In a coaxial magnetic gear, bridges connecting separate pole pieces are useful for fabrication and also improve mechanical reliability. However, they have a negative influence on electromagnetic performance parameters such as transmission torque and iron loss. This paper investigates the effect of stationary pole pieces connected by bridges on the electromechanical characteristics. The bridge type and thickness are the main parameters influencing the performance of a coaxial magnetic gear. The inner, center, and outer bridge types each show the best performance in terms of different characteristics. However, for any bridge type, an increase in the bridge thickness reduces the overall electromagnetic performance, except for the torque ripple, and improves the overall mechanical performance, including the deformation, von Mises stress, and natural frequency of the stationary part.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.53
no.7
/
pp.473-482
/
2004
In this paper, a detection technique of initial rotor position at a standstill in Toroidal Switched Reluctance Motor(TSRM) with built-in interior central pole search coil is proposed. In case search coils are used as a position sensor, it has many advantages like low cost, decrease in the volume, high robust characteristics and wide applications. However, the initial rotor position detection is very difficult because the search coil's EMF is not exist at a standstill. In this paper, a new detection method of initial rotor position is suggested using interior central pole search coil. The simulation and experiment for the proposed method and their results support the validity of the proposed scheme by verifying the operation of a 6/4 TSRM using search coils.
The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.11
no.1
/
pp.99-105
/
1997
In the paper, aging of insulating oil in pole transformer has been studied by performing accelerated thermal aging test. Dissolved gases were extracted by air bubbling method. Concentration of dissolved gases were modified by extraction ratio of each gases in insulating oil. Aging of insulating materials were proceeded by thermal degradation and oxidation reaction. Both of the reactions followed zeroch order kinetics. Formation rate equations for hydrocarbons, carbon oxides, and hydrogen were derived. It was conformed by gas analysis and UV-Visible spectrophotometric method that iron core and copper coil in pole transformer act as catalyst during the aging process.
The Transactions of the Korean Institute of Electrical Engineers
/
v.38
no.3
/
pp.247-255
/
1989
This paper proposes an error model with integral action and a pole-place-ment self-tuning controller for robot manipulators in task coordinates. The controller can reject the offset due to any load disturbance without a detailed description of the robot dynamics. The error model parameters are estimated by the recursive least square identification algorithms, and controller parameters are determined by the pole-placement method. A computer simulation study has been conducted to demonstrate the performance of the proposed control system in task coordinates for a 3-joint and 2-link spatial robot manipulator with payload.
The Transactions of the Korean Institute of Electrical Engineers
/
v.45
no.4
/
pp.535-542
/
1996
A zero voltage switching (ZVS) three level auxiliary resonant commutated pole inverter (ARCPI) is presented for high power GTO inverters. The concept of ARCP for two level inverter is extended to the three inverter. The proposed auxiliary commutation circuit consists of one resonant inductor and two bi-directional switches, which provides ZVS condition to the main devices without increasing device voltage or current stresses. The auxiliary device operates with zero current switching (ZCS) which enables use of the low cost thyristors. The proposed ARCPI can handle higher voltage and higher power (1-10MVA) comparing to the two level one. Operation and analysis of the ARCPI are illustrated and the features are compared o those of the snubber circuit incorporated three level inverter. Experimental results with 10kW, 4kHz prototype are presented to verify the principle of operation. (author). refs., figs., tab.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.13
no.7
/
pp.583-591
/
2000
It this paper the multilayer chip band pass filter for next generation mobile communication phone is fabricated and designed. For the design the multilayer chip filter of non-contented equivalent circuit and contented equivalent circuit with attenuation pole is presented. Finally it is fabricated and designed using the multilayer chip filter of contented equivalent circuit with attenuation pole. The size insertion loss center frequency and band width of multilayer chip filter are 4.5$\times$3.2$\times$2.0[mm], 3.0[d.B] and 1945$\pm$25 MHz respectively. The multilayer chip filter was fabricated by screen printing with Ag electrode after tape casting. Simulation results of multilayer chip filter are compared with experimental results and found to be in excellent agreements.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2006.05a
/
pp.59-64
/
2006
In this paper, developed a uninterruptible hotline tools and method for replacement of strain pole crossarm on overhead distribution line. For practical use of developed tools, following direct hot-line methods were proposed: 'Direct hot-line method for replacement of pin pole crossarm', 'Direct hot-line method for alteration of crossarm' and 'Crossarm replacement method in uninterruptible cable displacement area'. These methods were proposed more simple and safe working on hotline job.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2006.05a
/
pp.426-431
/
2006
The case where a drain cannot flow backwards, a sewer institution can be unmanageable in this, and a mad is under water momentarily by local heavy nin by the climate phenomenon in spite of not being a lowlands belt has occurred well more than recently. By the flooded mea since it is in the state which has some human bodies at hand, when a short circuit occurs in street lighting pole which is the electric institution thing of a road, the danger of an electric shock accident becomes higher. In this paper, it was going to show improvement plan for grasping the brittle factor of street lighting pole electricity facilities through the on-site survey of street lighting pole electricity facilities, and improving this.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.5
/
pp.67-72
/
2011
In this study we investigate the background of UPS output transformer(${\Delta}-Y$) operation on neutral ungrounded system, and perform field experiment of neutral floating-phenomenon for the inter-locked securing of electric facilities and improvement of neutral floating-phenomenon. Experiment results show that a floating-phenomenon occurs when four-pole input-breaker trip and the neutral to earth voltage occurring concurrently is identified as phantom voltage. And the measures for the transient overvoltage that can occur in floating-state also are investigated. As a result, the risk elements of neutral ungrounded method as well as neutral floating-phenomenon are removed by installation of separate solidly-grounded transformer and switching four-pole input-breaker to three-pole input breaker.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.9
/
pp.108-113
/
2013
Change of supply voltage, customer load, output of distributed generation, etc cause voltage change in distribution system. OLTC and SVR are usually used to supply normal voltage at customer. But usage of these devices is inefficient and uneconomical in certain circumstances. To solve this problem, new pole transformer which has automatic tap changer is developed. The transformer changes tap when voltage changes. And it has latch switch and reactor for supplying power without outage. To verify normal operation of tap changer, test is conducted. SVR and 50kVA load is used for test.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.