• Title/Summary/Keyword: Duration Curve

Search Result 443, Processing Time 0.024 seconds

Probabilistic Reliability Based Grid Expansion Planning of Power System Including Wind Turbine Generators

  • Cho, Kyeong-Hee;Park, Jeong-Je;Choi, Jae-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.5
    • /
    • pp.698-704
    • /
    • 2012
  • This paper proposes a new methodology for evaluating the probabilistic reliability based grid expansion planning of composite power system including the Wind Turbine Generators. The proposed model includes capacity limitations and uncertainties of the generators and transmission lines. It proposes to handle the uncertainties of system elements (generators, lines, transformers and wind resources of WTG, etc.) by a Composite power system Equivalent Load Duration Curve (CMELDC)-based model considering wind turbine generators (WTG). The model is derived from a nodal equivalent load duration curve based on an effective nodal load model including WTGs. Several scenarios are used to choose the optimal solution among various scenarios featuring new candidate lines. The characteristics and effectiveness of this simulation model are illustrated by case study using Jeju power system in South Korea.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • v.3
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF

An Efficient Revenue/Profit Evaluation Method Based on Probabilistic Production Costing Technique (확률적 운전비계산 모형에 기초한 발전기 수입/순익 평가 방법론 개발)

  • 박종배;신중린;김민수;전영환
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.638-646
    • /
    • 2002
  • This paper presents an efficient algorithm for evaluating the Profit and revenue of generating units in a competitive electricity market based on the probabilistic production costing technique. The accurate evaluation of the profit and revenue of generating units for long-term perspectives is one of the most important issues in a competitive electricity market environment. For efficient calculation of the profit and revenue of generating units under the equivalent load duration curve(ELDC), a new approach to figure out the marginal plants and the corresponding market clearing prices during a time period in a probabilistic manner is developed. The mathematical formulation and illustrative application of the suggested method is presented.

Watershed Modeling Application for Receiving Water Quality Management in Nakdong River Basin (낙동강 유역의 수질관리를 위한 유역모델링 적용 연구)

  • Jang, Jae-Ho;Ahn, Jong-Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.3
    • /
    • pp.409-417
    • /
    • 2012
  • SWAT model was applied for the Nakdong River Basin to characterize water quality variability and assess the feasibility of using the load duration curve to water quality management. The basin was divided into 67 sub-basins considering various watershed environment, and rainfall runoff and pollutant loading were simulated based on 6 year measurements of meteo-hydrological data, discharge data of treatment plants, and water quality data (SS, T-N and T-P). The results demonstrate that non-point source loads during wet season increase by 80 ~ 95% of total loads. Although the rate of water flow governs the amount of SS that is transported to the main streams, nutrient concentrations are highly elevated during dry season by being concentrated. This phenomenon is more pronounced in the lower basin, receiving large amounts of urban point source discharges such as treated sewages. Also, the load duration curves (LDC) demonstrate dominant source problems based on the load exceedances, showing that SS concentrations are associated with the rainy season and nutrients, such as T-P, may be more concentrated at low flow and more diluted at higher flow. Overall, the LDC method could be used conveniently to assess watershed characteristics and pollutant loads in watershed scale.

Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads (오염부하지속곡선(LDC)을 이용한 수질오염총량관리 단위유역 목표수질 달성여부 평가방법)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.5
    • /
    • pp.693-703
    • /
    • 2012
  • Load Duration Curve(LDC) is a useful tool for analyzing water quality characteristics under various stream flow conditions. This study investigated the methods to identify impaired waterbodies in the assessment of water quality goal attainment by using LDC for the management of Total Maximum Daily Loads (TMDLs). Three methods were proposed. Non-typical regime exclusion method is a method to exclude water quality observations in the non-typical extreme flow conditions in order to minimize the influence of non-ordinary water quality. Flow regime weighted average method is a method to calculate weighted mean water quality instead of arithmetic mean in order to consider water characteristics properly on stream flow regime in addition to the effect of Non-typical regime exclusion method. Load exceeded interval comparison method is a method to compare the intervals between the attained and non-attained load duration periods on the LDC. The assessment of water quality goal attainment can be performed more reasonably and precisely considering water quality variations on stream flow conditions by applying these proposed methods.

The Response of the Structure with the Damage Curve (손상곡선에 의한 구조물의 거동파악)

  • Lee, Sang-Ho;Song, Hyun-Seop
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.1
    • /
    • pp.189-196
    • /
    • 2005
  • The effects of the impulse and the magnitude of the impulsive loads to the responses of the structure are analyzed with the safety criteria established with the peak load and impulse ratio. It is shown for the loadings with short duration that the impulse is dominant factor for the damage of the structures due to the inertial effect. On the other hand the magnitude of the load is dominant factor for the load with long duration due to the duration time long enough for the loads to overcome the inertia force. It is also shown that the peak particle velocity and the peak particle acceleration of the foundation have the same influences as the impulse and the magnitude of the loads do to the structures.

Rainfall Threshold (ID curve) for Landslide Initiation and Prediction Considering Antecedent Rainfall (선행강우를 고려한 산사태 유발 강우기준(ID curve) 분석)

  • Hong, Moon-Hyun;Kim, Jung-Hwan;Jung, Gyung-Ja;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.4
    • /
    • pp.15-27
    • /
    • 2016
  • This study was conducted to suggest a landslide triggering rainfall threshold (ID curve) for landslide prediction by considering the effect of antecedent rainfall. 202 rainfall data including domestic landslide and rainfall records were used in this study. In order to consider the effect of antecedent rainfall, rainfall data were analyzed by changing Inter Event Time Definition (IETD) and IETD based ID curve were presented by regression analysis. Compared to the findings of the previous studies, the presented ID curve has a tendency to predict the landslides occurring at a relatively low rainfall intensity. It is shown that the proposed ID curve is appropriate and realistic for predicting landslides through the validation of proposed ID curve using records of landslides in 2014. Based on this analysis, it is found that the longer IETD, the greater the effect of antecedent rainfall, and the steeper the gradient of ID curve. It is also found that the rainfall threshold (intensity) is higher for the short period rainfall and lower for the long period rainfall.

Successful Robotic Gastrectomy Does Not Require Extensive Laparoscopic Experience

  • An, Ji Yeong;Kim, Su Mi;Ahn, Soohyun;Choi, Min-Gew;Lee, Jun-Ho;Sohn, Tae Sung;Bae, Jae-Moon;Kim, Sung
    • Journal of Gastric Cancer
    • /
    • v.18 no.1
    • /
    • pp.90-98
    • /
    • 2018
  • Purpose: We evaluated the learning curve and short-term surgical outcomes of robot-assisted distal gastrectomy (RADG) performed by a single surgeon experienced in open, but not laparoscopic, gastrectomy. We aimed to verify the feasibility of performing RADG without extensive laparoscopic experience. Materials and Methods: Between July 2012 and December 2016, 60 RADG procedures were performed by a single surgeon using the da $Vinci^{(R)}$ Surgical System (Intuitive Surgical). Patient characteristics, the length of the learning curve, surgical parameters, and short-term postoperative outcomes were analyzed and compared before and after the learning curve had been overcome. Results: The duration of surgery rapidly decreased from the first to the fourth case; after 25 procedures, the duration of surgery was stabilized, suggesting that the learning curve had been overcome. Cases were divided into 2 groups: 25 cases before the learning curve had been overcome (early cases) and 35 later cases. The mean duration of surgery was 420.8 minutes for the initial cases and 281.7 minutes for the later cases (P<0.001). The console time was significantly shorter during the later cases (168.6 minutes) than during the early cases (247.1 minutes) (P<0.001). Although the volume of blood loss during surgery declined over time, there was no significant difference between the early and later cases. No other postoperative outcomes differed between the 2 groups. Pathology reports revealed the presence of mucosal invasion in 58 patients and submucosal invasion in 2 patients. Conclusions: RADG can be performed safely with acceptable surgical outcomes by experts in open gastrectomy.

TMDL Evaluation of Nakdong River Basin Using Load Duration Curve and Streamflow-Load Rating Curve (부하지속곡선과 유량-부하량 상관곡선을 이용한 낙동강 유역의 오염총량평가)

  • Shon, Tae Seok;Joo, Jae Seung;Park, Jae Beom;Shin, Hyun Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5B
    • /
    • pp.475-481
    • /
    • 2011
  • The TMDL standard flow as applying watershed management regime uses the average low flow of past 10 years. Moreover, the TMDL implementation assessment has been enforced through management of pollutant load satisfied objective water quality. Even though the present allocation and management through averaged low flow are still convenient, they are not enough to solve ultimate goals of watershed management to keep up recovery of water body. To maintain the same water quality concentration, the standard flow is required to consider total discharge in management plan which helps to keep healthy ecosystem. In view of this, it would be possible to approach reasonable assessment by reflecting variably changeable discharge from precipitation-streamflow relation and the TMDL standard establishment considering artificial regulated flow. Therefore, this study attempts to develop the TMDL method using Load Duration Curve (LDC) and Streamflow-Load Rating Curve (QLRC) considering total discharge and finds drawbacks with solutions as applying on Nakdong river TMDL unit watershed. Finally, this research evaluates possibility of application on pollutant load allocating and implementation assessment in Korea.

Estimation of Pollution Contribution TMDL Unit Watershed in Han-River according to hydrological characteristic using Flow Duration Curve (유량지속곡선을 이용한 수문특성별 한강수계 총량관리 단위유역의 오염기여도 추정)

  • Kim, Dong Young;Yoon, Chun Gyeong;Rhee, Han Pil;Choi, Jae Ho;Hwang, Ha Sun
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.6
    • /
    • pp.497-509
    • /
    • 2019
  • After the Total Maximum Daily Loads(TMDLs) was applied, it became beyond the limit of concentration management. However, it does not adequately reflect the characteristics of various watersheds, and causes problems with local governments because of the standard flow set. Thus, in this study, the Han River system is organized into four groups in estimating the Pollution Contribution by applying the Flow Duration Curve(FDC) created by the daily flow of data from the HSPF. And the method of this study is expected to be valuable as basic data for the TMDLs. As a result, Group I contains the main watersheds with no large hydraulic structures and tributary watersheds. There is no specificity in the FDC and the Pollution Contribution is estimated as rainfall runoff. Group II contains watersheds near the city where the FDC is maintained above a certain level during the Low Flow Conditions and the Pollution Contribution is estimated as the discharge flow of large scale point pollution facilities. Group III contains the main watersheds in which the large hydraulic structures are installed and FDC is curved in the Low Flow Conditions. So the Pollution Contribution is estimated as the water quality of the large hydraulic structures. Group IV contains the upstream in mainstream watersheds in which the large hydraulic structures are installed and the FDC is disabled before the Low Flow Conditions. As the flow is concentrated in the High Flow Conditions, the non-point pollution sources are estimated as the Pollution Contribution.