• Title/Summary/Keyword: Earthwork Surveying

Search Result 30, Processing Time 0.019 seconds

Accuracy Analysis of Earthwork Volume Estimating for Photogrammetry, TLS, MMS (토공사 계측 방식(Photogrammetry, TLS, MMS)별 토공량 산정 정밀도 분석)

  • Park, Jae-Woo;Yeom, Dong-Jun;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.4_2
    • /
    • pp.453-465
    • /
    • 2021
  • Recently, photogrammetry, TLS(Terrestrial Laser Scanner), MMS(Mobile Mapping System)-based techniques have been applied to estimate earthwork volume for construction management. The primary objective of this study is to analyze the accuracy of earthwork volume estimating between photogrammetry and TLS, MMS that improves the traditional surveying method in convenience, estimating accuracy. For this, the following research works are conducted sequentially; 1) literature review, 2) core algorithm analysis, 3) surveying data acquisition using photogrammetry, TLS, MMS, 4) estimated earthwork volume comparison according to surveying method. As a result of the experiment, it was analyzed that there were earthwork volume errors of 1,207.5m3 (14.03%) of UAV-based digital map, 391.5m3(4.55%) of UAV, TLS integrated digital map, and 294.9m3(3.43%) of UAV, MMS integrated digital map. It is expected that the result of this study will be enormous due to the availability of the analyzed data.

UAV Utilization for Efficient Estimation of Earthwork Volume Based on DEM

  • Seong, Jonghyeun;Cho, Sun Il;Xu, Chunxu;Yun, Hee Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.5
    • /
    • pp.279-288
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction, in which new technologies such as UAV (Unmanned Aerial Vehicle) are fused, is attracting attention in the construction field. However, the method of estimating earthwork volume using DEM generated by UAV survey according to practical regulations such as construction design guidelines or standard product counting is not officially recognized and needs to be improved. In this study, different types of UAV were measured and DEM was obtained using this data. The DEM (Digital Elevation Model) thus obtained was analyzed for changes in the amount of earthworks according to the size of the GSD (Ground Sample Distance). In addition, the amount of earthwork by DEM and the amount of earthwork by existing design drawings were compared and analyzed. As a result of the study, it was suggested that images with a GSD of 5cm or less are effective to generate a high-quality DEM. Next, as a result of comparing the earthwork volume calculation method using DEM and the earthwork volume based on the existing 2D design drawings, a difference of about 1% was shown. In addition, when the design earthwork amount calculated by the double-section averaging method was compared with the designed earthwork amount using DEM data by UAV survey, a difference of about 1% was found. Therefore, it is suggested that the method of calculating the amount of earthworks using UAV is an efficient method that can replace the existing method.

A study on the comparison of accuracy of evaluation method of earthwork volume using on DTM (DTM에서 토공량의 산정방식에 따른 토공량의 정확도 비교)

  • 문일석;전재홍;조규전
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.13 no.2
    • /
    • pp.277-283
    • /
    • 1995
  • In the study, an accuracy of earthwork volume is evaluated according to different methods of the calculation with different criteria. The criteria applied to this study are a interpolation method, a grid intavals and the method of earthwork evaluation. A numerical test has performed on two different terrain models with four different methods of calculation in the earthwork volume and two different grid intervals. The end area method, prismoidal formular, Simpson's formular, and middle area method are applied to the calculation of the earthwork volume. As a result of this study, it is showed that the moving average method with the first order term gives the most accurate result in interpolation, and that also the prismoidal formular and Simpson's formular gives more accurate result than average and area method and middle area method in the calculation of earthwork volume.

  • PDF

A Study on the Earthwork Volumes Using Geographic Information Systems (지형정보체계를 응용한 토양에 관한 연구)

  • 신봉호;엄재구;양승용;송원재
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.12 no.2
    • /
    • pp.181-186
    • /
    • 1994
  • This paper applicate the digital elevation model(DEM) method in geographic information systems(GIS) on the earthwork volumes, intending to present an efficient geographic information-obtain method and an optimum earthwork volumes method after analyzing the obtain method of geographic informations which are made up of as spatial data(X, Y) and attribute data(Z), analyzing area determination method by geographic information-obtain method each other and the accuracy of earthwork volumes computation. The results of this paper showed that the method of earthwork volumes computation, which was based on the earthwork volumes-calculation grid applied by the DEM method of based grid to randomly get the geographic information of geographic transformation point and translated geography into nonlinear and unequal interval, was very efficient.

  • PDF

The Determination of Earthwork Volume using LiDAR Data (LiDAR 데이터를 이용한 토공량 산정)

  • Kang Joon-Mook;Yoon Hee-Cheon;Min Kwan-Sik;We Gwang-Jae
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.533-540
    • /
    • 2006
  • In recent years, civil-engineering work is desired the terrain information to be more efficient in earthwork volume calculation. One method for collecting elevation data is LiDAR. Lidar data was used to produce rapidly an accurate digital elevation model of the terrain, compared with the conventional ground surveys, photogrammetty, and remote sensing. Raw Lidar data is combined with GPS positional data to georeference the data sets. Lidar data is edited and processed to generate surface models, elevation models, and contours. Here we can either create a Tin Volume Surface or a Gird Volume Surface. Triangulated Irregular Network(TIN) has complex data structure, but it can describe well terrain surface features. As we have seen, we search the efficiency for earthwork volume calculation using Lidar data. One conclusion we can draw from this study is that Lidar data is more accurate result than digital map in the calculation of earthwork volume.

  • PDF

System Improvement for Application and Diffusion of Earthwork Surveying Automation Technology (토공측량 자동화 기술의 적용 활성화를 위한 제도개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.303-313
    • /
    • 2018
  • The purpose of this study is digitalization of earthwork such as development of 3D terrain analysis platform using latest technologies including unmanned aerial vehicle and terrestrial laser scanner to ultimately achieve earthwork automation. It is necessary to develop related element technologies and to establish regulations so that it can be applied to the domestic construction projects. As a result of pilot project about the earthwork surveying automation technology, it was confirmed that information such as terrain coordinates, soil, boring, and excavation volume is acquired smoothly. In this paper, we investigate related regulations and manuals in Japan and propose the improvement plan of domestic regulation. We plan to study regulations from early to final construction stage, combine with the 'regulation for public surveying', and improve the regulations in detail.

On the Earthwork Volume Decision Using Spline Surfaces (스플라인 곡면을 이용한 토공량 결정에 관한 연구)

  • 류재칠;이승훈;문두열
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.1
    • /
    • pp.85-92
    • /
    • 2002
  • The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to advanced the accuracy of earthwork calculation. Current methods used for estimating the volume of pit excavation assumes that the ground profile between the grid points is linear(trapezoidal rule), or nonlinear(simpson's formulas). Generally speaking, the nonlinear profile formulas provide better accuracy than the linear profile formulas. However, all the formulas mentioned have a common drawback to ground profile, such as sharp corners or the grid points of any two straight lines. In this paper, we propose an algorithm of finding a spline surface which interpolates the given data and an appropriate method to calculate the earthwork. We present some computational results showing that our proposed method provides better accuracy than Chen and Lin's method.

A Study on the Predictional Model for Accuracy of Earthwork Calculation by Digtal Terrain Model (수치지형모델에 의한 토공양계산 정확도의 예측모델에 관한 연구)

  • 오창수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.5 no.1
    • /
    • pp.49-58
    • /
    • 1987
  • The use of digital terrain model has been enlarged in calculating the earthwork due to the development of aerial photogrammetry. The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to advance the accuracy of earthwork calculation. In this study, I have made an analysis of influences which DTM makes on the height accuracy of data ; on the basis of the analysis, we can develop the predictive model formula of profile shape coefficients by which the accuracy of earthwork can he preestimated in practical design according to data density of terrain, making thereby good contribution to the calculation of both earthwork amount and its expenses. This study shows that the accuracy of earthwork is more affected by the distances of cross-sections than by data density and that the effects by the standard errors of height decrease in proportion as the distances of cross-sections are great It also shows that when the prediction model formula of profile shape coefficients is applied to ordinary cases, the differences between the predicted earthwork errors and the errors by ordinary est imation are at 0.8374~3.1437$cm^3$/m, on flat terrain and 1.5628~6.967$cm^3$/m, on mountainous terrain-so little as to be ignored ; thus it can be safely ascertained that the accurate earthwork errors can be predicted applying the prediction model formula made in this study.

  • PDF

Earthwork Volume Calculation of Anchorage Underground Capacity Using Laser Scanner (레이저스캐너를 이용한 앵커리지 지하공동의 토공량 산정)

  • Choi, Seok-Keun;Kim, Dong-Yeun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.3
    • /
    • pp.21-27
    • /
    • 2010
  • When the capacity of underground caverns' structures is measured, a general surveying is difficult to decide an accurate section of irregular shape and a photographic surveying has problems on picture acquisition due to underground dusts, noise and lighting conditions, etc. The laser scanner system is being much used for 3-dimensional modeling such as topography, planimetric features and structures, etc. without a target by measuring arriving time of a laser pulse reflected after scanning the laser pulse and calculating space coordinates of the reflection position. Accordingly, the present research carried out section and earthwork volume measurement of a tunnel by using a laser scanner in underground anchorage excavation work that a bridge construction is being executed.

A Study on the Earthwork Calculation Using Photogrammetry (사진측량을 이용한 토공량 결정에 관한 연구)

  • 유복모;유용택;이변직
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.8 no.1
    • /
    • pp.41-50
    • /
    • 1990
  • The purpose of this thesis lies in proving the practicality of photogrammetry and in promoting photogrammetry in earthwork which plays a major role in civil engineering projects. Analysis of accuracy in the determination of ammount of earthework was done by applying interpolation methods in digital terrain model. As a result of analysis of the data acquisition method, in cross-section method produced acceptable accuracy from Simpson's three-eighths rule and prismoidal rule. In results DTM, we have obtained the fact that earthwork calculation accuracy was increased by applying two or more interpolation methods. Therefore, the method by digital terrain model using aerial photograph has proved to be more efficient.

  • PDF