept of a DEMO reactor and for identifying the necessary R&D areas, both in the physics and technology areas for the realization of the concept. With this system analysis code, the performance of a DEMO reactor with a limited extension of the plasma physics and technology adopted in the ITER design. The main requirements for the DEMO reactor were selected as: 1) demonstrate tritium self-sufficiency, 2) generate net electricity, and 3) achieve a steady-state operation. It was shown that to access an operational region for higher performance, the main restrictions are presented by the divertor heat load and the steady-state operation requirements.

The Study of Optimal Operation Development of PV + ESS Active System for Zero Energy Building (제로에너지건물 구축을 위한 PV + ESS 액티브 시스템의 최적운영개발에 관한 연구)

  • Woo, Sung-Min;Moon, Jin-Chel;Ahn, Jong-Wook;Kim, Yong-Ha
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.5
    • /
    • pp.53-63
    • /
    • 2019
  • This paper in order to efficiently operate zero energy buildings developed a methodology for optimal operation of PV + ESS active systems. This program consists of three steps. First step is PV optimal operation and second step is PV + ESS optimal operation. Third step is the analysis of the results by PV + ESS optimal operation. The optimal operation of PV + ESS was calculated by using Dynamic Programming (DP). Therefore, the optimal capacity and operating plan of PV + ESS in this study are calculated for electric load at building. This paper conducted case study to verify the validity of the developed algorithm. Also, the sensitivity analysis analyzed the effect of each variable on the optimal operation.