• Title/Summary/Keyword: Earth construction

Search Result 1,220, Processing Time 0.028 seconds

Application of GIS Based AHP for Route Location (노선 선정에서 계층분석과정을 이용한 GIS의 적용)

  • Roh, Tae Ho;Jeong, In Ju;Lee, Sung Rock
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.8 no.2
    • /
    • pp.55-67
    • /
    • 2005
  • This study presented the route location method by applying AHP and evaluating quantitatively. This study developed the program that can be easily applied to this kind of road design, and built the decision support system for route location. The study results are summarized as follows ; We could quantitatively evaluate the appropriateness of exiting routes by applying the AHP based on GIS. If we apply this to the roads that will be newly constructed, we can make the objective and reliable route location when making road plans and basic designs. We improved the technique of route location by applying the decision support system with third-dimensional data, which considers even the vertical alignment plan, to the existing decision support system with second-dimensional data. And, since we can set those data such as vertical slope, earth-volume, structure size, location and construction cost to independent variables, we can make road designs more scientifically and reasonably.

  • PDF

Seismic Design of Sheet Pile Walls Used in Harbor Construction (항만공사에 이용되는 널말뚝의 내진설계)

  • Kim, Hong Taek;Bang, Yoon Kyung;Kang, In Gyu;Cho, Won Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.4
    • /
    • pp.171-187
    • /
    • 1991
  • In the present study, an analytical solution method is proposed for the seismic design of cantilever sheet pile walls and anchored sheet pile walls used in harbor construction. Seepage pressures, together with a change in magnitudes of effective horizontal soil pressures, are included in the proposed solution method. Also, the Mononobe-Okabe analysis as well as the Westergaard and Matsuo-Ohara theory of hydrodynamic pressures is used in the proposed method. Further, the choice of values for safety factors is examined for the seismic design of anchored sheet pile walls, and the effects of various parameters(dredge line slope, differential in water levels, anchor position, and wall friction angle) on embedment depth, anchor force, and maximum bending moment are analyzed for anchored walls in dense sand deposits. In addition. the tables that could be used for preliminary seismic design of anchored walls in dense sands are presented. The proposed method deals with the sheet pile walls with free earth support.

  • PDF

Benthic Environment and Macrofaunal Community Changes During the Dike Construction in Saemangeum Subtidal Area, Korea (새만금 방조제공사로 인한 조하대 환경과 저서동물 군집 변화)

  • An, Soon-Mo;Lee, Jae-Hac;Woo, Han-Jun;Koo, Bon-Joo;Lee, Hyung-Gon;Yoo, Jae-Won;Je, Jong-Gil
    • Ocean and Polar Research
    • /
    • v.28 no.4
    • /
    • pp.369-383
    • /
    • 2006
  • The Saemangeum project is one of the biggest reclamation efforts in Korea and may cause coastal ecosystem change due to altered environments and habitat loss. Since February 2002, benthic environment and community structure in the Saemangeum studied area were studied to assess the influence of the project on macrofaunal community. The result of seasonal study from February, 2002 to August 2005 is reported here. Overall, changes of species numbers and dominant species of benthic animals in the periods before (1988) and after $(2002{\sim}2005)$ the Saemangeum dike construction were not evident both inside and outside the dike. However, local environmental and community change were noted The partial completion of Saemangeum dike $(4^{th}\;dike)$ in June 2003 altered water circulation and sediment deposition patterns both inside and outside the dike. Fine sediment was accumulated inside and outside the $4^{th}$ dike while coarse sediment dominated near the main channel (Sinsi gate). Benthic community resl)ended to the altered sediment type in these areas. Species number and diversity in both site was low compared to other sites. The dominant species in these areas were composed of the benthos that had not commonly occurred in the Saemangeum subtidal area.

Weathering Characteristics of On-Yang Gneiss using Ground Penetrating Radar (지표투과레이다(Ground Penetrating Radar)를 이용한 온양편마암의 풍화특성 고찰)

  • Shin, Sung-Ryul;Park, Boo-Seong;Jang, Won-Il
    • Geophysics and Geophysical Exploration
    • /
    • v.2 no.1
    • /
    • pp.1-7
    • /
    • 1999
  • We investigated the weathering characteristics of On-Yang gneiss by means of geological survey and Ground Penetrating Radar(GPR). The results of geological survey and boring show the two sets of vertical joint and horizontal joint developed by foliation which is composed of salic and melanic layers. GPR section evidently shows foliation direction and differential weathering due to discontinuity and mineral composition of metamorphic rock. The GPR section for instantaneous phase attribute based on complex trace analysis evidently shows continuity and foliation direction of metamorphic rock. The strong reflection amplitude which is derived from the banded structure of weathered rock can be incorrectly interpreted as a reflection of bedrock. The depth of rock basement should be estimated from the overall exploration result such as boring, seismic method, and electrical resistivity method.

  • PDF

Assessment of over / under-break of tunnel utilizing BIM and 3D laser scanner (3차원 레이저 스캐너 및 BIM을 활용한 터널 과대.과소 굴착 평가)

  • Park, Jeong-Jun;Shin, Jae-Chou;Hwang, Ju-Hwan;Lee, Kang-Hyun;Seo, Hyung-Joon;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.4
    • /
    • pp.437-451
    • /
    • 2012
  • Application of 3D laser scanner to civil engineering is widely studied in various fields such as tunnel, bridge, calculation of earth volume, construction measurement, observation of rock joint, etc. Some studies on utilization of the 3D laser scanner for calculating the over-break and/or under-break of tunnels have also been carried out. However, in the previous research, the scanning data were usually compared with the 2D CAD blueprint results; although the shape of tunnel structure is relatively simple, for precise calculation of the over-break and/or under-break of tunnels, three-dimensional analysis based on BIM is needed. Therefore, in this paper, a new program that calculates the over-break and/or under-break of tunnels using the 3D laser scanner and the BIM is developed; moreover the effective and rapid process of data treatment is proposed. The accuracy of the developed program was verified by applying the new system to a real tunnels construction field.

Study on the measurement of blasting vibration response in construction a subway station at East gate of cultural treasure (지하철건설에 따른 문화재 보호와 동대문역사시공 보고서(1))

  • Choi, Sang-Yol;Ree, Soo-Book;Huh, Ginn;Chai, Soo-Yun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.17 no.3
    • /
    • pp.32-49
    • /
    • 1984
  • The East gate station area is 205M long and 24m deep which is located 13 meter in front of cultural treasure east gate. The area to be excavated by blasting is composed of granite rocks from 10M depth to 25M. Surface earth extends to up 10M depth. This job site has in involves heavy traffic congestion such as over 10,000 cars passing in rush hour where clossing No 1 lint of subway running 3 minitues head way. This east gate station construction is to be executed for the provent of the setting down of underground level and blasting vibration effects to cultural treasure east gate. Therefore, the caltural treasure committee approved this execution subject to the following condition. 1. Subway gelogical foundation and measured natural frequency 2. Execution of water tight wall 3. Sellection and test of damping material for wall and under rail 4. Measurement of monitoring system during the execution 5. Measurement of histogram system The above two projects was carried out by Dr. Kwang team in KAIST and prof, Han in Hanyang University under accadamic study contract. In the blasting work, for the pourpose of reduced vibration and low explosion velocity such as CCR, Kovex slurry. The 2nd, used electrical caps shall be delay cap and M/S caps in multi delay. The 3rd, drilling pattern is bench cut in open cut and applied control blasting in tunnelling and also shall drill anti-vibration holes as line drilling.

  • PDF

A Survey of the Recognition of Photovoltaic System for Building Application (태양광발전시스템의 건물 적용에 대한 인식 조사 연구)

  • Lee, Chung-Kook;Yu, Gwon-Jong;Suh, Seung-Jik
    • Journal of the Korean Solar Energy Society
    • /
    • v.23 no.1
    • /
    • pp.17-28
    • /
    • 2003
  • This study aims to investigate and analyze the overall recognition of the photovoltaic system for the application of BIPV(Building Integrated Photovoltaic) in Korea. For this purpose, a survey was carried on through questionnaires answered by 6 groups of experts such as construction engineers, registered architects, mechanical engineers, electrical engineers, university or college professors, and others who are ranked high in their companies or universities or colleges and who mostly seem to be eager to participate in the development of the PV system and to make a business of the system. The results of the survey are as follows: 1. About 95% of those experts who answered the questionnaire have known about renewable energy, and 93% of them are interested in solar energy as alternative energy 2. Host experts have a lot of information on the solar energy system, but have scanty information on the PV system. 3. The experts in the educational and research field have researched for the reasonable period of the participation in the development of the PV system and the period of making a business of the system. They judge that companies in the mechanical and electrical field will participate in the development of the PV system and will make a business of the system in 5 years. 4. The experts have thought that the PV system is designed not for economy but for the environment of the earth and that PV system technology in Korea is much lower than that in the advanced countries. 5. The experts hesitate to participate in the development of the PV system and to make a business of the system because they have little confidence in the economy of the PV system now and because they have thought that they will bear a great financial burden of construction cost 6. The experts judge that it is most desirable to apply the PV system to the rooftops of buildings. And they are greatly interested in the BIPV.

Physical and chemical analyses of ground-water by impacts of tunneling at coastal urban region in Busan (부산시 해안 인근 지역에서의 터널 굴착에 따른 지하수 거동 영향 평가)

  • Kim, Hyoung-Soo;Lee, Ju-Hyun;Ahn, Ju-Hee;Jeong, Ui-Jin;Kim, Jun-Mo;Yoon, Woon-Sang;Chung, Sang-Yong;Lee, Jin-Moo;Woo, Sang-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.457-464
    • /
    • 2005
  • In the case of tunneling, the equilibrium state of hydro-geologic environments destroy and change abruptly in some section of whole works. Specially, it's very possible for seawater to intrude toward the site of tunnel if the field is nearly located in a costal region. In this study, we have evaluated the mechanism related between groundwater flow and seawater intrusion that by impacts of tunneling. Various hydro-geological field tests have performed for getting four representative hydrogeologic properties of geologic formations such as transmissivity (T), storativity(S), longitudial dispersity(${\alpha}_L$), and effective porosity($n_e$). For the effect of tunneling, the numerical model was first simulated based on the governing equation of groundwater flow. The results showed that the maximum drawdown was 17.2m and the total inflow into the tunnel had the range from 0.48 to $3.63m^3/day/m$. Secondly, the three dimensional numerical model was analyzed to investigate a characteristic of seawater intrusion based on the previous simulated results of groundwater flow. The results showed the seawater moved as the range of $200{\sim}220m$ from the initial interface between seawater and groundwater toward the tunnel.

  • PDF

A study of tunnelling equipment development in a model test (터널굴착 시뮬레이션을 위한 터널굴착장비의 개발에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.199-207
    • /
    • 2003
  • Tunnel modelling in the field of geotechnical engineering essentially requires models of tunnelling machines and the simulation of tunnelling processes to clarify the detailed behaviour of tunnel construction. Modern advanced mechatronics, including construction processes, machinining and control technologies, are making it possible to fabricate such models. These technologies, however, are essentially developed in a gravity field condition and are needed to examine in a 1g or cenrifuge field condition. This paper presents the simulation method for tunnelling processes and the design method for tunnelling machines with special reference to the problem of earth pressure acting on the lining of a shield tunnel. The paper then introduces and verifies the design method for tunnelling machines in the 1g field by means of checking the reproduceability of experiment data and their comparison with data in the field.

  • PDF

Inversion of spectral analysis of surface waves with analytic Jacobian (해석적 자코비안을 이용한 표면파 기법의 역산)

  • Ha, Hee-Sang
    • Journal of the Korean Geophysical Society
    • /
    • v.5 no.3
    • /
    • pp.233-245
    • /
    • 2002
  • The spectral-analysis-of-surface-waves (SASW) method is a nondestructive testing method based upon generation and detection of elastic stress waves. SASW is widely used as one of the techniques to determine stiffness profile in engineering geophysics. The essential steps involved are construction of an experimental dispersion curve from data collected in situ, and inversion of the dispersion curve to determine the stiffness profile. The main object of this study is to derive an analytical Jacobian for the inversion. If we set the subsurface to N homogeneous layer, it could save 2N times Jacobian calculation compared to numerical jacobian calculation during inversion. To reconstruct a stiffness profile, constrained damped least square method was applied for the inversion. The algorithm was tested for the numerical data and for the real asphalt and tunnel data, which were able to verify the stiffness profile. The stiffness profile reconstructed by the algorithm showed the possibility to appraise the soundness of tunnel with applications SASW.

  • PDF