• 제목/요약/키워드: Drainage System

Search Result 1,039, Processing Time 0.028 seconds

Massive Intracerebral Hemorrhage Following Drainage of Subdural Hygroma

  • Kim, Sung-Soo;Kim, Choong-Hyun;Cheong, Jin-Hwan;Kim, Jae-Min
    • Journal of Korean Neurosurgical Society
    • /
    • v.41 no.4
    • /
    • pp.261-263
    • /
    • 2007
  • Subdural hygromas are easily treated by trephination and drainage. Therefore, most neurosurgeons do not consider subdural hygromas seriously. However, various complications including intracerebral hemorrhage may develop after rapid drainage of subdural hygroma although rare. Postoperative intracerebral hemorrhage presents with a rapid deterioration of consciousness and focal neurological deficits occurring immediately after drainage of the subdural hygroma. The authors present an unfortunate massive intracerebral hemorrhage and pneumocephalus following drainage of the bifrontal subdural hygroma. The patient subsequently died. To prevent this disastrous complication, close neurosurgical observation and gradual drainage under a closed system seem mandatory. Possible pathogenic mechanisms for this unfavorable complication is discussed with a review of pertinent literatures.

Behavior of double lining due to long-term hydraulic deterioration of drainage system

  • Shin, Jong-Ho;Lee, In-Keun;Joo, Eun-Jung
    • Structural Engineering and Mechanics
    • /
    • v.52 no.6
    • /
    • pp.1257-1271
    • /
    • 2014
  • The hydraulic deterioration of the drainage system in tunnel linings is one of the main factors governing long-term lining-ground interactions during the lifetime of tunnels. Thus, in the design procedure of a tunnel below the groundwater table, the possible detrimental effects associated with the hydraulic deterioration should be addressed. Hydraulic deterioration in double-lined tunnels can occur because of reasons such as clogging of the drainage layer and drain-pipe blockings. In this study, the coupled mechanical and hydraulic interactions between linings due to drain-pipe blockings are investigated using the finite-element method. A double-lined structural model incorporating hydraulic behavior is developed to represent the coupled structural and hydraulic behavior between the linings and drainage system. It is found that hydraulic deterioration hinders flow into the tunnel, causing asymmetric development of pore-water pressure and consequent detrimental effects to the secondary lining.

Evaluation of DEM-based Channel Network Delineation Methods on Watershed Drainage System (DEM을 이용한 수로망 산정 기법에 따른 유역의 배수구조 평가)

  • Lee, Gi Ha;Yoon, Eui Hyeok;Kim, Joo Cheol;Jung, Kwan Sue
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1B
    • /
    • pp.1-11
    • /
    • 2011
  • Channel network delineation from DEM (Digital Elevation Model) is a fundamental pre-process for hydrologic model application since it determines the drainage system in a watershed. This study aims to propose an effective and efficient channel network delineation process and assess the effects of DEM-based channel networks on the watershed drainage system. For these objectives, we applied two methods to generate the channel networks of the Jinan-cheon catchment with $18.28km^2$ from the 20 m resolution DEM: a widely-used area-threshold method and a slope-area threshold method based on the relationship between contributing areas and local slopes. The results showed that the area-threshold method led to unreliable drainage system, which did not satisfy geomorphological laws with respect to drainage density and source area representation whereas the slope-area threshold method provided acceptable results under the geomorphological laws. Our suggestions in this study can give valuable pre-processing information in DEM-based hydrologic modeling.

Applicability examinations of induced drainage system for reduction of uplift pressure in underpass structures: Numerical study (지하차도 부력저감을 위한 유도배수공법의 적용성 검토: 수치해석적 연구)

  • Jo, Seon-Ah;Jin, Gyu-Nam;Sim, Young-Jong;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.123-134
    • /
    • 2013
  • Urban underground structures at low ground elevations (i.e. shallow substructures) unlike typical tunnel structures are subjected to low overburden and high water pressures. This often causes the underground structures to become damaged. Various conventional methods for the urban underpass structures such as dead weight increasement, round anchors, and tension piles, are significantly conservative and provok concerns about the costly, time-consuming installation process. Recently, permanent drainage system becomes to widely use for supplementing the conventional method's shortcomings, but, it is applied without the considerations for ground conditions and water table. In this study, therefore, numerical analyses are performed with various parameters such as groundwater level, wall height, and ground conditions in order to establish design guidelines for induced drainage system which is a kind of the permanent drainage method constructed at the Y-area. According to the numerical results, the induced drainage system is very effective in reducing the uplift pressure that acts on the base of underpass structures.

Analysis of the Effects of Drainage Systems in Wetlands Based on Changes in Groundwater Level, Soil Moisture Content, and Water Quality (지하수위, 토양수분함량 및 수질변화를 활용한 습윤화 지역의 배수시설 효과 평가)

  • Kim, Chang-Hoon;Ryu, Jeong-Ah;Kim, Deog-Geun;Kim, Gyoo-Bum
    • The Journal of Engineering Geology
    • /
    • v.26 no.2
    • /
    • pp.251-260
    • /
    • 2016
  • Groundwater flow due to hydraulic gradients across a geologic barrier surrounding a dam reservoir can cause swamps or wetlands to form on the downstream side of the dam, thereby restricting land use. The difference in head between the reservoir level and the downstream groundwater level creates a hydraulic gradient, allowing water to flow through the geologic barrier. We constructed a drainage system at the Daecheong dam to study the effects on groundwater levels and soil moisture contents. The drainage system consisted of a buried screened pipe spanning a depth of 1-1.5 m below a land surface. Groundwater levels were monitored at several monitoring wells before and after the drainage system was installed. Most well sites recorded a decline in groundwater level on the order of 1 m. The high-elevated site (monitoring well W1) close to the reservoir showed a significant decline in groundwater level of more than 2 m, likely due to rapid discharge by the drainage system. Soil moisture contents were also analyzed and found to have decreased after the installation of the drainage system, even considering standard deviations in the soil moisture contents. We conclude that the drainage system effectively lowered groundwater levels on the downstream side of the dam. Furthermore, we emphasize that water seepage analyses are critical to embankment dam design and construction, especially in areas where downstream land use is of interest.

Assessment of Field Application of Contaminated Sediment Removal Efficiency Using PVDF Combined Hybrid Tunnel Drainage (PVDF(Polyvinylidene Fluoride) 필름형 트랜스듀서 하이브리드 터널배수재에 대한 오염퇴적물 제거효율의 현장 적용성 평가)

  • Xin, Zhen-Hua;Moon, Jun-Ho;Kim, Young-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.513-519
    • /
    • 2019
  • Typically, contaminated sediments cause clogging of the drain pipe, which increases the residual water pressure in the drain pipe; this study constructed a system for improving drainage efficiency of tunnels by reducing physical and chemical obstructions through ultrasonic energy generated by a PVDF film. The developed hybrid drainage system utilized a PVDF material film fused with an existing drainage tunnel and maintenance system resulting in the ability to initialize the reverse piezoelectric effect, which was evaluated through an on site application. In order to investigate the maintenance performance of the tunnel drainage system, contaminated sediments were simulated in a drainage pipe to test the effect of ultrasonic conditions on drainage efficiency in the laboratory. As a result of applying the developed portable equipment, the ultrasonic energy was generated for about 20 minutes resulting in a reduction of 74.62% of the contaminated sediments and improving drainage efficiency. From the tunnel, acoustic pressure measurements were taken to calculate the response rate while taking into account the laboratory results. In addition, PVDF film was attached to the transverse and longitudinal side of the drainage pipes where contaminated sediments occur most often in the field tunnel. these calculations show contaminant removal was 90% effective.

The Prototype and Structure of the Water Supply and Drainage System of the Wolji Pond During the Unified Silla Period (통일신라시대 월지(月池) 입·출수 체계의 원형과 구조)

  • Kim, Hyung-suk;Sim, Woo-kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.4
    • /
    • pp.124-141
    • /
    • 2019
  • This research explored the relationship between the water quality issue of Wolji Pond (Anapji Pond) with the maintenance of the channel flow circulation system. The water supply and drainage system closely related to the circulation system of pond has been reviewed, rather than the existing water supply and drainage system that has been analyzed in previous studies. As a result of reviewing the water supply system, it has been learned that the water supply system on the southeastern shore of Wolji Pond, being the current water supply hole, has been connected to the east side garden facility (landscaping stone, curved waterway, storage facility of water) between the north and south fence and the waterway. This separate facility group seems to have been a subject of the investigation of the eastern side of Wolji Pond, with the landscaping stones having been identified in the 1920's survey drawings. The water supply facility on the southeastern shore, being the suspected water supply hole, seems to have some connection with the granite waterway remaining on the building site of Imhaejeon (臨海殿) on the southern side of Wolji Pond. It is inferred that it provides clean water, seeing that the slope towards the southwestern shore of Wolji Pond becomes lower, the landscaping stones have been placed in the filter area, and it is present in the 1920's survey drawings and the water supply hole survey drawing of 1975. The water drainage facility on the northern shore is composed of five stages. The functions of the wooden waterway and the rectangular stone water catchment facility seem not to be only for the water drainage of Wolji Pond. In light of the points that there are wood plugs in the wooden waterway and that there is a water catchment facility in the final stage, it is judged that the water of Balcheon Stream (撥川) may be charged in reverse according to this setup. Namely, the water could enter and exit in either direction in the water drainage facility on the northern shore It also seems that the supply to the wooden waterway could be opened and shut through the water catchment facility of rectangular stone group as well. The water drainage facility on the western shore is very similar to the water drainage facility on the northern shore, so it is difficult to avoid the belief that it existed during the Silla Dynasty, or it has been produced by imitating the water drainage facility on the northern shore at some future point in time. It seems to have functioned as the water drainage facility for the supply of agricultural water during the Joseon Dynasty. The water supply and drainage facilities in Wolji Pond have been understood as a systematized distribution network that has been intertwined organically with the facility of Donggung Palace, which was the center of the Silla capital. Water has been supplied to each facility group, including Wolji Pond, through this structure; it includes the drainage system connecting to the Namcheon River (南川) through the Balcheon Stream, which was an important canal of the capital center.

Investigation and Complementary Measures Establishment for Flood on Tidal Reclaimed Paddy Fields (간척지 논 침수 원인 조사와 방재 대책 수립)

  • Jeong, Ju-Hong;Yoon, Kwang-Sik;Choi, Soo-Myung;Yoon,, Suk-Gun;Go, Young-Bae;Kim, Young-Taek
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.105-114
    • /
    • 2010
  • Tidal land reclamation provided water resources and land for agriculture and contributed stable crop production. However, climate change by global warming disrupts the hydrologic circulatory system of the earth resulting in sea level rise and more frequent flood for reclaimed arable land. Recently, Suyu reclaimed paddy field in Jindo-gun experienced prolonged inundation after heavy rainfall and there is a growing risk of flood damage. Onsite survey and flood analysis using GATE_Pro model of Korea Rural Corporation were conducted to investigate causes of flooding. To perform the analysis, input data such as inflow hydrograph, the lowest elevation of paddy field, neap tide level, management level of Gunnae estuary lake at the time of the flood were collected. Flood analysis confirmed that current drainage facilities are not enough to prevent 20year return period flood. The result of analysis showed flooding more than 24hours. Therefore, flood mitigation alternatives such as sluice gate expansion, installation drainage pumping station, refill paddy land, and catch canal were studied. Replacing drainage culvert of Suyu dike to sluice gate and installing drainage pumping station at the Gunne lake were identified as an effective flood control measures. Furthermore, TM/TC (SCADA) system and expert for gate management are required for the better management of drainage for estuary dam and flood mitigation.

  • PDF