Aiming at the negative sequence and harmonic problems in the operation of railway static power conditioners, an optimization compensation strategy for negative sequence and harmonics is studied in this paper. First, the hybrid RPC topology and compensation principle are analyzed to obtain different compensation zone states and current capacities. Second, in order to optimize the RPC capacity configuration, the minimum RPC compensation capacity is calculated according to constraint conditions, and the optimal compensation coefficient and compensation angle are obtained. In addition, the voltage unbalance ${\varepsilon}_U$ and power factor requirements are satisfied. A PSO (Particle Swarm Optimization) algorithm is used to calculate the three indexes for minimum compensating energy. The proposed method can precisely calculate the optimal compensation capacity in real time. Finally, MATLAB simulations and an experimental platform verify the effectiveness and economics of the proposed algorithm.
This paper presents a novel fault location scheme on Korean AC electric railway systems. On AC railway system, because there is a long distance, 40 km or longer, between two railway substations, a fault location technique is very important. Since the fault current flows through the catenary system, the catenary system must be modeled exactly to analyze fault current magnitude and fault location. In this paper, before suggestion for the novel scheme of fault location, a 9-conductor modeling technique that includes boost wires and impedance bonds is introduced, based on the characteristics of Korean AC electric railway. After obtaining a 9-conductor modeling, the railway system is constructed for computer simulation by using PSCAD/EMTDC. By case studies, we can verify superiority of a new fault location scheme and suggest a powerful model for fault analysis on electric railway systems.
Due to increasing demands for environment-friendly railway system, bronze wires with cadmium, which is a potential environmental hazard, have been no longer permitted as messenger wire for electric railway system. One of materials being considered as the replacements is copper-clad steel conductor(CCSC), which is currently used as contact wire for high speed operation in the Japanese shinkansen. However, there have been few studies for the application as messenger wire by the CCSC. This study deals with requirements and performances of the messenger wire stranded by the CCSC, especially for high speed electric railway. And the tentative evaluation items and methods to be specified as the Korean railway standard(KRS) are proposed.
Polymer stem insulator for an electric railway has been developed in 1995 in Korea. Owing to its excellent electrical and physical characteristics, KT mark was awarded for the developed polymer stem insulator. After new specification of KNR(Korea National Railway) was established, tile evaluation of long-term reliability combined with the improvement of manufacturing process was carried out. In 1998, this polymer stem insulator was installed in commercial electrical railway line. This paper presents the long-term reliability properties of the installed polymer stem insulator compared with conventional insulator. The location of tile installed polymer stem insulator in KNR is also introduced.
전기철도(Electric Railway) 실용화 - 1879년 베를린(Berlin) 산업박람회에서 시멘스 할스케 (Siemens Halske) 회사가 소형 전기기관차로 객차 3량을 속도 12[Km/h]로 견인 운전 전기철도(Electric Railway) 상업운전 - 시멘스 할스케 회사가 1881년에 베를린시 부근의 리히테르펠데(Lichterfelde)에 전기철도를 건설하여 전기차에 의한 일반여객 수송(중략)
In this paper, we proposed a DC electric railway system that composed of a 3-phase voltage source converter (VSC) and a bidirectional DC-DC converter. The proposed electric railway system is modeled and simulated to show the feasibility in MATLAB/Simulink.
High quality power supplying of power distribution system in electric railway system is the important function. Power feeding system is complicated witch is compose with distribution line, circuit break, protection facilities and so on. Among this components, role of substation is most important for elevation of reliability in electric power system. Therefore, the enhanced reliability considering the preventive inspection, repair work, replacement is necessary. In this study, a proposed the enhanced reliability method through a calculation of fault probability in power feeding system.
Owing to the consistent increase in accurate analysis issue for energy consumption of the AC electric railway systems, there is controversy about the adequacy of the present watt-hour metering configuration. Due to the unusual load characteristics and facilities, the discussions have not been active. Therefore, in order to achieve more accurate watt-hour metering for AC electric railway system, this paper proposes numerical formulas for watt-hour metering that reflects the highly-varying characteristics of the railway load and the structural characteristics of the Scott transformer. The proposed formulas have been verified by comparison with site-measured data, and a more suitable metering configuration for AC railway system has been proposed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.10
/
pp.5148-5155
/
2013
The induced voltage on the telecommunication cable generated by nearby electric railway system may bring about telecommunication errors and safety accidents. In order to reduce the induced voltage and to achieve communication reliability, the effect of the shield cables and the recent double-track railway systems on the inductive interference should be investigated. This paper analyzes the parameters which seriously influence the induced voltage on the telecommunication cables which run parallel with a AT-fed electric railway line, and provides a simulation-based approach to estimate the amount of the induced voltage. Simulation results indicate that the induced noise voltage generated by a double-track railway decreases by 18 % compared to that generated by a single-track railway, showing the screening effect by nearby track. The induced noise voltages on the 50%-shielded cable and 15%-shielded cable decrease to 1/8 and 1/15 of the induced voltage on the non-shielded cable, respectively. A meaningful shield effect is achieved and the induced voltage is minimized by the double-track railway and the shielded cable.
Lee Chang-Mu;Lee Han-Min;Han Moon-Seob;Kim Joo-Rak;Jung Ho-Seong
Proceedings of the KSR Conference
/
2004.10a
/
pp.1384-1389
/
2004
The primary objective of this paper is to examine the capacity of electrical transmission in electric railway feeding system. Although supply capacity of railway substation are sufficient and there is no accident, due to the electrical transmission limit of feeding line the voltage breakdown may occur when large capacity of electric load at feeding line exist. So, using multi-port analysis model, we draw P-V curve due to the length of feeding line, load, location and power factor of electric locomotive. And through case study, compare measurement result and simulation result
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.