Journal of Korean Society for Atmospheric Environment
/
v.29
no.5
/
pp.581-600
/
2013
The current status of atmospheric environmental impact assessment (EIA) has been summerized and future prospective for effective and accurate atmospheric EIA has been proposed by reviewing available papers and reports for the atmospheric EIA. The number of reports for the EIA in the EIA support system which is operated by the Korean Environmental Institute have been dramatically decreased from 282 reports in 2008 to 113 reports in 2012 during recent five years. This is partially due to simplification of the EIA procedure, the contraction of the public development and economic recession. We analyzed details of the EIA report to review how actual atmospheric EIA has preformed according to the EIA guidelines from the Korean Ministry of Environment. The 264 reports of EIA published in 2011 and 2012 had been reviewed especially focusing on the atmospheric evaluation items such as meteorology, air quality measurement and modeling, odor measurement and modeling, wind corridor in urban planning, and climate change. In overall sense, the atmospheric EIA has been performed quite well by abiding the guidelines except for local meteorological data measurement, permit standard for air quality and wind corridor. The new approaches to improve the procedure of atmospheric EIA and to reflect future of national air quality standard of $PM_{2.5}$ have been proposed. The guidelines on how to evaluate the wind corridor, to implement atmospheric EIA for $PM_{2.5}$ permit, and how to acquire local meteorological data by combining local measurement and model prediction are required for the effective and future oriented atmospheric EIA.
Follow-up process consists of two steps. First, it monitors whether project proponents comply with reviews made by KEI. The second steps is to survey environmental impacts during and after implementation of the proposed action. The follow-up requires the proper participation of stakeholders: project proponents, compliance monitors, impact monitors, and environmental agencies approving and reviewing said projects. Currently, follow-up process does not work well because each stakeholder does not play his proper role for various reasons such as mutual distrust among stakeholders and problems associated with institutional settings. This study intends to improve effectiveness of follow-up process and, ultimately, to improve quality of EIA in Korea by devising a follow-up system that delineates clear roles and build a strong network among stakeholders. In order to do so, the study identifies current problems associated with follow-up process and examines basic concepts and procedures involved in it. Secondly, it analyzes relational dynamics among stakeholders to identify what's behind the current mutual distrust. Third, it proposes a way to delineate clear roles to each stakeholder so that follow-up process runs efficient as an organic network.
Journal of Korean Society of Industrial and Systems Engineering
/
v.27
no.3
/
pp.31-36
/
2004
This paper will describe design process and its results that are minimized unaddressed feature of product development processes. This process provides integrated system design process by context analysis of EIA 632 standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrency & sequential activities flow. This process and method application will contribute to minimize time loss that is emerged from activities iteration by not definitely definition of activities interface.
KSCE Journal of Civil and Environmental Engineering Research
/
v.12
no.3
/
pp.195-205
/
1992
EIA(Environmental Impact Assessment) was introduced in 1979 by our gorvernment to cope with serious environmental problems. Recently environmental pollution has been controlled severely than ever because pollution phenomena became more comlpicated and arrcordingly the damage more terrible. For the EIA system to achieve its goal effectively, systematic and scientific approach should be found out. For this reason the techniqes such as GIS(Geographic Information System) and RS(Remote Sensing) come to front strongly. The purpose of this paper is to investigate the application techniqes of GIS and RS to the EIA system. Haw-Won Myen, Hae-Nam Gun, Chun-Nam and its related area, which will be developed to be a sightseeing area, were selected as the study area. Applications of GIS resulted some important outcome such as earthwork calculations, landuse models, aspect maps, stability of slanting surfaces, elevation models, estimation of real estates, etc. GIS applied EIA proved to be very useful for the project managers and planners to plan, evaluate, judge the enviormental problems.
The process of assessing environmental values and impacts is subjective and depends on predictions, limiting the securing of scientific rationality. Therefore, it is necessary to make a supplement by securing procedural rationality. This study has been tried to secure procedural rationality of EIA based on information disclosure system. The Aarhus Convention is an international treaty that defines the right of the public to access to environmental information and to participate in decision-making. This study evaluates Korean EIA information disclosure system by deriving 10 indicators based on the provisions on information disclosure presented in the Aarhus Convention. As a result, the five indicators were satisfied in terms of direction of information disclosure and provision. And the four indicators for the basis of utilization and process are required to be supplemented by detailed regulations. Finally, we derive the need for research on the asymmetry of expertise and acceptability of EIA system through public understanding indicators.
Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.
This paper attempts to analyze the institutionalization process of Environmental Impact Assessment(EIA) system within the context of Korean environmental policy. The implementation of EIA in the 1980's was not seriously considered by other government agencies and was sometimes degraded as mere formality due to the inherent problems of the system. With viewing the theory and practice of EIA in Korea, this paper argues that it is essential to reinforce ex post facto management incorporate the participation of residents of concerned areas, upgrade the validity of assessment by selecting a credible assessment-agenices and develop the required technologies. Finally, this paper acknowledge the necessity of devising the mechanism to reconcile the conflict between the regional interest and the national interest.
The mission of tilting train development project is enhancing the speed of transportation of railway passenger using existing infrastructure. The threat of this project is the tilting technology is newly incorporated to this project. To overcome the threat this project incorporate systems engineering technology to development tilting train system. The systems engineering process, which was used in this project, was performed in accordance with systems engineering standard EIA632. This paper shows the systems engineering technology which was used to develop the tilting train system specification. This paper also shows the requirement template which was developed to communicate and synthesis various specialty engineering.
파라과이와 한국의 환경영향평가에 관련된 제도와 법률은 환경영향평가 대상사업, 실행방법 및 사후감시 등에서 상이하다. 양국의 환경영향평가 제도 중에는 전혀 관련 없는 것도 있는데, 경제적, 사회적, 문화적, 역사적 그리고 지연조건이 상이하여 양국의 환경영향평가 제도에 영향을 주는 것으로 분석된다. 파라과이에서는 스코핑이 Term of References (TOR)가 준비되는 단계이다. TOR은 환경부에 의해 준비된 특정의 환경영향평가의 요구조건을 포함한다. 파라과이에서는 스코핑 단계에서 환경부의 주도로 주민참여가 진행된다. Environmental Impact Relatorio (RIMA)가 개발사업으로 인해 영향을 받는 지역사회에 시행되고, 간결하고 이해하기 쉬운 표현으로 작성된다. 파라과이에서는 EIS가 승인되기 전에 RIMA를 지역사회에 공개한다.
Promulgation of the Environment Preservation Act of 1977 has tried to conserve the environment encroached by the development projects. Since 1983, this act has included tourism development in EIA project and public participation as a part of EIA process since 1991. Still, there are many problems in applying the gathered opinions of local residents in such development plans. Therefore, it is necessary to develop a new system in whole project process as well as EIA to reflect these opinions. This study aims to investigate the problems in the process of the public participation and to suggest more effective solutions from the developer's point of view. Studies include theories of public participation developed in the planning process and the opinion survey of developers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.