• Title/Summary/Keyword: Distribution Fault

Search Result 1,024, Processing Time 0.028 seconds

Advanced Numerical Relaying for Power Transformer Protection (전력용변압기보호를 위한 개선된 수치계전기법)

  • Park, Chul-Won;Shin, Myong-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.217-219
    • /
    • 2004
  • The second harmonic component could be decreased by magnetizing inrush when there have been changes to the material of the iron core or its design methodology. The higher the capacitance of the high voltage status and underground distribution, the more the differential current includes the second harmonic during the occurrence of an internal fault. Therefore, the conventional second harmonic-restrained RDR needs modification. This paper describes an advanced numerical algorithm that utilizes terminal voltage, differential current harmonics, harmonic ratio, and flux-differential current slope. Based on the results of testing with WatATP99 simulation data, the proposed algorithm was proven to be faster and more reliable.

  • PDF

Workload Distribution and Performance Analysis Simulation for a Distributed Server Cluster System (분산 서버 클러스터 시스템의 부하 분산 및 성능 분석 시뮬레이션)

  • 최은미;이원규
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.27-34
    • /
    • 2003
  • A distributed server cluster system is a cost-effective system to provide a service application for clients with reliable, scalable, available, and fault-tolerant features. In order to provide high quality services, it is necessary to evaluate service performances, tune the server system, and analyze performances. In this paper, we propose a simulator to generate workloads based on statistic configuration according to estimated application traffics, apply workload scheduling algorithms, and evaluate the simulation results. We introduce the simulator design modelling and architecture. By using flexible parameters, the simulator is able to generate various patterns of workloads with different statistics, and configure system environments such as the number of server nodes, system resources considered, and their capacities. With this simulator, we introduce two scenarios: one is to find appropriate thresholds for the best performance of cluster system, and the other is to find the suitable scheduling algorithm for workload characteristics of service applications.

  • PDF

A Study on Micom Algorithm Design for Prevention of Serial Parallel Arc Accident (직병렬아크사고 예방을 위한 마이컴 알고리즘 설계에 관한 연구)

  • Choi, Jung-Kyu;Kwak, Dong-Kurl;Choi, Shin-Hyeong;Jung, Do-Young;Kim, Dae-Hwan
    • Proceedings of the KIPE Conference
    • /
    • 2018.11a
    • /
    • pp.9-11
    • /
    • 2018
  • This paper studies on the development of an electric fire prevention system with the detection and alarm in case of parallel arc fault occurrence in low voltage distribution lines. The proposed detector has the characteristics of high speed operation responsibility and superior system reliability from composition using a large number of semiconductor devices. The line voltage is always feedback, and when an arc or a spark occurs, these are detected by the microcomputer. In addition, we design and develop algorithms using high speed and high precision microcomputer. A new conceptual control technique is adopted that RCD cuts-off by forming a forced short circuit between the phase voltage and ground in the event of an electrical accident. Some experimental tests of the proposed system also confirm practicality and the validity of the analytical results.

  • PDF

A basic study on protection system of superconductivity power system (대용량 초전도 신전력계통 보호방식 문제해결을 위한 기본연구)

  • Lee, Seung-Ryul;Kim, Jong-Yul;Yoon, Jae-Young;Lee, Byong-Jun
    • Progress in Superconductivity and Cryogenics
    • /
    • v.9 no.3
    • /
    • pp.16-20
    • /
    • 2007
  • This paper describes protection system of new distribution power system with superconducting power devices such as HTS cable, HTS transformer, HTS-FCL. First of all, this paper investigates protection systems of Korean power system and then do a basic study on relaying systems in the power system with HTS power devices. For the more detailed results, we did the study using EMTDC relaying system modeling from the viewpoint of superconducting power devices application. Then we proposed some solution for a high resistance fault problem.

A Study on the Transient Ground Impedance Modeling for Rod-type Grounding Electrodes by Frequency and Time Domain Characteristic Tests (주파수 및 시간영역 특성시험에 의한 봉형 접지전극의 과도 접지임피던스 모델링에 관한 연구)

  • Kim, Jong-Uk;Kim, Kyung-Chul;Shin, Pan-Seok;Choi, Jong-Ki;Choi, Sun-Kyu;Kim, Dong-Myung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.2
    • /
    • pp.133-141
    • /
    • 2010
  • Grounding system insures a reference potential point for electric devices and also provides a low impedance path for fault currents in the earth. The ground impedance as function of frequency is necessary for determining its performance since fault currents could contain a wide range of frequencies. Copper and concrete rod electrodes are the most commonly used grounding electrode in electric distribution systems. In this paper, the ground impedance of copper and concrete rods has been measured by frequency and time domain characteristic tests. An equivalent transfer function model of the ground impedance is identified from the measured values by using ARMA method and evaluated by comparing conventional grounding impedances.

Test field for the application of IEC 60364 in Korea (접지규정 IEC 60364의 국내 적용을 위한 실증시험장 구축)

  • Nam, Kee-Young;Choi, Sang-Bong;Ryoo, Hee-Suk;Lee, Jae-Duck;Jeong, Seong-Hwan;Kim, Dae-Kyung
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.116-118
    • /
    • 2005
  • IEC 60364-4-44 provides rules for the protection against the effects of conducted and radiated disturbances on electrical installations. Especially this standards deals with the protection of low voltage facility against the ground fault in the high voltage side of power distribution system. Many countries defines the regulations on the use and production of electrical facilities based on their own power system and technical references which are considered to be suitable for themselves. The background of circuit of IEC 60364 is based on the ungrounded system as most of European countries adopt. However, since domestic ground system is multi-grounding system different from European system, it is necessary to evaluate or prove the effect of the IEC 60364 for introducing and applying it to the domestic grounding system as a Korean standard. This paper presents the establishment of test field to get background data to introduce the IEC 60364 and to evaluate the standard is applicable or not to domestic rule for the protection against ground fault through the related test.

  • PDF

Real-Time Bus Reconfiguration Strategy for the Fault Restoration of Main Transformer Based on Pattern Recognition Method (자동화된 변전소의 주변압기 사고복구를 위한 패턴인식기법에 기반한 실시간 모선재구성 전략 개발)

  • Ko Yun-Seok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.11
    • /
    • pp.596-603
    • /
    • 2004
  • This paper proposes an expert system based on the pattern recognition method which can enhance the accuracy and effectiveness of real-time bus reconfiguration strategy for the transfer of faulted load when a main transformer fault occurs in the automated substation. The minimum distance classification method is adopted as the pattern recognition method of expert system. The training pattern set is designed MTr by MTr to minimize the searching time for target load pattern which is similar to the real-time load pattern. But the control pattern set, which is required to determine the corresponding bus reconfiguration strategy to these trained load pattern set is designed as one table by considering the efficiency of knowledge base design because its size is small. The training load pattern generator based on load level and the training load pattern generator based on load profile are designed, which are can reduce the size of each training pattern set from max L/sup (m+f)/ to the size of effective level. Here, L is the number of load level, m and f are the number of main transformers and the number of feeders. The one reduces the number of trained load pattern by setting the sawmiller patterns to a same pattern, the other reduces by considering only load pattern while the given period. And control pattern generator based on exhaustive search method with breadth-limit is designed, which generates the corresponding bus reconfiguration strategy to these trained load pattern set. The inference engine of the expert system and the substation database and knowledge base is implemented in MFC function of Visual C++ Finally, the performance and effectiveness of the proposed expert system is verified by comparing the best-first search solution and pattern recognition solution based on diversity event simulations for typical distribution substation.

A Study on Auxiliary Control Safety Apparatus for RCD Trip on Electric Arc and Spark Disasters - Using by Power Semiconductor Switching Device - (아크 및 스파크 재해에 대한 누전차단기 트립을 위한 보조제어 전기안전장치에 관한 연구 - 전력용 반도체 스위칭 소자 적용 및 응용 -)

  • Kwak, Dong-Kurl;Shin, Mi-Young;Jung, Do-Young
    • Fire Science and Engineering
    • /
    • v.20 no.1 s.61
    • /
    • pp.71-76
    • /
    • 2006
  • The major causes of electrical fire are classified to short circuit fault, overload fault, electric leakage and electric contact failure. The occurrence factor of the fire is electric arc or spark accompanied with electrical faults. Residual Current Protective Device(RCD) of high sensitivity type used at low voltage wiring cuts off earth leakage and overload, but the RCD can't cut off electric arc or spark to be a major factor of electrical fire. As the RCDs which are applied low voltage distribution panel are prescribed to rated breaking time about 30[ms](KS C 4613), the RCDs can't perceive to the periodic electric arc or spark of more short wavelength level. To be improved on such problem, this paper is proposed to a auxiliary control apparatus for RCD trip on electric arc or spark due to electrical fire. Some experimental results of the proposed apparatus is confirmed to the validity of the analytical results.

Discontinuous Fracture Characteristics and Fractal Dimensions of Groundwater Flow Section in Youngchun Waterway Tunnel (영천댐 도수로터널내 지하수 유출구간의 불연속성 단열 특성 및 단열 프랙탈 차원)

  • 이병대;추창오;이인호;정교철;함세영;조병욱
    • The Journal of Engineering Geology
    • /
    • v.12 no.3
    • /
    • pp.333-344
    • /
    • 2002
  • To clarify the relationship between groundwater flow tate and statistical distribution of fractures in Youngchun waterway tunnel, the fracture characteristics and fractal dimensions of groundwater flow section were evaluated. The flow rate of 84,465m$^3$/day was identified in fault, accounting for about 70 percent of the total How rate. The flow rate of 36,525m$^3$/day was identified in joint, accounting for about 30 percent of the total flow rate. The flow late in the NATM section of sedimentary rocks increased with the fractal dimensions. The fractal dimensions determined in fault or fracture zones show more positive relation with the flow rate than those in joint developed zones.

The Power Line Deflection Monitoring System using Panoramic Video Stitching and Deep Learning (딥 러닝과 파노라마 영상 스티칭 기법을 이용한 송전선 늘어짐 모니터링 시스템)

  • Park, Eun-Soo;Kim, Seunghwan;Lee, Sangsoon;Ryu, Eun-Seok
    • Journal of Broadcast Engineering
    • /
    • v.25 no.1
    • /
    • pp.13-24
    • /
    • 2020
  • There are about nine million power line poles and 1.3 million kilometers of the power line for electric power distribution in Korea. Maintenance of such a large number of electric power facilities requires a lot of manpower and time. Recently, various fault diagnosis techniques using artificial intelligence have been studied. Therefore, in this paper, proposes a power line deflection detect system using artificial intelligence and computer vision technology in images taken by vision system. The proposed system proceeds as follows. (i) Detection of transmission tower using object detection system (ii) Histogram equalization technique to solve the degradation in image quality problem of video data (iii) In general, since the distance between two transmission towers is long, a panoramic video stitching process is performed to grasp the entire power line (iv) Detecting deflection using computer vision technology after applying power line detection algorithm This paper explain and experiment about each process.