• Title/Summary/Keyword: Earth ground

검색결과 1,612건 처리시간 0.03초

Analysis of Complex Ground Systems using Electromagnetic Simulation Method (전자계 시뮬레이션 도구를 이용한 복합 형상의 접지 시스템 해석)

  • Kim, Youngjin;Kim, Jaehyung;Kim, Sungju
    • Journal of the Korean Society of Safety
    • /
    • 제31권1호
    • /
    • pp.48-53
    • /
    • 2016
  • This paper deals with analysis of complex grounding system using electromagnetic simulation method. Electrical devices could be damaged by transient voltage such as a lightning surge. Therefore the measures to protect the equipments from transient, such as a lightning are required. The ground system is important in this respect. The representative parameter of grounding system performance is earth ground resistance. Precise prediction of earth resistance is required, because it is difficult to modify and change after the completion of the grounding system construction. Numerical modeling is often used in numerical analysis to identify the electrical characteristics of the grounding system. However complex systems are difficult to predict grounding characteristics by numerical analysis. If the total electric field of the earth in general is similar to the antenna model, in that the incident electric field and expressed as a sum of the scattering field. In this study, the electromagnetic field simulation tool "ANSYS HFSS" module containing the antenna model was used to analyze performance of ground system. Both the simple and complex grounding system were analyzed by simulation tool and experimental method. As a result simulation method is effective to predict performance of a complex ground system.

NATE터널의 갱문 가시설 배후 균열에 따른 조치 및 보강사례

  • Kil, Ho-Un;Kim, Jin-Hong;Yoo, Jai-Sung;Cha, Bok-Nam
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.342-355
    • /
    • 2006
  • The Tunnel portal is designed on temporary support system which is composed by 28m height H-Pile method and Ground Anchor method. The tunnel has excavated about 30m from the portal, but some deformation is found on the surface ground just above the tunnel face. It was investigated very carefully to find out the causes of deformation. By the observation and study, two main causes of deformation are found out. The one is earth pressure increase compared with classical earth pressure theory. That was due to the direction of ground rock mass's discontinuities. It causes the increase of earth pressure that are activated by the direction of discontinuity. The other one is that present design method neglect the transferred force by removal of temporary support members and ground anchor within the tunnel contour line as the tunnel excavation proceeds As the result of removals of the member and anchor, some force transferred from removed systems to remaining supporting systems. In designing the portal support systems, lt must be considered the discontiunity of ground mass and the transfered force due to excation.

  • PDF

Methodology to Measure Stress Within Sand Ground Using Force Sensing Resistors (박막형 압전 센서를 활용한 사질토 지반 지중 응력 측정 방법론)

  • Kim, Dong Kyun;Woo, Sang Inn
    • Journal of the Korean Geotechnical Society
    • /
    • 제40권2호
    • /
    • pp.115-123
    • /
    • 2024
  • Stress is an invisible physical quantity, necessitating the use of earth pressure cells for its measurement within theground. Traditional strain-gauge type earth pressure cells, due to their rigidity, can distribute stress within the ground and subsequently affect the accuracy of earth pressure measurements. In contrast, force sensing resistors are thin and flexible, enabling the minimization of stress disturbance when measuring stress within the ground. This study developed a system that utilizes force sensing resistors to measure ground stress. It involved constructing a soil chamber for calibrating the force sensing resistors, assessing the variability of measurements from resistors embedded in sand ground, and verifying the attachment of pucks to the sensing area of the resistors.

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(I) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(I))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.308-319
    • /
    • 2009
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces two examples of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. And the sections of two examples are 50 meters apart in one construction site, they have almost similar design and construction conditions. The characteristics of ground deformation and strut axial force change were analysed, the similarity and difference between measurement results of tow examples were compared and investigated. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Earth Pressure on the Braced Wall in the Composite Ground Depending on the Depth and the Joint Dips of the Base Rocks under the Soil Strata (복합지반 굴착 시 기반암의 깊이와 절리경사에 따라 흙막이벽체에 작용하는 토압)

  • Bae, Sang Su;Lee, Sang Duk
    • Journal of the Korean Geotechnical Society
    • /
    • 제32권10호
    • /
    • pp.41-53
    • /
    • 2016
  • Stability of the braced earth wall in the composite ground, which is composed of the jointed base rocks and the soil strata depends on the earth pressure acting on it. In most cases, the earth pressure is calculated by the empirical method, in which base rocks are considered as a soil strata with the shear strength parameters of base rocks. In this case the effect of the joint dips of the jointed base rocks is ignored. Therefore, the calculated earth pressure is smaller than the actual earth pressure. In this study, the magnitude and the distribution of the earth pressure acting on the braced wall in the composite ground depending on the joint dips of the base rocks and the ratio of soil strata and base rocks were experimentally studied. Two dimensional large-scale model tests were conducted in a large scale test facility (height 3.0 m, length 3.0 m and width 0.5 m) by installing 10 supports in a scale of 1/14.5. The test ground was presumed with the base rock ratio of the composite ground of 65%:35% and 50%:50% and with the joint dips for each base rock layer, $0^{\circ}$, $30^{\circ}$, $45^{\circ}$ and $60^{\circ}$, respectively. And then finite element analyses were performed in the same condition. As results, the earth pressure on the braced wall increased as the base rock layer's joint dips became larger. And earth pressure at the rock layer increased as the rock rate became larger. The largest earth pressure was measured when the base rock rate was 50% (R50) and the rock layer's joint dips was $60^{\circ}$. Based on these results, a formular for the calculation of the earth pressure in the composite ground could be suggested. Distribution of earth pressure was idealized in a quadrangular form, in which the magnitude and the position of peak earth pressure depended on the rock ratio and the joint dips.

Performance Analysis on Combined Horizontal Ground Source Heat Pump with Earth tube using EnergyPlus (EnergyPlus를 이용한 수평형의 지열 히트펌프와 어스튜브를 조합한 시스템의 성능 검토)

  • Cho, Sung-Woo
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • 제13권2호
    • /
    • pp.22-29
    • /
    • 2017
  • This study is performed to performance of the combined system the GSHP (Ground Source Heat Pump) system with the Earth tube system using EnergyPlus program. The Earth tube system using fan is characteristics as supply lower (higher) air temperature than outdoor air temperature in cooling and heating seasons, the GSHP system is characteristics as small indoor air temperature variation range. As the results of Earth tube + GSHP system simulation, GSHP power can be reduced than the GSHP single operation as 17.3% in cooling seasons and 32.5% in heating seasons, the GSHP design capacity can be replaced more small size.

Effects of Relief Shelves on Stability of Retaining Walls

  • Ahn, Taebong
    • Journal of the Korean GEO-environmental Society
    • /
    • 제23권9호
    • /
    • pp.25-31
    • /
    • 2022
  • Attaching shelf to retaining structure leads to a decrease in the total lateral earth pressure. This decrease enables the retaining structures to become more stable, to have small displacement, and to exhibit lower bending moments, the relief shelves effects are analyzed using FEM in order to understand how they stabilize cantilever wall in this study. Several models are varied by changing location and width of shelves to realize earth pressure and displacements of retaining wall. The displacement is getting smaller because earth pressure acting on shelf increases as shelves locations are lower and width is longer. The ground settlement variation effects caused by relief shelves are studied also. The ground settlement increases abruptly where shelf location is between of 0.5H and 0.625H, and settlement decreases suddenly where shelf width is between b/h=0.375 and b/h=0.500. The shelf significantly reduces earth pressure and movement of the wall. This decrease in the lateral pressure increases the retaining structure stability.

HYPERSPECTRAL IMAGERY AND SPECTROSCOPY FOR MAPPING DISTRIBUTION OF HEAVY METALS ALONG STREAMLINES

  • Choe, Eun-Young;Kim, Kyoung-Woong;Meer, Freek Van Der;Ruitenbeek, Frank Van;Werff, Harald Van Der;Smeth, Boudewijn De
    • Proceedings of the KSRS Conference
    • /
    • 대한원격탐사학회 2007년도 Proceedings of ISRS 2007
    • /
    • pp.397-400
    • /
    • 2007
  • For mapping the distribution of heavy metals in the mining area, field spectroscopy and hyperspectral remote sensing were used in this study. Although heavy metals are spectrally featureless from the visible to the short wave infrared range, possible variations in spectral signal due to heavy metals bound onto minerals can be explained with the metal binding reaction onto the mineral surface. Variations in the spectral absorption shapes of lattice OH and oxygen on the mineral surface due to the combination of heavy metals were surveyed over the range from 420 to 2400 nm. Spectral parameters such as peak ratio and peak area were derived and statistically linked to metal concentration levels in the streambed samples collected from the dry stream channels. The spatial relationships between spectral parameters and concentrations of heavy metals were yielded as well. Based on the observation at a ground level for the relationship between spectral signal and metal concentration levels, the spectral parameters were classified in a hyperspectral image and the spatial distribution patterns of classified pixels were compared with the product of analysis at the ground level. The degree of similarity between ground dataset and image dataset was statistically validated. These techniques are expected to support assessment of dispersion of heavy metal contamination and decision on optimal sampling point.

  • PDF

The Ground Reinforcement on Daylight Collapsed Block of Crown Head in the Face of the Tunnel of Highway (고속도로 터널막장 천단부의 붕락구간에 대한 지반보강)

  • 천병식;정덕교;한기식;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.323-330
    • /
    • 1999
  • Daylight collapse have been occurred by about 5.0m deep at ground surface and collapse of the crown head part of the tunnel have connected to the ground surface during first step of shotcrete work after blasting of upper half section of the tunnel driving at two-way double track tunnel face section on highway construction. This study is for a successful illustration case for the earth improvement method through applying such strengthening methods as cement milk grouting, S.G.R grouting,, steel pipe reinforced multi-step grouting etc. for the purpose of earth strengthening of loosened earth block occurred by tunnel collapse.

  • PDF