• Title/Summary/Keyword: Electrical through-connection

Search Result 254, Processing Time 0.018 seconds

Markerless Motion Capture Algorithm for Lizard Biomimetics (소형 도마뱀 운동 분석을 위한 마커리스 모션 캡쳐 알고리즘)

  • Kim, Chang Hoi;Kim, Tae Won;Shin, Ho Cheol;Lee, Heung Ho
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.9
    • /
    • pp.136-143
    • /
    • 2013
  • In this paper, a algorithm to find joints of a small animal like a lizard from the multiple-view silhouette images is presented. The proposed algorithm is able to calculate the 3D coordinates so that the locomotion of the lizard is markerlessly reconstructed. The silhouette images of the lizard was obtained by a adaptive threshold algorithm. The skeleton image of the silhouette image was obtained by Zhang-Suen method. The back-bone line, head and tail point were detected with the A* search algorithm and the elimination of the ortho-diagonal connection algorithm. Shoulder joints and hip joints of a lizard were found by $3{\times}3$ masking of the thicked back-bone line. Foot points were obtained by morphology calculation. Finally elbow and knee joint were calculated by the ortho distance from the lines of foot points and shoulder/hip joint. The performance of the suggested algorithm was evaluated through the experiment of detecting joints of a small lizard.

A Study on Efficient Cell Queueing and Scheduling Algorithms for Multimedia Support in ATM Switches (ATM 교환기에서 멀티미디어 트래픽 지원을 위한 효율적인 셀 큐잉 및 스케줄링 알고리즘에 관한 연구)

  • Park, Jin-Su;Lee, Sung-Won;Kim, Young-Beom
    • Journal of IKEEE
    • /
    • v.5 no.1 s.8
    • /
    • pp.100-110
    • /
    • 2001
  • In this paper, we investigated several buffer management schemes for the design of shared-memory type ATM switches, which can enhance the utilization of switch resources and can support quality-of-service (QoS) functionalities. Our results show that dynamic threshold (DT) scheme demonstrate a moderate degree of robustness close to pushout(PO) scheme, which is known to be impractical in the perspective of hardware implementation, under various traffic conditions such as traffic loads, burstyness of incoming traffic, and load non-uniformity across output ports. Next, we considered buffer management strategies to support QoS functions, which utilize parameter values obtained via connection admission control (CAC) procedures to set tile threshold values. Through simulations, we showed that the buffer management schemes adopted behave well in the sense that they can protect regulated traffic from unregulated cell traffic in allocating buffer space. In particular, it was observed that dynamic partitioning is superior in terms of QoS support than virtual partitioning.

  • PDF

Regional Analysis of Load Loss in Power Distribution Lines Based on Smartgrid Big Data (스마트그리드 빅데이터 기반 지역별 배전선로 부하손실 분석)

  • Jae-Hun, Cho;Hae-Sung, Lee;Han-Min, Lim;Byung-Sung, Lee;Chae-Joo, Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.6
    • /
    • pp.1013-1024
    • /
    • 2022
  • In addition to the assessment measure of electric quality levels, load loss are also a factor in hindering the financial profits of electrical sales companies. Therefore, accurate analysis of load losses generated from distributed power networks is very important. The accurate calculation of load losses in the distribution line has been carried out for a long time in many research institutes as well as power utilities around the world. But it is increasingly difficult to calculate the exact amount of loss due to the increase in the congestion of distribution power network due to the linkage of distributed energy resources(DER). In this paper, we develop smart grid big data infrastructure in order to accurately analyze the load loss of the distribution power network due to the connection of DERs. Through the preprocess of data selected from the smart grid big data, we develop a load loss analysis model that eliminated 'veracity' which is one of the characteristics of smart grid big data. Our analysis results can be used for facility investment plans or network operation plans to maintain stable supply reliability and power quality.

Application of SP Monitoring in the Pohang Geothermal Field (포항 지열 개발지역에서의 SP 장기 관측)

  • Lim Seong Keun;Lee Tae Jong;Song Yoonho;Song Sung-Ho;Yasukawa Kasumi;Cho Byong Wook;Song Young Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.7 no.3
    • /
    • pp.164-173
    • /
    • 2004
  • To delineate geothermal water movement at the Pohang geothermal development site, Self-Potential (SP) survey and monitoring were carried out during pumping tests. Before drilling, background SP data have been gathered to figure out overall potential distribution of the site. The pumping test was performed in two separate periods: 24 hours in December 2003 and 72 hours in March 2004. SP monitoring started several days before the pumping tests with a 128-channel automatic recording system. The background SP survey showed a clear positive anomaly at the northern part of the boreholes, which may be interpreted as an up-flow Bone of the deep geothermal water due to electrokinetic potential generated by hydrothermal circulation. The first and second SP monitoring during the pumping tests performed to figure out the fluid flow in the geothermal reservoir but it was not easy to see clear variations of SP due to pumping and pumping stop. Since the area is covered by some 360 m-thick tertiary sediments with very low electrical resistivity (less than 10 ohm-m), the electrokinetic potential due to deep groundwater flow resulted in being seriously attenuated on the surface. However, when we compared the variation of SP with that of groundwater level and temperature of pumping water, we could identify some areas responsible to the pumping. Dominant SP changes are observed in the south-west part of the boreholes during both the preliminary and long-term pumping periods, where 3-D magnetotelluric survey showed low-resistivity anomaly at the depth of $600m\~1,000m$. Overall analysis suggests that there exist hydraulic connection through the southwestern part to the pumping well.