• Title/Summary/Keyword: E-simulator

Search Result 381, Processing Time 0.029 seconds

The Development of e-learning Contents for The Six Sigma Green Belt (6시그마 GB 교육을 위한 실습형 e-learning 과정 개발)

  • Kim, Chong-Man;Hong, Sun-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.1
    • /
    • pp.113-123
    • /
    • 2007
  • This paper considers the development of e-learning training program for the six sigma green belt. Comparative studies of existing e-learning programs are performed and a new one is proposed. A catapult simulator is developed and the automatic grading function which immediately computes the result of the catapult simulation and gives feedback to the trainees is presented. An illustrative example is also given.

The Development of Simulator for Integrated Onboard Signalling System(IOSS) (통합 차상신호장치 테스트용 시뮬레이터 개발)

  • Kim, Seok-Heon;Han, Jae-Mun;Park, Tan-Se;Cho, Yong-Gee
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.363-367
    • /
    • 2011
  • In this paper a simulator for Integrated Onboard Signalling System(IOSS) will be presented and illustrated. IOSS which is integrated with there signalling systems such as ERTMS/ETCS Level 1 ATP(Automatic Train Protection), ATC(Automatic Train Control) and ATS(Automatic Train Stop) is a signalling system for HEMU-400X(Highspeed Electric Multiple Unit - 400km/h eXperiment). HEMU-400X is under development as the next generation high-speed train in Korea. Before conducting a trial run of HEMU-400X with IOSS, we must carry out functional test of IOSS. The simulator is suggested in this paper for testing and verification of IOSS. The simulator can help to test all function of IOSS although a real train and trackside equipments are not existed. Also the simulator can make a fault in trackside equipment intentionally. In that scenario, we can figure out how IOSS handle emergency situations.

  • PDF

DEVELOPMENT STATUS OF THE DOTIFS DATA SIMULATOR AND THE REDUCTION PACKAGE

  • CHUNG, HAEUN;RAMAPRAKASH, A.N.;PARK, CHANGBOM
    • Publications of The Korean Astronomical Society
    • /
    • v.30 no.2
    • /
    • pp.675-677
    • /
    • 2015
  • A data simulator and reduction package for the Devasthal Optical Telescope Integral Field Spectrograph (DOTIFS) has been developed. Since data reduction for the Integral Field Spectrograph (IFS) requires complicated procedures due to the complex nature of the integral spectrograph, common reduction procedures are usually not directly applicable for such an instrument. Therefore, the development of an optimized package for the DOTIFS is required. The data simulator observes artificial object and simulates CCD images for the instrument considering various effects; e.g. atmosphere, sky background, transmission, spectrograph optics aberration, and detector noise. The data reduction package has been developed based on the outcomes from the DOTIFS data simulator. The reduction package includes the entire processes for the reduction; pre-processing, flat-fielding, and sky subtraction. It generates 3D data cubes as a final product, which users can use for science directly.

Simulator Development for Power Line Communication Channel (전력선 통신채널의 시뮬레이터 개발)

  • Park, Jong-Yeon;Jeong, Dong-Yeol
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.49 no.9
    • /
    • pp.546-553
    • /
    • 2000
  • W e have developed a power line simulator which is one of the basic tools for the research of the power line communication and its control system. In the developed simulators, we have considered the transfer function of the power line, noises and signal attenuation characteristics. Simulator was made using the matlab tool program. We made the power line modem using the FSK chip(ST7537) and experimentalized to show the efficiency grade of simulator. We have expected that the developed simulators are very useful in the area for the power line communication research and the control system design.

  • PDF

Development of the Power Restoration Training Simulator for Jeju Network

  • Lee, Heung-Jae;Park, Seong-Min;Lee, Kyeong-Seob;Song, In-Jun;Lee, Nam-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.9
    • /
    • pp.18-23
    • /
    • 2006
  • This paper presents an operator training simulator for power system restoration against massive blackout. The system is designed especially focused on the generality and convenient setting up for initial condition of simulation. The former is accomplished by using power flow calculation methodology, and PSS/E data is used to set up the initial state for easy setting. The proposed simulator consists of three major components-a power flow(PF), a data conversion(CONV), and, a GUI module. The PF module calculates power flow, and then checks over-voltages of buses and overloads of lines. The CONV module composes a Y-Bus array and a database at each restoration action. The initial Y-Bus array is composed from PSS/E data. A user friendly GUI module is developed including a graphic editor and a built-in operation manual. The maximum processing time for one step operation is 15 seconds, which is adequate for training purpose.

Eddy Current Brake Design for High Speed Railway Train Simulator (고속전철 추진 Simulator용 와전류 제동장치 설계)

  • Kang, D.H.;Kwak, S.T.;Hong, J.P.;Kang, K.H.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.390-392
    • /
    • 1998
  • Recently, the interest of the high speed railway train is increased. Because it is energy-conserving and largely independent of fuel oil, an electric train is environmental friendly. In this paper we designed the eddy current brake for simulator of the Korean High Speed Railway Train(hereafter KHRT). Braking force and normal force according to current and speed are calculated.

  • PDF

The effect of elastic band based of PNF pattern on the U/E function in the spinal cord injury patient (PNF 패턴에 기초한 탄력밴드 훈련이 척수손상 환자의 상지 기능에 미치는 영향)

  • Shin Young-Il;Lee Hyoung-Soo
    • The Journal of Korean Physical Therapy
    • /
    • v.16 no.3
    • /
    • pp.152-160
    • /
    • 2004
  • The purpose of this study was to investigate the effect of elastic band based of PNF pattern on the U/E function in the spinal cord injury patient. 11 subjects with spinal cord injury participated in this study. They took elastic band excercise 5 times per week for 8 weeks. One time excercise spent 35minutes. The therapeutic effect was evaluated by Cybex 6000, BTE Work Simulator, how many seconds they needed to walk 100 meters. 11 cases were examined before, after 8 week, elastic band excercise. The results of this study are as follows; 1. Isokinetic power by Cybex 6000 : The elbow flexion, shoulder flexion and extension were significant difference between test-retest(p<.05). but elbow extension were not significant difference between test-retest. 2. BTE Work Simulator : Wheelchair Propulsion and Steering Torque were significant difference between test-retest(p<.05). 3. Wheelchair Propulsion velocity : There were significant difference between test-retest(p<.05). The findings suggest that SCI patients can improve their Isokinetic power on shoulder and elbow joint, wheelchair propulsion and Steering Torque by BTE Work Simulator, Wheelchair Propulsion velocity through elastic band based of PNF pattern.

  • PDF

A study on the power system restoration simulator (전력계통 고장복군 교육 시스템에 관한 연구)

  • Lee, H.J.;Kim, J.M.;Lee, K.S.;Park, S.M.;Song, I.J.;Lee, N.H.;Bae, J.C.;Hwang, B.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.181-183
    • /
    • 2003
  • This paper presents an operator training simulator for power system restoration against massive black-out. The system is designed especially focused on the generality and convenient setting up for initial condition of simulation. The former is accomplished by using on line calculation methodology, and PSS/E data is used to define the initial situation. The proposed simulator consists of three major components - the Power flow(PF) module, data conversion(CONV) module and CUI subsystem. PF module calculates power flow, and then checks overvoltage of buses and overflow of lines. CONV module composes an Y-Bus array and a data base at each restoration action. The initial Y-Bus array is constructed from PSS/E data. The user friendly GUI module is developed including graphic editor and built-in operation manual. As a result, the maximum processing time for one step operation is 15 seconds, which is adequate for training purpose. Comparison with PSS/E simulation proves the accuracy and reliability of the training system.

  • PDF

Numerical Analysis of Moving Type and Static Type Electrodynamic Suspension Simulator with Superconducting Levitation Magnet (초전도 부상자석을 이용한 동적 및 정지형 반발식 자기부상 시험기의 수치해석)

  • Lee, E.R.;Bae, D.K.;Chung, Y.D.;Yoon, Y.S.;Ko, T.K.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.11 no.1
    • /
    • pp.49-54
    • /
    • 2009
  • This paper presents the numerical simulation results on the moving type electrodynamic suspension (EDS) simulator and static type EDS simulator using high-Tc superconducting (HTS) levitation magnet. The levitation force of the EDS system is formed by the reaction between the moving magnet and the fixed ground conductor. The possible two ways to simulate the EDS system were simulated in this paper by using finite element method (FEM). The first way was the moving type simulator which consists of the fixed HTS magnet and the moving ground conductor. The second way was the static type simulator which consists of the fixed magnet, the fixed ground conductor and the ac current supply system. To verify the characteristics of high speed EDS system with the moving type simulator heavy, large and fast moving ground conductor is needed. The static type simulator can get the characteristics of the high speed EDS system by applying equivalent ac current to velocity, therefore it does not need large moving part. The static type EDS simulator, which can consist of an HTS magnet, the fixed ground conductor(s), an AC power supply and the measuring devices, also test the effect of the shape of the ground conductor easily. The plate type ground conductor made stronger levitation force than ring type ground conductor. Although the outer diameter 335 mm ring type ground conductor (Ring3) was larger than the outer diameter 235 mm ground conductor (Ring2), the levitation force by Ring2 was stronger than that by Ring3. From the calculation results on this paper, the consideration of the magnetic flux distribution according to the levitation height should be included in the process of the ground conductor design.

Development of a Pneumatically Driven 6 DOF Driving Simulator (공기압 구동식 6 DOF 드라이빙 시뮬레이터의 개발)

  • Kim, Geun-Mook;Kang, E-Sok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6090-6097
    • /
    • 2013
  • A pneumatically-driven driving simulator that provides a realistic representation of the driving environment was developed. The motion platform for the driving simulator is a mechatronic device that gives a driver the realistic feeling of an actual vehicle. The cost of the motion platform comprises the largest part of the expenses in developing a driving simulator. In this project, to develop a low-cost motion platform, the self-built motion platform based on the Stewart platform configuration that is constructed by six pneumatic cylinders was used as its actuator. The Stewart platform that moves in response to the operating signals of the joystick showed satisfactory tracking performance. We confirmed the possibility of the driving simulator using rFactor that is a commercially available racing game software.