• Title/Summary/Keyword: Early Design

Search Result 3,049, Processing Time 0.034 seconds

A STUDY ON THE CONSTRUCTION OF BIM DATA INTEROPERABILITY FOR ENERGY PERFORMANCE ASSESSMENT BASED ON BIM

  • Jungsik Choi;Hyunjae Yoo;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.267-273
    • /
    • 2013
  • Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

A study on output feedback control (출력궤환제어에 대한 연구)

  • 심영철
    • 전기의세계
    • /
    • v.30 no.2
    • /
    • pp.86-96
    • /
    • 1981
  • The problem of incomplet state feedback began to appear late in60's and early in 70's. This was motivated by inability to measure all the states of the system in practice. This survey paper traces the early developments in the subject through to the most recent achievement of gain-determining, pole-assignment, stabilization, and low sensitivity system design with output feedback.

  • PDF

Design and implementation of the early projection in BADA-II (바다-II에서 조기 프로젝션의 설계와 구현)

  • 김정아;박영철
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10b
    • /
    • pp.208-210
    • /
    • 2003
  • 기존의 바다-II는 늦은 프로젝션(late projection) 기법을 사용하기 때문에 중간 임시 결과 파일의 디스크 쓰기와 디스크 읽기에 많은 디스크 자원, 메모리 자원, 그리고 CPU 시간이 소모되었다. 본 논문은 바다-II에 조기 프로젝션(early projection) 기법의 설계와 구현 그리고 그에 따른 성능 향상을 보인다.

  • PDF

Design Process of Light-weighted Fuel Cell Vehicle Body Frame (경량 연료전지 차체프레임 설계 프로세스)

  • Kim, Ki-Tae;Kang, Sung-Jong
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.18 no.6
    • /
    • pp.114-121
    • /
    • 2010
  • This paper presents a design process of light-weighted fuel cell vehicle (FCV) frame to meet design target of natural frequency in early design stage. At first, using validated FE model for the current design, thickness optimization was carried out. Next. optimization process, comprised of beam model size optimization, shell model design and shell model thickness optimization, was investigated for two frame types. In addition, in order to ensure hydrogen tanks safety against rear impact load, structural collapse characteristics was estimated for the rear frame model finally produced from the previous optimization process and, with the target of equal collapse characteristics to the current design model, structural modification with small weight increase was studied through static structural collapse analyses. The same attempt was applied to the front side frame. The results explain that the proposed process enables to design light-weighted frames with high structural performance in early stage.

BIM-enabled Quantitative Indicators for Analyzing Building Circulation in Early Phase of Design (설계초기 동선 분석을 위한 BIM기반 정량 평가지표 및 평가체계에 관한 연구)

  • Shin, Jaeyoung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.4
    • /
    • pp.147-155
    • /
    • 2016
  • In order to ensure a certain level of the quality of design, standardized evaluation indicators are being used as an objective criterion. Even though the evaluation indicators are quantifiable, limitations such as inefficiency and inconsistency caused by manual task in the evaluation process still have been found. BIM (Building Information Modeling) technology that is commonly adopted in architectural design process provides an environment which enables us to figure out a building model to be interpreted quantitatively with the basis of the building information model. It supports quantitative, consistent, accurate and quick evaluations so as to improve quality of design even in the initial design phase. This paper aims to establish BIM-enabled quantitative indicators and an evaluation framework to analyze building circulation even in early phase of design. The indicators are composed of 4 types (relative distance, accessibility, simplicity, pedestrian friendliness) and 7 sub-types. The evaluation framework is the process to derive Parameterized Path Value (PPV) as weighting on each indicator. For demonstrating the scalability of the suggested evaluation indicators and the framework, the authors implemented an evaluation tool and a case study has been carried out by using an actual building remodel project.

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • v.12 no.2
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.

The Effects of Cancer Prevention and Early Detection Education on Cancer-related Knowledge, Attitudes, and Preventive Health Behavior of Middle-aged Women in Korea (암 예방과 조기발견 교육이 중년기 여성의 암에 대한 지식, 태도 및 예방적 건강행위에 미치는 영향)

  • Park, Sun-Young;Park, Chung-Ja;Park, Jeong-Sook
    • Korean Journal of Adult Nursing
    • /
    • v.13 no.3
    • /
    • pp.441-450
    • /
    • 2001
  • The purpose of this study was to identify the effects of cancer prevention and early detection education on cancer-related knowledge, attitudes, and preventive health behavior of middle-aged women in Korea. The research design was a nonequivalent control group pretest-posttest design. The subjects of this study were 38 middle-aged women from a church in Taegu. An Experimental group of 19 and a control group of 19 women were studied. The study was conducted from September 21, 2000 to October 27, 2000. The cancer prevention and early detection education had been provided to the experimental group for 2 weeks. The contents of the education program for the third most prevalent cancer of Korean women were : 'the risk factors of cancer', 'the early symptoms of cancer', 'the diagnostic test for cancer detection', and 'the cancer prevention methods'. The instruments used for this study were modified, cancer-related knowledge, and attitude, preventive health behavior tools of Suh et al.(1998). Data were analyzed using descriptive statistics, $\chi^2$-test, t-test, ANCOVA with SPSS WIN 9.0/PC. The results were as follows : 1) Hypothesis 1 that the women who get cancer prevention and early detection education will have higher scores of the cancer-related knowledge than the women do not get cancer prevention and early detection education was accepted(F=4.732, p=.037). 2) Hypothesis 2 that the women who get cancer prevention and early detection education will have higher scores of cancer-related attitudes than the women do not get cancer prevention and early detection education was rejected(F=.118, p=.733). 3) Hypothesis 3 that the women who get cancer prevention and early detection education will have higher scores of cancer-related preventive health behavior than the women who do not get cancer prevention and early detection education was rejected(F=2.250, p=.143). On the basis of the above findings, the following recommendations are suggested : 1) It is necessary to identify the variables affected on cancer-related knowledge, attitudes and preventive health behavior. 2) It is necessary to develop a well organized cancer prevention and early detection education program to change cancer-related attitude and preventive health behavior.

  • PDF

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.