• Title/Summary/Keyword: Distribution Fault

Search Result 1,024, Processing Time 0.048 seconds

A Study of Failure Rate Calculation Methods in Distribution System Reliability (배전 계통 신뢰도에서 고장률 산출 기법에 관한 연구)

  • Chai, Hui-Seok;Shin, Hee-Sang;Kang, Byoung-Wook;Ryu, Ki-Hwan;Kim, Jae-Chul;Choo, Dong-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.326-327
    • /
    • 2011
  • Failure rate serves as a pivotal role in reliability study. When the system operates, failure datum of the system reflects the actual operating environment. Therefore, when we estimate the system's with the component failure data, we can find the more exact failure rate that reflected the system's operating environment. In this paper, we use the components' fault data and find out failure rate.

  • PDF

Multiple Fault Recovery Using 3-phase Load Flow in Distribution System and Load Balancing (배전계통 3상 조류계산을 이용한 다중고장복구와 부하균등화)

  • So, Sung-Min;Kim, Kurn-Jong;Park, Cheol-Woo;Yang, Min-Uk;Kim, Jin-Hyeok
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.246-247
    • /
    • 2011
  • 배전계통에서 고장발생시 오조작으로 인해 손실이 발생한다. 따라서 신속하고 정확하게 고장을 복구하고 복구한 후 배전계통의 손실을 최소화하고 안전한 운영과 미래 계획을 위해서는 3상 조류계산을 기반한 고장복구 해석과 최적연계를 해석을 수행하는 것이 필요하다. 고장에는 기본적으로 단일 고장발생이 있지만, 다중고장발생도 존재하기에 본문에서는 3상 조류계산을 통해 다중고장 발생 시 고장복구해석과 복구 후 최적연계를 통한 부하균등화를 연구해 보았다.

  • PDF

On-Grid Hybrid PCS Control considering the Momentary Voltage Sag (순간전압강하를 고려한 계통연계형 하이브리드 PCS 제어)

  • Lee, Yong-Sik;Jeong, Sung-Won;Gim, Jae-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1330-1331
    • /
    • 2011
  • The on-grid distributed power system operated antiislanding due to the momently voltage sag of the power system, fault and etc. According to the 'Dispersed Generations in Distribution Systems Connection Technology Standard', the utilizable time ratio of PCS is low because of being put into in the steady state of the power system after 5 minutes. In this paper, the output characteristic is optimized with the hybrid system consisting of the wind system and PV system. And energy of hybrid system is supplied to the power system. Also, DVR function was applied to PCS to compensate the voltage sag frequently happening for a power system. The control performance of the proposed hybrid PCS is analyzed and simulated using PSIM to validate the system performace.

  • PDF

Measurement and Analysis of the Dangerous Voltage Around Grounding Electrode for Safety in Substation Ground (변전소 접지설계를 위한 접지전극 주변의 위험전압 측정과 분석)

  • Son, Seok-Geum;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.214-219
    • /
    • 2011
  • The substation grounding design,"IEEE Guide for Safety in AC Substation Grounding (ANSI / IEEE Std 80)"has been widely used. Substation grounding design and substation grounding resistance of grounding network site to predict the voltage at the risk of a very important task, which is a ground fault current due to the influx of the ground network and due to rise in the Earth's potential can be applied to human dangerous Voltage within safe tolerances be configured to be the ground because the network. IEEE Std. 80 for the substation construction safety equipment on the ground securing the ground electrode and the mesh around the boundary potential distribution in terms of risk analysis by the touch voltage and the reference was to clean up the definition and the basic steps of the voltage of the voltage limits the risk of peripheral grounding electrode Suppression by the simulator through a new secure from dangerous voltage design techniques were presented.

Analysis of the International Safety Criteria of IEEE Std 80 and IEC 479-1 (배전용 접지전극 안전성 분석을 위한 국제기준 검토)

  • Kang, Moon-Ho;Park, Jae-Duck;Lee, Heung-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.214-217
    • /
    • 2005
  • To improve the safety of facilities and human beings when the ground fault occurs, public power utility prescribes the reasonable ground resistances, measures and controls the ground resistance of all the ground electrodes biennially. Concerning the safety of human, there are two safety criteria widely accepted, i.e. the IEEE Std 80-2000 and the IEC 479-1:1994. The IEEE Std 80-2000 is based on a simplified electric shock model usually translated into permissible touch and step voltages. The IEC 479-1:1994 is less specific than IEEE Std 80-2000 for analysis purpose. The IEC 479-1:1994 provides values of permissible body current against electric shock duration. This paper provides a technical study of these two standards to analyze the safety of human beings of ground electrodes developed recently for distribution power system.

  • PDF

A PROTECTION AND FAULT ISOLATION SECTION ALGORITHM USING COMMUNICATION BASED ON INTELLIGENT FOR DISTRIBUTION SYSTEM (배전계통에서의 agent기반의 보호 및 고장 구간 분리 알고리즘)

  • Jin, Young-Taek;Park, Sung-Jun;Jo, Yong-Hwan;Xiang, Ling;Guan, Kangle;Lee, Seung-Jae;Choi, Myeon-Song
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.722-723
    • /
    • 2011
  • 국가차원의 신재생에너지 활성화 방안에 따라 지자체 등의 분산전원 시설계획이 점차 증가하고 있다. 이에 따라서 기존의 radial 구조가 아닌 closed loop을 운영하기 위해서는 보호협조에 대한 문제가 확실히 해결되지 않고서는 계통을 안정적으로 운영할 수 없다. 따라서 본 논문에서는 radial 계통 및 계통이 변경되거나 분산전원이 연계 시 closed loop 구조를 가지는 계통의 보호기기 및 자동화 개폐기들을 Agent화 시켜 통신을 이용한 보호 및 고장 구간 분리 알고리즘을 제안 하고자 한다.

  • PDF

Development of Fault Analysis Evaluation System for Dispersed Power Sources in Distribution Systems (분산전원 설치시의 사고해석 및 평가시스템 개발)

  • Rho, Dae-Seok;Kim, Chang-Hyeok;Wang, Yong-Peel;Jang, Young-Gil;Seo, Soon-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.432_433
    • /
    • 2009
  • 분산전원의 소유자(발전사업자) 및 시공하는 공사업체들은 배전계통에 분산전원을 설치하고 운용할 때, 보호방식에 대한 상세한 검토 없이 연계공사를 추진하여, 많은 문제점에 부닥치고 있는 실정이다. 이들 복잡한 기술적 고려사항을 정확하게 파악하기 위해서, 한전에서 정한 계통연계기술 지침과 관련 해설서 등을 모두 이해해야 하는데, 발전사업자나 시공업자가 수권의 분량을 모두 해석하고 이해하기에는 어려운 점이 있다. 분산전원의 역 조류에 의하여 분산전원의 설치 공사 후, 운용상에 많은 문제점이 유발되고 있는 실정이다. 특히 계통 측의 사고나 분산 전원 소유자의 사고 발생 시에 다른 수용가에게 피해를 끼치는 사례들이 보고되고 있다. 따라서 본 연구에서는 분산전원의 보호 협조에 예상되는 기술적인 문제점을 자동적으로 검토, 분석할 수 있는 사고해석 자동평가시스템을 개발하였다.

  • PDF

A Study on the Cause of the Fault on Underground Distribution Line (지중배전선로 고장요인에 관한 연구)

  • Jung, Jong-Yon;Seon, Sang-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.302_303
    • /
    • 2009
  • 지중배전선로 고장발생현황을 분석한 결과 설비별로는 케이블 고장이 가장 많았고, 그 다음으로 개폐기, 접속재, 변압기 순으로 고장이 많이 발생하였다. 원인별로 보면 일반인 과실과 자연열화에 의한 고장이 대부분을 차지하였다. 지중고장 유형 중 가장 많은 케이블 외상 고장은 인적 과실에 의한 고장으로 이와 같은 인적 과실에 의한 고장이 전체 지중고장의 50% 이상을 차지하며 케이블 및 접속재 열화고장 등 관리소홀에 의한 고장은 전체 지중고장의 20% 이상을 차지하였다. 인적 과실 및 관리소홀에 의한 고장은 천재지변과는 달리 설비관리 노력으로 충분히 감소시킬 수 있다. 지중고장을 감소시키기 위한 구체적인 방안으로는 선로굴착개소 순시 및 입회 철저, 굴착개소 관련 DB의 정확도 유지, 설비열화 진단 및 보강, 설비진단 신기술 개발 및 도입, 접속개소 시공품질 향상 등이 필요할 것으로 판단된다.

  • PDF

A Study of distribution line Protective devices operation on the distributed generation system (양방향 분산전원 보호협조 운영방안 연구)

  • Lee, Sang-Ho;Seol, Il-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.145_146
    • /
    • 2009
  • 최근 한국전력의 일선 사업소에서 배전선로 계통운영 업무에 많은 어려움을 겪고 있다. 분산형전원의 보급이 확대되면서 단방향 고장전류로 처리하던 보호협조 및 배전자동화 업무에 문제점이 발생되면서 혼선이 생기고 있는 것이다. 현행 배전선로 보호협조 업무는 모두 방향성이 없는 형태로 OCR, OCGR과 Recloserfh 대변되는 배전용 차단기의 협조방안으로 운영되어 왔으며, 배전자동화의 경우에도 부하측 공장에 대해 고장표시기(Fault Indicator)를 발생시키는 로직을 활용하여 배전선로의 안정화에 크게 기여하여 왔다. 하지만 최근 급속도로 발전하는 신재생에너지 사업과 관련하여 배전선로와 연계된 분산전원이 점차로 많아지고 있으며, 따라서 이제는 양방향 분산전원를 고려한 보호협조가 적용되어야 할 상황이다. 이에 발맞추어 최근 여러각도에서의 분산전원 연계기술에 대한 많은 연구가 진행되고 있다. 본 논문에서는 현행 배전선로에서의 분산전원 연계시 나타나는 문제점과 그 대책에 대해 알아보고자 한다.

  • PDF

The Self-Fault Restoration Strategy for the Load Balancing in the Distribution Systems (부하 균등화를 지향하는 배전계통의 자율적 고장복구 방법론 연구)

  • Ko, Yun-Seok;Lee, Seo-Han;Choi, Hyun-Chul;Shin, Jae-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.147_148
    • /
    • 2009
  • 본 연구에서는 기존 중앙제어방식의 고장구간 분리 및 복구 시 문제점을 해소하기 위해 새로운 시도로서 고장이 완전히 분리된 상태에서 자율적 복구 알고리즘을 제안하였다. 제안된 방법론에서 무전압을 경험하는 FRTU들은 분하분할을 시도하고, 각 연계 개폐기 FRTU들은 자기의 부하융통 영역들을 동시에 자율적, 순차적으로 결정하도록 함으로서 전전시간을 최소화함은 물론, 합리적인 범위 내에서 부하분담 균등화가 얻어지도록 설계하였다.

  • PDF