• Title/Summary/Keyword: EWMA control chart

Search Result 86, Processing Time 0.021 seconds

Multivariate EWMA control charts for monitoring the variance-covariance matrix

  • Jeong, Jeong-Im;Cho, Gyo-Young
    • Journal of the Korean Data and Information Science Society
    • /
    • v.23 no.4
    • /
    • pp.807-814
    • /
    • 2012
  • We know that the exponentially weighted moving average (EWMA) control charts are sensitive to detecting relatively small shifts. Multivariate EWMA control charts are considered for monitoring of variance-covariance matrix when the distribution of process variables is multivariate normal. The performances of the proposed EWMA control charts are evaluated in term of average run length (ARL). The performance is investigated in three types of shifts in the variance-covariance matrix, that is, the variances, covariances, and variances and covariances are changed respectively. Numerical results show that all multivariate EWMA control charts considered in this paper are effective in detecting several kinds of shifts in the variance-covariance matrix.

An Adaptive Moving Average (A-MA) Control Chart with Variable Sampling Intervals (VSI) (가변 샘플링 간격(VSI)을 갖는 적응형 이동평균 (A-MA) 관리도)

  • Lim, Tae-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.4
    • /
    • pp.457-468
    • /
    • 2007
  • This paper proposes an adaptive moving average (A-MA) control chart with variable sampling intervals (VSI) for detecting shifts in the process mean. The basic idea of the VSI A-MA chart is to adjust sampling intervals as well as to accumulate previous samples selectively in order to increase the sensitivity. The VSI A-MA chart employs a threshold limit to determine whether or not to increase sampling rate as well as to accumulate previous samples. If a standardized control statistic falls outside the threshold limit, the next sample is taken with higher sampling rate and is accumulated to calculate the next control statistic. If the control statistic falls within the threshold limit, the next sample is taken with lower sampling rate and only the sample is used to get the control statistic. The VSI A-MA chart produces an 'out-of-control' signal either when any control statistic falls outside the control limit or when L-consecutive control statistics fall outside the threshold limit. The control length L is introduced to prevent small mean shifts from being undetected for a long period. A Markov chain model is employed to investigate the VSI A-MA sampling process. Formulae related to the steady state average time-to signal (ATS) for an in-control state and out-of-control state are derived in closed forms. A statistical design procedure for the VSI A-MA chart is proposed. Comparative studies show that the proposed VSI A-MA chart is uniformly superior to the adaptive Cumulative sum (CUSUM) chart and to the Exponentially Weighted Moving Average (EWMA) chart, and is comparable to the variable sampling size (VSS) VSI EWMA chart with respect to the ATS performance.

EWMA Control Charts with Variable Parameter (가변모수를 갖는 EWMA 관리도)

  • Lee, Jae-Heon;Han, Jung-Hee
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.4
    • /
    • pp.117-122
    • /
    • 2005
  • Variable sampling rate(VSR) scheme varies the sampling rate for the current sample depending on the previous value of the control statistic. In this paper, we propose EWMA control charts with variable parameter(VP) scheme, which allows both the sample rate(the sample size or the sampling interval) and the weight to vary. We investigate the effectiveness of the VP scheme relative to the fixed parameter(FP) scheme and the VSR scheme in EWMA control charts. It is shown that using the VP scheme gives some improvements to the ability in detecting small and moderate shifts in the process normal mean.

EWMA Control Chart for Monitoring a Process Correlation Coefficient (상관계수의 변동을 탐지하기 위한 EWMA 관리도)

  • 한정혜;조중재
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.1
    • /
    • pp.108-125
    • /
    • 1998
  • The EWMA(Exponentially Weighted Moving Average) has recently received a great deal of attention in the quality control literature as a process monitoring tool on the shop floor of manufacturing industires, since it is easy to plot, to interpret, and its control limits are easy to obtain. Most a, pp.ications of the EWMA for process monitoring have concentrated on the problem of detecting shifts of a process mean and a process standard deviation with ARL(Average Run Length) properties. But there may be the necessity of controlling linearity on product quality such as the correlation coefficient to the process operator. Control managers may want to protect the increase of a process correlation coefficient value, such as 0, between two variables of interest. However, there are few studies concerned on this part. Therefore, we propose EWMA models for a process correlation coefficient using two transformed statistics, T-statistic and (Fisher's) Z-statistic. We also present some results of simulation by SAS/IML and compare two models.

  • PDF

The Study for Comparative Analysis of Software Failure Time Using EWMA Control Chart (지수 가중 이동 평균 관리도를 이용한 소프트웨어 고장 시간 비교분석에 관한 연구)

  • Kim, Hee-Cheul;Shin, Hyun-Cheul
    • Convergence Security Journal
    • /
    • v.8 no.3
    • /
    • pp.33-39
    • /
    • 2008
  • Software failure time presented in the literature exhibit either constant, monotonic increasing or monotonic decreasing. For data analysis of software reliability model, data scale tools of trend analysis are developed. The methods of trend analysis are arithmetic mean test and Laplace trend test. Trend analysis only offer information of outline content. In this paper, we discuss exponentially weighted moving average chart, in measuring failure time. In control, exponentially weighted moving average chart's uses are efficiency case of analysis with knowing information, Using real software failure time, we are proposed to use exponentially weighted moving average chart and comparative analysis of software failure time.

  • PDF

Comparison of the Efficiencies of Variable Sampling Intervals Charts for Simultaneous Monitoring the means of multivariate Quality Variables

  • Chang, Duk-Joon
    • Journal of Integrative Natural Science
    • /
    • v.9 no.3
    • /
    • pp.215-222
    • /
    • 2016
  • When the linear correlation of the quality variables are considerably high, multivariate control charts may be a more effective way than univariate charts which operate quality variables and process parameters individually. Performances and efficiencies of the multivariate control charts under multivariate normal process has been considered. Some numerical results are presented under small scale of the shifts in the process to see the improvement of the efficiency of EWMA chart and CUSUM chart, which use past quality information, comparing to Shewart chart, which do not use quality information. We can know that the decision of the optimum value of the smoothing constant in EWMA structure or the reference value in CUSUM structure are very important whether we adopt combine-accumulate technique or accumulate-combine technique under the given condition of process.

A VSSI-CRL Synthetic Control Chart (VSSI-CRL 합성관리도)

  • Lee Jae-Won;Lim Tae-Jin
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.4
    • /
    • pp.1-14
    • /
    • 2005
  • We propose a VSSI-CRL(Variable Sampling Size and Samplina Interval-Conforming Run length) synthetic control chart in order to improve the statistical characteristics of both the VSSI chart and the CRL synthetic chart. The VSSI-CRL chart utilizes VSSI sampling scheme, but it produces a signal only when the CRI is less than a given limit. An algorithm for calculating the ARL(Average Run length) and ATS(Average Time to Signal) of the VSSI-CRL chart is developed by employing Markov chain method. We present some lemmas for describing the statistical characteristics of the VSSI-CRL chart under in-control state. A procedure for designing the VSSI-CRL chart is proposed based on the lemmas. Extensive comparative studios show that the VSSI-CRL chart is superior to the CRL synthetic chart or the VSSI chart in general, and is comparable to the EWMA chart in ATS performance.

An Effective Control Chart for Monitoring Mean Shift in AR(1) Processes (AR(1) 공정에서의 효과적인 공정평균 관리도)

  • 원경수;강창욱;이배진
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.67
    • /
    • pp.27-36
    • /
    • 2001
  • A standard assumption when using a control chart to monitor a process is that the observations from the process output are statistically independent. However, for many processes the observations are autocorrelated and this autocorrelation can have a significant effect on the performance of the control chart. In this paper, we consider combined control chart of monitoring the mean of a process in which the observations can be modeled as a first-order autoregressive process. The Shewhart control chart of residuals-EWMA control chart of the observations is considered and the method of combination is recommended. The performance of the proposed control chart is compared with the performance of other control charts using a simulation.

  • PDF