Rapid Expansion of EVs(Electric Vehicles) is inevitable trends, to comply with eco-friendly energy paradigm according to Paris Agreement and to solve the environment problems such as global warming. In this paper, we analyze the limit point of transformer acceptable capacity as the increase of power demand considering EVs supply in the near future. Through the analysis of transformer utilization, we suggest methods to analyze the spare capacity of transformer for the case of optimal efficiency operation and emergency operation respectively. We have the results of 18.4~29% spare capacity for the charging infrastructure to the rated capacity of transformer by analyzing the existing sample apartments. It is analyzed that the acceptable number of EVs is 0.09~0.14 for optimal efficiency operation and 0.06~0.13 for emergency operation. Therefore, it is analyzed the power demand of EV will exceed the existing transformer spare capacity in 7~8 years as the annual growth rate of EVs is prospected 112.5% considering current annual growth rate of EVs and the government EV supply policy.
Hybrid transformer means the distribution transformer, one of multi-function transformer equipped with the enhancement function of harmonics and unbalance. In other words, since existing transformer are equipped simply with transformation function only, a separated electric facility should be additionally installed in order to reduce the mutual harmonics and unbalance. Meanwhile, since hybrid transformer can perform the reduction of harmonics and unbalance as well as transformation function simultaneously through zigzag winding, it doesn't need any additional electric facility. This study addressed the issue of developing and testing the performance of a generator that would reduce the harmonics supplied to the grid when grid-connected with the output of a photovoltaic inverter for photovoltaic generation system.
본 논문에서는 유한요소법을 이용하여 2[MVA] 몰드변압기의 전계분포에 대한 기포의 영향을 분석하였다. 1차로 기포가 없을 때 전계해석을 하고, 다음으로 전계의 세기가 가장 큰 부분에 에폭시 절연물 내부에 기포가 발생한 경우 전계의 영향을 분석하고 전계분포를 해석하였다. 또한 기포에 의해 생기는 부분방전 개시전압에 대해서도 예측하였다. 해석 조건으로서 기포의 크기, 위치, 개수 및 형상에 대하여 해석하고, 해석 조건에 따른 전계의 영향에 대해 비교 검토하였다.
A growing number of gas-insulated transformers in underground power substations in urban areas are approaching 20 years of operation, the time when failures begin to occur. It is thus essential to prevent failure through accurate condition diagnosis of the given facility. Various solid insulation materials exist inside of the transformers, and the generated decomposition gas may differ for each gas-insulated equipment. In this study, a simulation system was designed to analyze the deterioration characteristics of SF6 decomposition gas and insulation materials under the conditions of partial discharge and thermal fault for diagnosis of gas-insulated transformers. Degradation characteristics of the insulation materials was determined using an automatic viscometer and FT-IR. The analysis results showed that the pattern of decomposition gas generation under partial discharge and thermal fault was different. In particular, acetaldehyde was detected under a thermal fault in all types of insulation, but not under partial discharge or an arc condition. In addition, in the case of insulation materials, deterioration of the insulation itself rapidly progressed as the experimental temperature increased. It was confirmed that it was possible to diagnose the internal discharge or thermal fault occurrence of the transformer through the ratio and type of decomposition gas generated in the gas-insulated transformer.
Transformer is widely used element on power system and industrial area. Especially the transformers installed at power system are exposed to an environment of arbitrary changed. Thus the prediction of degradation and the analysis of response to impulse are important. To conduct those works, the electrical characteristics of system should be analyzed, effectively. But the analysis of electrical characteristic in electric machine level such as pole and pad-mounted transformer is almost no, thus commercial VNA (Vector Network Analyzer) is used to getting the response in wide frequency range. However, the output power of VNA is usually under 10mW, so verification for effectiveness of measuring electrically large component should be conducted, firstly. Next, after getting total S-parameter of transformer, predicting impulse response can be performed in time-domain with circuit simulator. In this paper, it is introduced that verification effectiveness of VNA using transfer function from SFRA (Sweep Frequency Response Analyzer), firstly. Next, total S-parameter, six by six matix form, was built using measured 2 port S-parameter from vector network analyzer. To get the response to impulse which is defined by IEC 60060-1, time-domain simulation is conducted to ADS (Advenced Design System) circuit simulator.
As the electric system is getting larger to meet the increasing demand for electric power, the rating of power apparatus is becoming inevitably higher in its working voltage and larger in its capacity. According to KEPCO reports, power transformers in the KEPCO system have undergone troubles such as winding short insulation breakdowns every year since 1981. the cause of this troubles were high one line grounding fault currents in KEPCO systems that had direct grounding systems. KEPCO has installed the NGR(neutral grounding reactor) to lower this fault current and reduced winding short insulation breakdowns in power transformers. But when a circuit breaker opened a no load bus, some trips of circuit breakers for protecting transformer have occurred by mal-operation of 59GT(overvoltage ground relay) that detect disconnection of NGR. Therefore, in this paper, we analyzed the cause and examined the effect of time delav circuit to prevent wrong operation of 59GT.
Comparative analysis of driving inverters for piezo-electric transformer (PT) is performed and the suit- able drive circuit for portable devices such as personal digital assistants (PDA) is chosen with the experiment in this paper. As a result, a single-switch inverter with a small two winding reactor is chosen, and then the advantages of this method are clarified. It is also confirmed that the driving inverter with this method enables to realize a stabilized AC 400v output and 82% power efficiency from DC 3V input under the conditions of the variations of load current or input voltage from the experiments. Piezo-electric Transformer, Back-Light System, Single-Switch Driving Circuits, Control Method
Recently, the study for development of system having affinity for environment is on investigation. This issue is also applicable to transportation system. This paper suggested the inductive power transformer used for the road/railway applied to contactless power transfer system. The two secondary windings, large gaped magnetic structure and horizontal alignment between primary and secondary coil for that transformer approach a process for improvement of contactless power transfer system performance.
Kim, Jae-Chul;Jeon, Hee-Jong;Kong, Seong-Gon;Yoon, Yong-Han;Choi, Do-Hyuk;Jeon, Young-Jae
한국지능시스템학회논문지
/
제7권1호
/
pp.45-53
/
1997
This paper presents hybrid expert system for diagnosis of electric power transformer faults. The expert system diagnose and detect faults in oil-filled power transformers based on dissolved gas analysis. As the preprocessing stage, fuzzy information theory is used to manage the uncertainty in transformer fault diagnosis using dissolved gas analysis. The Kohonen neural network takes the interim results by applying fuzzy informations theory as inputs, and performs the transformer fault diagnosis. The Proposed system tested gas records of power transformers from Korea Electric Power Corporation to verify the diagnosis performance of transformer faults.
Recently, unusual transformer failures have been reported in 25kV power systems connected with a VCB and transformer. In this study, performance of the protection system, dielectric strength of the transformers, characteristics of switching surges and resonance phenomena were analysed and assessed. All investigations regarding the insulation breakdown of the transformers were carried out by simulations, laboratory tests, factory tests and on-site measurements in order to thoroughly investigate the root causes. Furthermore, experimental methods for investigating the resonance phenomenon were derived and tests were conducted applying the derived method to recreate the phenomenon in the transformer. It is found that resonance between the transformer and switching surge generated by closing a VCB can initiate the breakdown of internal windings of a transformer.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.