For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.
In power system study, relibility assessment has been an important topic during past several decards because sudden power interruption can bring about enormous economic loss. although the size of a substation is smaller than that of generation system or transmission system, switching actions after fault(s) make reliability assessment of substation rather complex situations such as switching actions easily and permit various probability distributions in describing substation elements. Despite this ability of Monte Carlo simulation, one-parameter exponential distribution is still popular in this reliability assessment. This paper examines the characteristics of several two-parameter probability distributions, and offers new parameter decision rule based on average and variance of the target to be modelled. In case study, this paper shows the profits by using Weibull distribution which is one of two-parameter probabilistic distributions instead of exponential one.
It is impossible to take the instant action in the distribution system When fault occures in a substation because operation of the substation and the distribution system are separated. However the power system automation has been studying about unity operation and co-operation between SCADA and DAS(Distribution Automation System). In this paper proposes a new algorithm of efficiency restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR in united system between DAS and SCADA. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads. In the case studies, the proposed algorithm have been verified in 2 MTR and 3 MTR substation
This paper proposes an expert system which can enhance the accuracy of real-time bus reconfiguration strategy by adopting local minimum tree search method and minimize the spreading effect of the fault by considering totally the operating condition when a main transformer fault occurs in the automated substation. The local minimum tree search method to expand the best-first search method. This method has an advantage which can improve the performance of solution within the limits of the real-time condition. The inference strategy proposed expert system consists of two stages. The first stage determines the switching candidate set by searching possible switching candidates starting from the main transformer or busbar related to the event. And, second stage determines the rational real-time bus reconfiguration strategy based on heuristic rules for the obtained switching candidate set. Also, this paper studies the generalized distribution substation modelling using graph theory and a substation database is designed based on the study result. The inference engine of the expert system and the substation database is implemented in MFC function of Visual C++. Finally, the performance and effectiveness of the proposed expert system is verified by comparing the best-first search solution and local minimum tree search solution based on diversity event simulations for typical distribution substation.
This study identifies the comparison of Technical specification and Characteristics of DC Protection Relay(ETCPU200) used in DC Distribution System in Korea. ETCPU200 has completed Field Test and approved its capability by finding out causes of recent operations through lately developed digital DC protection relay in parallel operation at Maebong-Substation, Sangbong-Substation, Nakseongdae-Substation, Euljirosaga-Substation, Jegi-Substation and Chongyangri T/P area. It also examines additional features for efficient System Analysis and Operations.
Distribution networks are operated in radial fashion during the normal state. Loop configuration is also required temporally in case of live load transfer among the adjacent feeders. Voltage angles of each substation buses are very important data in order to calculate power flow of the loop structured distribution feeders. This paper proposes substation bus voltage angle calculation method using voltage angle difference measured at the normally open tie switches. Simulation case studies using Matlab simulink have been performed to establish feasibility of proposed method.
스마트 그리드 응용에서 ICT(Information and Communication Technologies) 활용은 전력망을 효율성 있고 신뢰성 있게 구축할 수 있다. 전력 시설 내에서 필요한 정보를 교환하는 스마트 그리드 표준으로 IEC 61850이 채택되었다. 그러나 이더넷을 사용하는 IEC 61850과 같은 기술을 소규모 배전 변전소 자동화에 직접 적용하면, 소규모 배전 변전소 그 자체의 가치보다 더 많은 비용이 소요될 수 있다. IEEE 802.15.4 기술은 적은 설치비용과 설치의 용이성으로 인해 전력 설비 자동화 분야에서 관심을 받고 있다. 다소 덜 엄격한 성능이 요구되는 D1 소규모 배전 변전소에 IEEE 802.15.4를 이용하는 연구들이 진행되고 있다. 본 논문에서는 소규모 배전 변전소에 IEEE 802.15.4를 적용하고, 실제 장비들을 이용하여 성능분석을 수행 하였다. 성능 분석 결과를 IEC 61850 메시지 유형과 비교 분석하여 IEEE 802.15.4 적용 범위를 결정하였다.
Since transmission and distribution neutral wires are connected with a substation grounding grid, it is very difficult to measure grounding resistance of isolated substation grounding grid after the substation is energized. It is impractical to isolate the grounding grid from other parallel connections such as distribution line neutrals and overhead ground wires for grounding resistance measurement only. In this paper, we proposed and demonstrated a novel measurement method of grounding resistance of isolated substation grounding grid. For this method, grounding current division factor and conventional FOP(Fall-Of-Potential) profiles were measured at power supplying 154[kV] substation. The obtained FOP profile was processed with the measured grounding current division factor to produce the grounding resistance of isolated grounding grid. Simulated FOP profile agreed well with the measured one showing the validity of the proposed method.
The Load Tap Changing (LTC) transformer and Shunt Capacitor (SC) bank are major devices for voltage and reactive power control in a distribution substation. Thus, the coordination operation of a LTC transformer and a SC bank is required to achieve better voltage and reactive power compensation at a distribution substation in the same time. This paper proposes coordinate control method of LTC transformer and SC bank to achieve better voltage and reactive power compensation and operation times of these two devices in the same time. The mathematical formulations of the proposed coordinate control method are introduced. Sample case studies are shown to verify the effectiveness of the proposed coordinate control method.
Due to increase of fault current, various superconducting fault current limiter (SFCL) are researched. We studied a power distribution system with SFCL. Along the way, we knew characteristics of fault current according to a distance from substation to fault point. Fault current is reduced by distance`s increase from substation. Also, SFCL.s effects are decreased by distance too. Therefore, we analyzed the fault current by a distance from substation to fault point when a SFCL was applied into a power distribution system. We simulated using a PSCAD/EMTDC.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.