• Title/Summary/Keyword: ERP implementation

Search Result 240, Processing Time 0.022 seconds

Design and Implementation of Web-based Information Reporting System for Group Project Management (그룹프로젝트관리 지원을 위한 웹기반 정보보고시스템의 설계 및 구현)

  • Kim, Myong-Ok;Park, Eun-Byul
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.4
    • /
    • pp.245-263
    • /
    • 2010
  • Today, large enterprises are changing their team organization to group organization. These trends have brought work flexibility of project and manpower usage. However, communication among group members has become more complicated, and it has been found that ERP was not efficient enough to solve this communication problem. The main purpose of this study was to design a quick and systematic communication system for group project management, and Web-based Information Reporting System (hence forth WIRS) has been proposed. The main topics covered in this paper are design of functions and system architecture, process model design, database design, and implementation of the prototype. Focus group interview was conducted and user feedback was positive about main functions for WIRS and its overall impact on the enhancement of productivity.

A Case Study on BSC System Implementation of Korea Minting & Security Printing Corporation (한국조폐공사 BSC 시스템 구축 사례)

  • Lee, Choong-Seop
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.191-214
    • /
    • 2007
  • This study analyzes the process of establishing BSC based strategic performance evaluation system of KOMSCO. This case could be a reference to other public institutes for BSC introduction and efficient BSC usage. Internal control system of KOMSCO has been improved by EVA system in 1999, BSC introduction and Job analysis in 2001 through 2002, and BSC performance evaluation system in 2004. KOMSCO tries to reflect BSC concept by inducing employees to cooperate selection process of CSF and KPI and by considering the organizational characteristics of KOMSCO in constructing it's performance indices. It is suggested that these processes are very important and should be followed by other institutes in their BSC introduction. By applying BSC, KOMSCO provides improvement in employees' understanding of strategy, performance management, and performance evaluation. KOMSCO' information system based on ERP and efficiently connected to EIS, KMS, and BSC seems to play an important role of BSC application. BSC system of KOMSCO is now in the early stage of application and needs to be evaluated by the efficiency of usage in terms of overall performance evaluation system, deduction system of evaluation point for excess accomplishment over target, and connection to budget system.

A Study on Continuous Monitoring Reinforcement for Sales Audit Using Process Mining Under Big Data Environment (빅데이터 환경에서 프로세스 마이닝을 이용한 영업감사 상시 모니터링 강화에 대한 연구)

  • Yoo, Young-Seok;Park, Han-Gyu;Back, Seung-Hoon;Hong, Sung-Chan
    • Journal of Internet Computing and Services
    • /
    • v.17 no.6
    • /
    • pp.123-131
    • /
    • 2016
  • Process mining in big data environment utilize a number of data were generated from the business process. It generates lots of knowledge and insights regarding implementation and improvement of the process through the event log of the company's enterprise resource planning (ERP) system. In recent years, various research activities engaged with the audit work of company organizations are trying actively by using the maximum strength of the mining process. However, domestic studies on applicable sales auditing system for the process mining are insufficient under big data environment. Therefore, we propose process-mining methods that can be optimally applied to online and traditional auditing system. In advance, we propose continuous monitoring information system that can early detect and prevent the risk under the big data environment by monitoring risk factors in the organizations of enterprise. The scope of the research of this paper is to design a pre-verification system for risk factor via practical examples in sales auditing. Furthermore, realizations of preventive audit, continuous monitoring for high risk, reduction of fraud, and timely action for violation of rules are enhanced by proposed sales auditing system. According to the simulation results, avoidance of financial risks, reduction of audit period, and improvement of audit quality are represented.

Process Management Systems for Integrated Real-Time Shop Operations in Heterogeneous Multi-Cell Based Flexible Manufacturing Environment (이기종 멀티 셀 유연생산환경에서의 실시간 통합운용을 위한 공정관리 체계)

  • Yoon, Joo-Sung;Nam, Sung-Ho;Baek, Jae-Yong;Kwon, Ki-Eok;Lee, Dong-Ho;Lee, Seok-Woo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.2
    • /
    • pp.281-286
    • /
    • 2013
  • As the product lifecycle is getting shorter and various models should be released to respond to the needs of customers and markets, automation-based flexible production line has been recognized as the core competitiveness. According to these trends, system vendors supply cell-level systems such as FMC(Flexible Manufacturing Cell) that is integration of core functions of FMS(Flexible Manufacturing System) and RMC(Reconfigurable Manufacturing Cell) that can easily extend components of FMC. In the cell-based environment, flexible management for shop floor composed of existing job shop, FMCs and RMCs from various system vendors has emerged as an important issue. However, there could be some problems on integrated operation between heterogeneous cells to use vendor-specific cell controllers and on seamless information flow with high level systems such as ERP(Enterprise Resource Planning). In this context, this paper proposes process management systems supporting integrated shop operation of heterogeneous multi-cell based flexible manufacturing environment: First of all, (1) Integrated Shop Operation System to apply the process management system is introduced, and (2) Multi-Layer BOP(Bill-Of-Process) model, a backbone of the process management system, is derived with its data structure. Finally, application of the proposed model is illustrated through system implementation results.

A Study On BI Module Implementation Based Hybrid App For Smart Mobile Office (중소기업 SMO를 위한 하이브리드 앱 기반의 BI 모듈 구축 및 활용방안)

  • Kim, Yeong-Real;Park, Geon-Wan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.5
    • /
    • pp.103-115
    • /
    • 2014
  • Mobile-Office is the IT office that enables people handle their business anywhere and anytime without going to head office. It has propagated rapidly in domestic and foreign companies as the users who use mobile terminal such as smartphone have increased sharply. Mobile-Office is emerging as a new way of conducting business. It requires business environment to be changed to improve business efficiency, as fast-growing mobile-based economies emerges. Small and medium-sized companies's utilization ability for advanced IT technology is insufficient, and limitations exist on capacity of building and investment. They need different development methodologies and utilization methods. The purpose of this study is not only to consider the previous business environment problem on accessibility, mobility, effectiveness, complexity and consolidation, but to search more efficient methods for introducing applications to utilize various smart devices and websites with minimum investment in R&D.

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

Implementation of an Autonomous Driving System for the Segye AI Robot Car Race Competition (세계 AI 로봇 카레이스 대회를 위한 자율 주행 시스템 구현)

  • Choi, Jung Hyun;Lim, Ye Eun;Park, Jong Hoon;Jeong, Hyeon Soo;Byun, Seung Jae;Sagong, Ui Hun;Park, Jeong Hyun;Kim, Chang Hyun;Lee, Jae Chan;Kim, Do Hyeong;Hwang, Myun Joong
    • The Journal of Korea Robotics Society
    • /
    • v.17 no.2
    • /
    • pp.198-208
    • /
    • 2022
  • In this paper, an autonomous driving system is implemented for the Segye AI Robot Race Competition that multiple vehicles drive simultaneously. By utilizing the ERP42-racing platform, RTK-GPS, and LiDAR sensors provided in the competition, we propose an autonomous driving system that can drive safely and quickly in a road environment with multiple vehicles. This system consists of a recognition, judgement, and control parts. In the recognition stage, vehicle localization and obstacle detection through waypoint-based LiDAR ROI were performed. In the judgement stage, target velocity setting and obstacle avoidance judgement are determined in consideration of the straight/curved section and the distance between the vehicle and the neighboring vehicle. In the control stage, adaptive cruise longitudinal velocity control based on safe distance and lateral velocity control based on pure-pursuit are performed. To overcome the limited experimental environment, simulation and partial actual experiments were conducted together to develop and verify the proposed algorithms. After that, we participated in the Segye AI Robot Race Competition and performed autonomous driving racing with verified algorithms.

P300 speller using a new stimulus presentation paradigm (새로운 자극제시방법을 사용한 P300 문자입력기)

  • Eom, Jin-Sup;Yang, Hye-Ryeon;Park, Mi-Sook;Sohn, Jin-Hun
    • Science of Emotion and Sensibility
    • /
    • v.16 no.1
    • /
    • pp.107-116
    • /
    • 2013
  • In the implementation of a P300 speller, rows and columns paradigm (RCP) is most commonly used. However, the RCP remains subject to adjacency-distraction error and double-flash problems. This study suggests a novel P300 speller stimuli presentation-the sub-block paradigm (SBP) that is likely to solve the problems effectively. Fifteen subjects participated in this experiment where both SBP and RCP were used to implement the P300 speller. Electroencephalography (EEG) activity was recorded from Fz, Cz, Pz, Oz, P3, P4, PO7, and PO8. Each paradigm consisted of a training phase to train a classifier and a testing phase to evaluate the speller. Eighteen characters were used for the target stimuli in the training phase. Additionally, 5 subjects were required to spell 50 characters and the rest of the subjects were to spell 25 characters in the testing phase. Classification accuracy results show that average accuracy was significantly higher in SBP as of 83.73% than that of RCP as of 66.40%. Grand mean event-related potentials (ERPs) at Pz show that positive peak amplitude for the target stimuli was greater in SBP compared to that of RCP. It was found that subjects tended to attend more to the characters in SBP. According to the participants' ratings on how comfortable they were with using each type of paradigm on 7-point Likert scale, most subjects responded 'very difficult' in RCP while responding 'medium' and 'easy' in SBP. The result showed that SBP was felt more comfortable than RCP by the subjects. In sum, the SBP was more correct in P300 speller performance as well as more convenient for users than the RCP. The actual limitations in the study were discussed in the last part of this paper.

  • PDF

An Empirical Study on the Impact of the Perception of the Monitoring Function on Effective BPMS Adoption (모니터링 기능에 대한 인식이 효과적인 BPMS 도입에 미치는 영향)

  • Chae, Myung-Sin;Park, Jin-Suk;Lee, Byung-Tae
    • Asia pacific journal of information systems
    • /
    • v.17 no.3
    • /
    • pp.105-130
    • /
    • 2007
  • Recently, there is a substantial interest in implementing Business Process Management System(BPMS) among enterprises with the purpose of business process innovation. BPMS redesigns and coordinates business processes in terms of both automated steps and human involvement in order to maximize the value of both involved people and systems. The reason why BPMS is getting attention from top managers is that it has the possibility to optimize the business processes by cycling the process of modeling, execution, monitoring, evaluation, and redesigning work processes. Thus, it has created high expectations about not only productivity improvement but also business process innovation. However. having an innovative nature, which is used for process innovation, BPMS implementation has great potential to stir up employee resistance. The analysis and the discussion about the prevention of the resistance against IS(Information Systems) is important because IS change the way people work and also alter the power structure within the organization, in general. The purpose of this study is to investigate factors that have an impact on the effective adoption of BPMS at the enterprise level. To find out these factors, this study considers two characteristics of BPMS: First. BPMS shares some characteristics with other enterprise-wide IS such as ERP. Second, it has special BPMS-specific characteristics. Due to the lack of previous research on BPMS adoption, interviews were carried out with IT-consultants and CIOs who conducted BPMS projects previously to find out BPMS-specific features that would make BPMS unique when compared to other enterprise-wide IS. As a result, the monitoring function was chosen as the main BPMS-specific factor. Thus, this paper reviewed studies both on enterprise-wide IS adoptions, which applied Technology Acceptance Model (TAM) and secondly on computer based monitoring to find out factors that would influence the employees' perception on the monitoring function of BPMS. Based on the literature review, the study suggested three factors that would have an impact on the employee's perception of the monitoring function: fairness of enterprise evaluation system, fairness of the boss, and self-efficacy of their work. Three factors that would impact the enterprise-wide IS adoption were also set: the shared belief in the benefit of BPMS, training, and communication. Then, these factors were integrated with TAM. Structural equation modeling was used to test hypotheses, out factors that would impact the employees' perception on the monitoring function of BPMS. Based on the literature review the study suggested three factors that would have an impact on the employee's perception of the monitoring function: fairness of enterprise evaluation system, fairness of the boss, and self-efficacy of their work. Three factors that would impact the enterprise-wide IS adoption were also set: the shared belief in the benefit of BPMS, training, and communication. Then, these factors were integrated with TAM. Structural equation modeling was used to test hypotheses. The data analysis results showed that two among three monitoring function related factors - enterprise evaluation system and fairness of the boss - were significant. This implies that employees would worry less about the BPMS implementation as long as they perceive the monitoring results will be used fairly for their performance evaluation. However, employees' high self-efficacy on their job was not a significant factor in their perception of the usefulness of BPMS. This is related to cases that showed employees resisted against the information systems because they automated their works (Markus, 1983). One specific case was an electronic company, where the accounting department workers were requested to redefine their job because their working processes were automated due to BPMS implementation.

A Colored Workflow Model for Business Process Analysis (비즈니스 프로세스 분석을 위한 색채형 워크플로우 모델)

  • Jeong, Woo-Jin;Kim, Kwang-Hoon
    • Journal of Internet Computing and Services
    • /
    • v.10 no.3
    • /
    • pp.113-129
    • /
    • 2009
  • Abstract Corporate activities are composed of numerous working processes and during the working flow, various business processes are being created and completed simultaneously. Enterprise Resources Planning (ERP) makes the working process simple, yet creates more complicated work structure and therefore, there is an absolute need of efficient management for business processes. The workflow literature has been looking for efficient and effective ways of rediscovering and mining workflow intelligence and knowledge from their enactment histories and event logs. As part of studies to analyze and improve the process, the concepts of 'Process Mining', 'Process re-discovery', 'BPR (Business Process Reengineering)' have appeared and the studies for practical implementation are proactively being done. However, these studies normally follow the approach throughout data warehousing for log data of process instances. It is very hard for these approaches to reflect user's intention to the rediscovering and mining activities. The process instances designed based on the consideration of analysis can make groupings effectively and when the analysis demand of user changes within the analysis domain can also reduce the cost of analysis. Therefore, the thesis proposes a special type of workflow model, which is called a colored workflow model, that is extended from the ICN (information control net) modeling methodology by reinforcing the concept of colored token. The colored tokens represent the conceptual types of constraints and criteria that can be used to classifying and grouping the workflow intelligence and knowledge extracted from the corresponding workflow models' enactment histories and event logs. Through the runtime information of process instances, it makes possible to analyze proactive and user-oriented process with the goal of deriving business knowledge from the beginning of process definition.

  • PDF