• Title/Summary/Keyword: Earth construction

Search Result 1,220, Processing Time 0.029 seconds

Performance Evaluation for All-In-One Construction Method of Curbstone and Gutter Using Formwork Rail and Jig (거푸집 레일과 지그를 이용한 경계석 및 측구의 일체형 시공법에 대한 성능평가)

  • Choi, Jae-Jin;Ko, Man-Gi;Kim, Kyoung-Ju;Choi, Khyung-Dong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6A
    • /
    • pp.525-534
    • /
    • 2010
  • A road curbstone is a structure installed at the boundary of the sidewalk and the street with the objectives of road drainage, drawing attention and such. The current general construction method of curbstones places foundation concrete for the curbstones first, waits until the concrete reaches the strength to support the curbstones, places the curbstones on top, and then places the gutter and rear filling concrete. Such method has the issues of poor compaction and weakened bond strength of concrete due to split placing of concrete, and causes the curbstones to easily separate due to vehicle impact or earth pressure, in turn creating maintenance costs and spoiling the aesthetics. To improve such conventional construction methods, an all-in-one method was developed using formwork rail and jig where both the curbstones and gutter can be worked at the same time, and to evaluate the structural performance, static tests of lateral loading test, pullout test, and bending test were executed, and dynamic tests such as pendulum test and actual vehicle impact test were executed. In all tests, the all-in-one construction method using formwork rail and jig was shown to be superior to the conventional construction method by the increase of construction quality and bond strength of concrete.

Experimental Study on Long-Term Performance Evaluation of Geosynthetic Strip Reinforcement (띠형 섬유보강재의 장기성능 평가를 위한 실험적 연구)

  • Lee, Kwang-Wu;Kim, Ju-Hyeung;Cho, Sam-Deok;Han, Jung-Geun;Yoon, Won-Il;Hong, Ki-Kwon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.4
    • /
    • pp.75-84
    • /
    • 2010
  • In this study, the long-term performance tests, which have extensibility, creep deformation, installation resistance and durability characteristic, is conducted to apply geosynthetic strip in field. The strength reduction factors using the test results are evaluated in order to calculate long-term design tensile strength. First, the creep deformation was evaluated by both the stepped isothermal method(SIM) and the time-temperature superposition(TTS) method. The creep reduction factor is reasonable to apply 1.6. Second, the result of installation damage test had little damage of yarn, which affected strength of reinforcement. Therefore, it can be analyzed that the installation damage of geosynthetic strip has little effect of long-term design tensile strength. Finally, the durability reduction factor considering chemical, biological and outdoor exposure resistance is reasonable to apply 1.1, which is considered the stability and economic efficiency of reinforced earth wall using geosynthetic strip.

  • PDF

Estimating Sea Surface Temperature Change after Tide Embankment Construction using Landsat Data (방조제 건설에 의한 해수면 온도 변화 추정)

  • Shin, Dong-Hoon;Lee, Kyoo-Seock
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.4
    • /
    • pp.224-232
    • /
    • 2006
  • This study investigates to detect Sea Surface Temperature (SST) and land cover change after tide embankment construction using Landsat Thematic Mapper (TM) Thermal Infrared (TIR) band data at Shihwa Lake and surrounding area. SST measurement is important for studies of both the structure of the ocean and as the thermal boundary between the ocean and the atmosphere. Since 1970s, the derivation of SST by satellite remote sensing (RS) has been applied to earth surface using Advanced Very High Resolution Radiometer (AVHRR) and Landsat TM. However, AVHRR has restriction in deriving SST in the area whose shoreline is complicated like western coast in South Korea because of coarse spatial resolution. The TIR band of TM images can be used to detect SST change whose shoreline is complicated and narrow like the study site. Thus, multi-temporal TM images were used for SST change detection in this study.

  • PDF

Recalculation of Monthly Weather Table for Construction Standard Cost Estimating on Aerial Photogrammetry (항공사진측량 품셈 개정을 위한 월별천후표 재계산)

  • Song, DongSeob
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.37 no.6
    • /
    • pp.571-577
    • /
    • 2019
  • Since the introduction of digital cameras in an aerial-photogrammetry field on 2006, the technological paradigm related to the photogrammetry has been shifting from the analog types to digital types. However, current construction standard cost for the aerial-photogrammetry and the digital mapping are being mixed with analog-based concepts and digital-based methods. In the current standard cost, the monthly weather table is closely related to the calculation of the number of flying days in a taking of aerial photograph. The current monthly weather table uses the results calculated from the observation data of total cloud amount from 1999 to 2007. In this study, the monthly weather table was calculated using the total cloud data during ten years from 2009 to 2018. As a result, the newly calculated number of clear days for 29 stations was analyzed as 44 days decreased by 6 days. The maximum number of clear days decreased in Jinju as 23 days, and the highest decreased clearing days was February.

Changes of Sedimentary Environment in the Saemangeum Tidal Flat on the West Coast of Korea (새만금 갯벌의 퇴적환경 변화)

  • Woo, Han-Jun;Choi, Jae-Ung;An, Soon-Mo;Kwon, Su-Jae;Koo, Bon-Joo
    • Ocean and Polar Research
    • /
    • v.28 no.4
    • /
    • pp.361-368
    • /
    • 2006
  • The Saemangeum tidal flat with an area of approxirnately $233km^2$ is one of the biggest estuarine tidal flats on the west coast of Korea. Because of its location in the estuary of Mangyeong and Dongjin Rivers, the tidal flat receives large amount of sediments. A 33-km long sea dyke, enclosing a coastal zone of $401km^2$, was constructed to reclaim tidal flat in the Saemangeum area. The dyke construction radically changes the local tidal current regime and estuarine circulation. These have an effect on sedimentary environments in the tidal flat. On the tidal flats of the study area net deposition occurred, but net erosion occurred near tidal channel in 2004. The comparison of topography and surface sediments in summer 2004 with those in summer 1988 before the dyke construction showed that elevation increased with maximum 80cm and mean grain sizes were fining at Gwanghwal tidal flats. Sedimentary facies of two cores from Gwanghwal tidal flat revealed homogeneous layers in the upper part suggesting rapid deposition after the dyke construction. The sedimentation rate in Gwanghwal tidal flat(GW 6) using $^{210}Pb$ analysis was about 5.4cm/yr which is well matched with the sedimentation pattern revealed by change in topography.

A Study on the Seeding Mixture and Application Test for the Restoration and Revegetation of the Slopes by theThin-Layer-Soil-Media Hydroseeding Measures - Application by the S.O-Soil spray Measures - (얇은 식생기반재 취부공법에 의한 비탈면 녹화 식생배합 및 적용시험 연구 - S.O-Soil spray공법을 중심으로-)

  • Kim, Jung-Wan;Jung, Tea-Geun;Kim, Nam-Choon;Kwon, Byeong-Soung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.6
    • /
    • pp.143-151
    • /
    • 2006
  • Currently, there are researches about environment-friendly road construction plans led by the Ministry of Construction and Transportation in progress. Therefore, in order to create the revegetation techniques of thin layer-soil combination media hydroseeding measures by actively using native herbs and native woody plants instead of using imported foreign grasses as a concept of sustainable environment-friendly land development, this thesis is going to identify problems that can appear when applying the thin- layer-soil-media hydroseeding measures by the suggested in the "Slope revegetation design and guidelines" proposed by the Ministry of Construction and Transportation, and to propose improvement plans for the problems.To this aim, a seeding mixture selection test was conducted by the goal of slope restoration, and a test group for artificial slope was created. As for a test for June sowing, it was intended to identify appropriate combination quantity by conducting a test that differentiates the combination quantity, and as for a test for September sowing, an artificial slope test was conducted by creating an artificial bank for earth and soil and applying 1~2cm and 3~4cm thickness after differentiating the seed combination volume and slope aspects.

A case study on perforation under Daejeon station building by Front-Jacking method (Front-Jacking공법에 의한 대전역사 하부 관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Cha, Jong-Hwi;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2006.03a
    • /
    • pp.195-203
    • /
    • 2006
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. first, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of ground. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

Analysis of the Restoration Actual Conditions on the Quarries II (토석채취지의 복구 실태 분석 II)

  • Park, Jae Hyeon
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.4
    • /
    • pp.558-566
    • /
    • 2012
  • This study was conducted to offer preliminary data for a natural restoration by the actual condition survey of quarries after extracting rock materials. The mountain restoration area according to a farming and fishing village organize project was restored by green landscape after quarry. However, planting tree species were died due to poor maintenance and administration after restoration works and surface soil loss and erosion occurred during a summer rainfall season because of poor slope greening. It will be needed to review restoration constructions to establish a natural friendly and flawless construction through the selection of optimum restoration works and the examination of soil and geological characteristics. In addition, it is necessary to apply cost-reducing program of restoration constructions. Quarry areas could be restored by the selection of simple and optimum construction works because the most areas were dominant in earth-sand rocks, soft-rocks, and weather-rocks. In addition, the restoration construction project should be examined thoroughly by restoration specialists during green restoration planning and review processes.

A Study on the Lateral Deformation of Retaining Walls during Excavation with Degree of Consolidation (압밀도에 따른 굴착시 흙막이벽 수평변위에 관한 연구)

  • Byun, Yoseph;Choi, Dongchan;Shin, Seungjin;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.43-51
    • /
    • 2009
  • This paper holds three objects. The first is to analyze surveys of concerning zone and promotion department. The data were collected through an examination of construction excavated in coastal soft (marine) clay and measurements obtained during excavating construction. The second is to observe the appropriate selection and the application of support system on earth retaining wall in soft clay. Lateral deformation behavior during the excavating construction according to the differences in a soft ground pressuring degree was investigated. The third is to compare the results with those of numerical analysis. Therefore, the purpose of this study is to analyze the characteristics of lateral deformation when soft ground improvement for the expansion of infrastructure in object of study zone has been incompleted. Also, it is to identify the relationship between the degree of consolidation of soft ground and lateral deformation, in a method of displacement quantity in compliance with the numerical analysis and a quatitative analysis. In conclusion, displacement of excavated section after consolidation was fewer 60% averagely than section under consolidation.

  • PDF

A Study on the Structural Stability of Prefabricated Strut for Ground Excavation Construction (지반굴착용 조립식 버팀보의 구조 안정성에 관한 연구)

  • Lee, Ki-Sun;Kim, Doo-Hwan;Song, Kwan-Kwon;Kim, Seong-Pil;Kim, Jeong-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.75-83
    • /
    • 2018
  • In study, Structural stability was considered when applying the high strength strut method with improved general strut method. considered whether there is sufficient stiffness to so as not buckling to the maximum hypothetical earth pressure. also structure stability of the strut component was reviewed. The high strength strut method is a technique used in place of the general strut method. high strength prefabricated Strut method is a technique that has bolt holes drilled in the upper flange at regular intervals. As a result of the buckling analysis, it was considered that the safety factor increased by about 5 %. also Since the stress generated is below the allowable stress, it is judged that structural stability of the strut is ensured. In particular, the safety factor of axial compressive stress increases about 16 % with use of high strength steel when applying the high strength prefabricated strut method. the high strength strut method is construction method may shorten the construction period and there is no expense to purchase additional materials.