• 제목/요약/키워드: Dismantling Project

검색결과 28건 처리시간 0.03초

Evaluation Methodology of Remote Dismantling Equipment for Reactor Pressure Vessel in Decommissioning Project

  • Hyun, D.J.;Choi, B.S.;Jeong, K.S.;Lee, J.H.;Kim, G.H.;Moon, J.K.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • 제1권1호
    • /
    • pp.83-92
    • /
    • 2013
  • A novel methodology to evaluate remote dismantling equipment for a reactor pressure vessel (RPV) in a decommissioning project is presented in this paper. The remote dismantling equipment, mainly composed of cutting tools and positioning equipment, is absolutely required to cut and handle highly radioactive and large components in nuclear power plants (NPPs); this equipment has a great effect on the overall success of the decommissioning project. Conventional evaluation methods have only focused on cutting technologies or positioning equipment, although remote dismantling equipment cannot achieve its goal without organic interaction between the cutting tools and the positioning equipment. In this paper, the cutting tools and the positioning equipment are evaluated by performance parameters according to their original characteristics, the relationship between the two systems, and common factors. Finally, the remote dismantling equipment used in recent decommissioning projects has been evaluated based on the proposed methodology. The results of this paper are expected to be useful for future decommissioning projects.

지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구 (A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

연구로 안전 해체를 위한 스케쥴링 최적화 (Scheduling Optimization for Safety Decommissioning of Research Reactor)

  • 김태성;박희성;이종환;장성호;김상호
    • 대한안전경영과학회지
    • /
    • 제8권3호
    • /
    • pp.67-75
    • /
    • 2006
  • Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.

4대강 살리기사업의 재평가와 보의 운용방안 (Reassessment on the Four Major Rivers Restoration Project and the Weirs Management)

  • 이종호
    • 환경영향평가
    • /
    • 제30권4호
    • /
    • pp.225-236
    • /
    • 2021
  • 4대강 살리기사업(이하 4대강 사업)에 대한 마스터플랜, 사전환경성검토, 환경영향평가, 사후환경 영향조사, 4차례의 감사, 환경부 4대강 조사·평가 기획위원회의 금강과 영산강의 5개 보에 대한 해체 또는 부분 해체 제안 등을 고찰·분석한 결과는 다음과 같다. 첫째 보 운영과 보 개방으로 인한 수질 영향을 비교하여 비용편익분석을 해야 하나 보 개방시 수질 측정자료 부족으로 보 건설전 수질 측정자료로 대체하였기 때문에 수질 영향 분석이 미흡하여 비용편익분석이 제대로 될 수 없었다. 둘째, 금강과 영산강의 보 해체에 대한 비용편익분석 결과에 따라 세종보와 공주보의 해체, 백제보의 수문 상시 개방, 죽산보의 해체, 승촌보의 수문 상시 개방을 결정하였으나, 보 유지시에 대한 비용편익분석을 실시하지 않아 보 해체 결정의 타당성에 문제가 있다. 셋째 4대강 사업 전후 16개 보의 수질 변화를 보면 COD와 Chl-a는 대체로 악화되었고 BOD, SS, T-N, T-P는 개선되었다. 그러나 보 해체시 수질 관련 비용편익분석에서 4대강 사업후 악화된 COD 항목만을 반영하였고 4대강 사업후 개선된 BOD, SS, T-N, T-P 항목에 대한 수질 관련 비용(편익)은 반영하지 않았으므로, 보 해체 편익 산정시 수질 편익이 지나치게 과장되었다고 볼 수 있다. 넷째 공주보와 죽산보의 경우 가동보가 대부분이라 수질 악화시 특히 녹조 심화시 보 개방으로 보 해체와 같은 효과를 기대할 수 있고, 세종보도 가동보가 전체 보 길이의 64%나 되므로 보 개방으로 보 해체 시와 비슷한 효과를 얻을 수 있다. 댐·보·저수지 연계운영을 통해 수질관리가 가능하므로 보 해체만이 수질관리나 수생태계 개선방안이라 단정할 수 없다. 다섯째 가뭄과 홍수에 대응하기 위해 보와 연계되는 도수로 건설로 4대강 상류 가뭄지역에 대한 농업용수 공급 능력을 확보하는 것이 필요하므로, 현재로서는 보의 해체보다는 보의 활용 방안을 모색해야 할 것이다.

Development of an information reference system using reconstruction models of nuclear power plants

  • Harazono, Yuki;Kimura, Taro;Ishii, Hirotake;Shimoda, Hiroshi;Kouda, Yuya
    • Nuclear Engineering and Technology
    • /
    • 제50권4호
    • /
    • pp.606-612
    • /
    • 2018
  • Many nuclear power plants in Japan are approaching the end of their planned operational life spans. They must be decommissioned safely in the near future. Using augmented reality (AR), workers can intuitively understand information related to decommissioning work. Three-dimensional (work-site) reconstruction models of dismantling fields are useful for workers to observe the conditions of dismantling field situations without visiting the actual fields. This study, based on AR and work-site reconstruction models, developed and evaluated an information reference system. The evaluation consists of questionnaires and interview surveys administered to six nuclear power plant workers who used this system, along with a scenario. Results highlight the possibility of reducing time and mitigating mistakes in dismantling fields. Results also show the ease of referring to information in dismantling fields. Nevertheless, it is apparently difficult for workers to build reconstruction models of dismantling fields independently.

Preliminary Analysis on Decommissioning Strategies for Fukushima Daiichi Nuclear Power Station From Waste Management Perspective

  • Watanabe, Naoko;Yanagihara, Satoshi
    • 방사성폐기물학회지
    • /
    • 제19권3호
    • /
    • pp.297-306
    • /
    • 2021
  • In this study, basic strategies for the decommissioning and site remediation of the Fukushima Daiichi Nuclear Power Station (FDNPS) were investigated. Six scenarios were formulated based on two of the three decommissioning strategies of nuclear power plants defined by the International Atomic Energy Agency (IAEA): immediate dismantling and deferred dismantling. A multicriteria decision analysis was performed to analyze the preferences of the options from the viewpoints of the timeframe to complete decommissioning, the resulting waste, the site usability, and the availability of the radioactive waste disposal route. The same six scenarios were applied to both the FDNPS and the nuclear power plants that ceased operation after a normal plant life cycle for comparison. For the FDNPS, the decommissioning project involved fuel debris retrieval, dismantling, and site remediation. The analysis results suggest that the balance between the amount of waste and the time to achieve the end state may be one of the most critical factors to consider when planning the decommissioning and site remediation of the FDNPS.

리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 - (A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure -)

  • 강사일;황영규;김경래
    • 한국건설관리학회논문집
    • /
    • 제9권5호
    • /
    • pp.104-115
    • /
    • 2008
  • 현재 노후 공동주택의 노후화 된 성능을 개선하기 위해 재건축사업과 리모델링 사업을 시행하고 있다. 최근에는 재건축사업으로 인한 폐기물 발생, 자원낭비, 부동산투기 등의 문제점으로 인하여 리모델링사업이 부각되고 있다. 이에 따라 국내 노후 공동주택 리모델링사업이 점차 증가하는 추세이지만 사례를 살펴보면 공사 시 리모델링의 특성을 고려하지 않은 공정계획을 사용하여 일부 공종에서 공사기간이 지연되고 있다. 특히 철거공사의 경우 리모델링의 특성을 반영한 철거공사의 공정계획을 적용하지 못하여 철거공사기간이 지연되고 있다. 리모델링사업에서 철거공사는 다른 공정에 선행하기 때문에 철거공사기간이 지연될 경우 전체 공사기간이 지연되며, 계획공사기간을 맞추기 위해 돌관공사를 할 경우 리모델링사업비도 증가하게 된다. 더욱이 현재까지 완료된 노후 공동주택 리모델링사업은 라멘(보 기둥)조 공동주택을 대상으로 하였으나 향후 리모델링이 필요한 공동주택은 대부분 철거공사의 물량이 많은 벽식구조이므로 철거공사기간이 지연될 가능성이 크다. 이에 본 논문은 벽식구조 노후공동주택 리모델링 철거공사의 공기지연을 방지하기 위해서 리모델링의 특성을 반영한 철거공사의 공정계획을 수립하고자 한다.

연구로 2호기 동위원소생산시설 해체활동 평가 (Evaluation on the Dismantling Activities of the KRR-2 Radioisotope Production Facilities)

  • 박승국;천은영;박진호
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2003년도 가을 학술논문집
    • /
    • pp.671-675
    • /
    • 2003
  • 연구로 1,2호기 해체 사업이 본격적으로 착수하게 됨에 따라 2001년 8월부터 2002년 12월까지 연구로 2호기 부속시설인 동위원소 생산시설을 제염 및 해체하였다. 이 시설은 동위원소 생산용 콘크리트 핫셀, 납 핫셀 및 실험실로 구성되어 있다. 제염ㆍ해체의 대상물은 흄후드, 실험대, 씽크 및 오염된 내부 시설물이다. 안전한 해체 활동을 위해서 각종 지침서 및 절차서가 수립되었다. 해체 활동을 위해 총 20,933 man-hour의 인력이 소요되었고, 드릴링 머신 등 여러 장비가 투입되었다. 실험실에서의 최대 오염도는 유리성 오염도가 $\beta$ : 9.24 Bq/$\textrm{cm}^2$이였고, 고착성 오염도는 350,000 cpm이였다. 해체폐기물은 콘크리트류, 목재류 및 철재류 등으로 총 62.146 Ton이고, 작업자들의 피폭량은 0.33 mam-mSv로 나타났다.

  • PDF

성격 유형을 바탕으로 하는 에이전트 기반 팀 해체 모형 (An Agent-Based Model of Team Dissolution based on Personality Traits)

  • 이성룡
    • 디지털융복합연구
    • /
    • 제16권1호
    • /
    • pp.317-325
    • /
    • 2018
  • 팀 활동은 학생들의 문제해결 능력 배양과 팀워크의 학습을 위해 유용하다. 팀 활동이 좋은 결과로 마무리되는 것은 학생들의 성공경험 획득을 위해 중요한데, 특히 융 복합 교과에서는 더욱 그러하다. 본 연구에서는 대학 교과에서의 팀 활동에 있어 주어진 프로젝트 기한이 만료되기 전에 팀이 해체되는 경우에 대해 분석하고자 하였다. 팀의 해체가 팀원의 성격에 바탕을 두고 있다는 가정 하에 팀 해체의 요인이 되는 성격으로서 Dark Triad(DT)를 도입하였고 이를 방어하는 성격 요소로서 융화성을 도입하여 팀 해체 모형을 제안하였다. 제안된 모형은 에이전트 기반의 시뮬레이션을 통해 모의실험을 하였고 그 결과를 분석하였다. DT를 소유한 학생의 비율은 팀의 제한 인원과 팀의 해체율에 영향을 미치지만 팀원의 융화성을 높임으로 인해 팀의 해체율을 낮출 수 있음이 확인되었다. 개발한 모형은 팀의 해체와 관련된 연구에 기초로 제공될 수 있으며 팀 활동을 에이전트 기반의 시뮬레이션으로 접근한 방법론의 활용은 향후 팀 활동을 분석하고 지원하는데 유용하리라 기대한다.