Construction of 154kV Intelligent Substation for Verification Test (154kV급 실증시험용 인텔리전트 변전소 구축)

  • Chung, Y.H.;Kim, M.S.;Kim, J.B.;Lee, H.S.;Choi, I.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.456-457
    • /
    • 2006
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The Intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control Panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this Paper, we mention the synopsis and report the progress state of project.

  • PDF

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Song, W.P.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.33-35
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.129-130
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring rendition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Intelligent Substation Construction of 154kV Class (154kV 인텔리전트 변전소 구축)

  • Kim J B.;Chung Y. H.;Song W. P.;Choi I. H.;Kim J. H.;Lee D. I.;Koh H. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.524-526
    • /
    • 2004
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(UP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

Developing electric railway load pattern inspection program (전철 변전소 전력부하패턴 점검 프로그램 개발)

  • Jeon, Yong-Joo;Lee, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.893-898
    • /
    • 2007
  • At present, one of the big characteristics in electric power market in korea is unique seller but in the near future competitions are expected in the market. so additional service for the electric power are expected. Also with development of IT technology, remote inspection for power usage are possible so as consumption pattern analysis. KORAIL is one of the biggest consumer in electric power market so it is necessary to investigate power consumption pattern. This paper presents electric load consumption pattern for representative substation like urban subway, high-speed train, industrial line and simulation program for electric power rate definition program based on billing system database. Base on the substation annual power usage DB data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. Through this program it is verified that we can save more then several hundred million won for a year.

  • PDF

Development of a Substation Simulator using Real Time Digital Simulator (RTDS를 이용한 변전소 시뮬레이터 개발에 관한 연구)

  • Lee, D.S.;Ahn, B.S.;Lim, S.I.;Lee, S.J.;Chang, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.178-180
    • /
    • 2003
  • This paper proposes a real-time simulator that can simulate dynamic changes of a substation for intelligent SCADA system. The simulator consists of RTDS, voltage and current amplifier, IED, and RTU. The simulator is verified by system implementation and event simulation of a substation.

  • PDF

A study on the electric railway load pattern analysis and building database program (전기철도 부하특성 분석 및 데이터베이스 구축)

  • Jeon, Yong-Joo;Kim, Chi-Tae;Lee, Gi-Chun;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.719-722
    • /
    • 2006
  • At present, In korea one of big characteristics in electricity power market is unique seller but in the near future competitions are expected in the market. Another big trend is development of IT technology. Through IT, remote inspection for power usage are possible. So huge power consumer like KORAIL it is necessary to investigate power consumption pattern. This paper presents load consumption pattern for representative substation and billing system database program. Base on the substation annual power usage data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. The database program was properly designed to examine the billings.

  • PDF

Construction of 154kV Intelligent Substation for Verification Test (154kV급 실증시험용 인텔리전트 변전소 구축)

  • Chung, Y.H.;Kim, J.B.;Lee, H.S.;Choi, I.H.;Lee, D.I
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.661-662
    • /
    • 2007
  • We have carried out the construction of the 154kV intelligent substation with KEPRI. The intelligent substation is built in Gochang testing facility of KEPCO and consists of electronic instruments for GIS(gas insulated switchgear), digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are introduced compared with the instrument transformer of conventional type. Digital control panel(DCP) replaces the LCP(local control panel) which is drived for mechanical operation. For the monitoring of the condition of GIS and TR, various sensors are used. In this paper, we mention the synopsis and report the progress state of project.

  • PDF

Calculation of shielding range using shield wires in Myanmar 500kV Substation (차폐선을 이용한 미얀마 500kV 변전소 차폐보호범위 계산)

  • Park, H.S.;Kim, T.Y.;Cho, Y.S.;Park, C.S.;Joo, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.189-191
    • /
    • 2005
  • In the past, dramatic economical development of Korea could be achieved by well-organized 154kV power system network. Electric power Is a key Industry for the nation and industrial development. Nowadays we operates 345kV Power system with based transmission network and also we are operating 765kV power system to supply to the capital region. Currently developing countries in Southeast Asia are requiring the electric power technology to Korea so that they can acquire the source of the development-power system network. Therefore, it Is important to design transmission line and substation with appropriate methods. In this paper, a calculation and calculating process of shielding range using shield wires in Myanmar 500kV substation are reviewed according to the Myanmar 500kV power system project performed by the overseas projects section of the Korea Electric Power Corporation.

  • PDF

Digital Time-Domain Simulation of Ferroresonance of Potential Transformer in the 154 kV GAS Insulated Substation

  • Shim, Eung-Bo;Woo, Jung-Wook;Han, Sang-Ok
    • KIEE International Transactions on Power Engineering
    • /
    • v.11A no.4
    • /
    • pp.9-14
    • /
    • 2001
  • This paper reports a set of digital time-domain simulation studies conducted on 154 kV wound Potential Transformer(PT) int he 154 kV Gas Insulated Substation(GIS). The Electro-Magnetic Transient Program(EMTP) is used to develop the PT model and conduct the transient studies. The accuracy of the PT model is verified through comparison of the EMTP simulation results with those obtained from the field test results. The investigations shows that the developed model can accurately predict PT transient resonance, especially, the phenomenon of ferroresonance. The model is developed not only to determine impact of transients on PT response but also to design ferroresonance suppressor devices of PT. And it can also be used to predict PT transient response on power system monitoring and protection scheme.

  • PDF