A Review of the Master Plan for Four Major Rivers Restoration Project

  • Park, Chang-Kun
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.6
    • /
    • pp.411-417
    • /
    • 2009
  • Lately the master plan for the Four Major Rivers Restoration Project has been released by the Ministry of Land and Maritime Affairs and relevant ministries. According to the master plan compared with the interim report made on 15 December 2008, the number of weirs for irrigation has increased from 5 to 16, the amount of dredging has increased from 220 million cubic metres to 570 million cubic metres, and the total cost estimated has increased from 14 trillion won to 22 trillion won. A critical review of the master plan by some research group will be summarized focused upon budget, objectives, securing water resource, dredging, and flood control etc. After various experts' forums and field surveys, it is concluded that the government should implement a joint-research program on assessing the impact of the project together with experts and citizens' groups as co-partners, in order to truly save or restore the four major rivers.

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.509-514
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok. Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented.

  • PDF

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.

Development of Hydrographic Dredging Surveying and Construction Management System Based on Grab Dredger (그래브 준설선에 의한 해상준설측량 및 시공관리시스템의 개발)

  • Lee, Jin Duk;Lee, Jae Bin;Kim, Hyun Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.21 no.4
    • /
    • pp.3-12
    • /
    • 2013
  • In order to evaluate dredging results scientifically the system which can manage and estimate working process by monitoring dredging process in real-time needs to be constructed. We constructed real-time dredging management system for guidance of a dredging vessel and for survey of dredging construction. This system was designed to have functions of dredger location by GPS, ship direction measurement by GPS/Gyroscope combination, Grab position measurement, dredging depth measurement and correction. In addition, we developed the programs for controlling and operating the constructed system. The system could induce the vessel to accurate position and conduct dredging according to plan and the effectiveness of the system was evaluated through the results of application to actual dredging construction site.

The Near-field Behavior of Effluent discharged from Confined Disposal Facility (제한투기시설에서 배출되는 여수의 근역거동)

  • 정대득;이중우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.11a
    • /
    • pp.95-107
    • /
    • 2000
  • The primary purpose of dredging work is to maintain navigational readiness and to increase environmental amenity, so that the dredging project which is composed of excavating, removing, transporting, storing and disposing dredged material must be carefully managed to insure that dredging works are completed in a cost-effective and environmentally safe manner. The most important point in dumping operations is an estimating and reducing the impacts of discharges at the dumping area. One of the most effective method for the reduction of ecological impacts at dumping area is using the schematic process composed of the sophisticated plan, precise work and predicting/reducing the impacts based on the numerical model and field observation. In this study, the numerical model is used to predict the near-field spatial fate and begavior of effluent discharged from Confined Dumping Facility(CDF) located near coastal area. To to this purpose, reappearing of tidal current was preceded. The model is then applied to Mokpo harbor, where capital dredging and maintenance dredging are conducted simultaneously and the CDF is under construction;. In the series of model case study, we found that the near-field behavior of effluent discharged from CDF was governed by the receiving water condition, outfall geometry, characteristics of efflent and CDF operating conditions.

  • PDF

The Behavior of Effluent Discharged from the Confined Dumping Facility (제한투기시설에서 배출되는 여수의 거동)

  • 정대득;이중우
    • Journal of Korean Port Research
    • /
    • v.14 no.4
    • /
    • pp.429-439
    • /
    • 2000
  • The primary purpose of dredging work is to maintain navigational readiness and to increase environmental amenity. Therefore the dredging project, which is composed of excavating, removing, transporting and storing or dumping dredged material, must be carefully managed to insure that dredging works are completed in a cost-effective and environmentally safe method. The most important point in dumping operations is evaluating and decreasing the impacts of dumping works at the dumping area. One of the most effective method for this purpose is using the schematic process composed of the sophisticate plan, precise work and predicting/reducing the impacts based on an numerical model being closely linked with field observation. In this study, a numerical model is used to predict the spatial transport and fate of the effluent discharged from the confined dumping facility(CDF) located at a coastal area. To achive this purpose, numerical models were used for reappearing the tidal current of concerned area. These models were then applied to Mokpo harbpr where capital dredging and maintenance dredging are being conducted simultaneously and the CDF is under construction. In series of model case study, we found that the effluent discharged from CDF was governed by the receiving water condition and outfall geometry, so that limit of near-field was 14∼500 meter down stream and 4∼150 meter in transverse direction. dilution ranged from 1.1 to 8.2 on the cases. Long-term diffusion characteristics was governed by the dilution rate during near-field behavior, ambient conditions and CDF operation modes.

  • PDF

Improve of Reservoir Dredging Ability Using GPS/GPR (GPS/GPR을 이용한 저수지 준설능력 향상)

  • Lee Dong-Rak;Hong Jung-Soo;Back Ki-Suk;Bae Kyoung-Ho
    • Spatial Information Research
    • /
    • v.14 no.1 s.36
    • /
    • pp.57-65
    • /
    • 2006
  • In general, the investigation for reservoir dredging are conducting a observation on the horizontal position and the depth of water by assembling GPS/Echo Sounder and Total Station/Echo Sounder, and it is computed at a section computation of riverbed, reservoir volume and dredging plan etc. at that times, the detail plane is determinated about soil volume, height for dredging. Planning has a fault that the method of sound detection using the Echo Sounder doesn't check up distribution of reservoir deposit. In this study, the author emphasizes that implementation of dredging with combined Global Positioning System(GPS) and Ground Penetration Radar(GPR) is well-done more than existed GPS/Echo Sounder. the combined equipment can be adapted to computation and dredging reffering to distribution of deposition. First of all, it is executed water tank modelling test through sampling for apply to test area and is estimated the possibility after passed far accuracy verification of equipment.

  • PDF

Numerical Simulation for River Safety of Saemangeum Basin according to Master Plan (새만금 종합개발계획에 따른 새만금 유역 치수 안전성 수치모의)

  • Jeong, Seok il;Yoo, Hyung Ju;Ryu, Kwang Hyun;Lee, Seung Oh
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.127-133
    • /
    • 2018
  • The Saemangeum master plan includes dredging and waterproofing materials, construction projects that can change the hydraulic characteristics of the Saemangeum and Mangyeong and Dongjin River basins. In this study, the river safety of 2030 when the Saemangeum master plan was completed for 100 year frequency, 500 year frequency and 100 year frequency applied RCP 8.5 scenario was examined using Delft3D. As a result of the analysis, it was confirmed that there was no overflowing point at the 100 year frequency, but the difference between the flood level and the river bank elevation was relatively small at the curved and river joint part. At the 100-year frequency with the 500-year frequency and the RCP 8.5 scenario, the possibility of overflowing at several locations was confirmed. The possibility of river bed loss due to fast velocity appears in the upstream part of Mankyung River and it is necessary to monitor the safety of hydraulic structures continuously. In addition, it is expected that the expansion of the area showing the characteristics of the lake due to dredging will affect the sediment mechanism and water quality, so detailed and diverse studies will be needed.

A Research on Diagnosis of Institutional Problem and Improvement Plan for Management in Coastal Dredged Sediment - Case Study of Masan Bay - (연안준설토 관리의 제도적 문제점 진단 및 개선방안 연구 - 마산만 사례를 중심으로 -)

  • Yi, Yongmin;Oh, Hyuntaik;Lee, Dae In;Kim, Gui Young;Jeon, Kyeong Am;Kim, Hye Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.5
    • /
    • pp.444-455
    • /
    • 2015
  • In relation to the utilization and disposal of dredged sediment caused by coastal dredging project, we diagnosed the status of legal standard and system, and proposed the improvement plan. Dredging costal sediment distinguished the usage and the disposal by the Standard for the Beneficial Usage of Dredged Sediment. The site where disposal has been completed could be used as a site for developmental project. In case of the usage of dredged sediment for reclamation, we found that the adaptation of the Standard for Beneficial Usage of Dredged Sediment is appropriate for reclamation considering the characteristic of soil, the differences of variables, and the distinction of standard analysis methods. The current the Standard for Beneficial Usage of Dredged Sediment requires the improvement with the usage of dredging coastal sediment in the following. First, the Standard needs to include the standard of the discrimination for reclamation. Second, the current Standard is necessary to be divided by two levels, it needs to be mitigated considering human health risk. Third, it is necessary to consider both the marine environmental impact assessment and mitigation plan near coastal dredging area.

Improvement of the Marine Environmental Assessment for Dredging and Ocean Disposal of Coastal Sediment in Korea (연안준설 및 준설토 해양투기 해양환경평가 개선방안)

  • Lee, Dae-In;Park, Dal-Soo;Eom, Ki-Hyuk;Kim, Gui-Young;Cho, Hyeon-Seo;Kim, Jong-Kyu;Seo, Young-Kyo;Baeck, Gun-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.3
    • /
    • pp.131-141
    • /
    • 2009
  • We studied improvement in marine environmental impact assessment and related management systems of coastal sediments that are dredged inshore but disposed offshore. After reviewing and diagnosing the existing assessment procedures and problems, we recommend to design the core assessment items and improve the reliability of assessment byenhancing the quality assurance/quality control (QA/QC) and verification processes. We proposed eco-friendly disposal plan for dredging sediment such as reuse system in land development was explored. A marine environmental database system was established to support the assessment processes. Guidelines for marine research and modelling were proposed for improving assessment of dredging and disposal of coastal sediment. Also, applying of screening and scoping for marine environmental assessment was reviewed.