• Title/Summary/Keyword: Discharged Materials

Search Result 187, Processing Time 0.029 seconds

Semidiurnal Tidal Variation in Water Quality in Asan Bay during four Seasons (계절별로 조사한 조석에 따른 아산만의 수질 변동)

  • Kim, Se Hee;Shin, Yong Sik
    • Journal of Marine Life Science
    • /
    • v.5 no.1
    • /
    • pp.25-33
    • /
    • 2020
  • The Asan Bay, which has semi-diurnal tide with macro-tidal range, is affected by both freshwater discharge from the sluice gates in the sea dikes and tidal seawater inputs from the Yellow sea. Understanding water quality change in response to tides is important since tides can impact the short-term variations in physical and chemical water properties as well as the response of biological properties. The diel variations in water quality were seasonally investigated at 2 hour intervals from a fixed station in the Asan Bay. In the results, water temperature and salinity consistently fluctuated in phase or out of phase with tidal height. Especially salinity was positively correlated with tidal height. The concentrations of total suspended solids were higher in the bottom water than in the surface and fluctuated greatly over the tidal cycle recording higher values at low tide than at high tide. Nitrite+nitrate levels also fluctuated out of phase with tidal height and correlated negatively with tidal height. Other nutrients also showed a similar pattern. The pattern was distinct in July when freshwater was discharged before the field sampling. The concentrations of organic materials, total nitrogen and total phosphorus greatly fluctuated over the tidal cycle and were generally out of phase with tidal height. Most materials except particulate organic forms were correlated with salinity indicating that freshwater inputs were sources for the materials similarly to the dissolved inorganic nutrients. The results suggest that water quality (except dissolved oxygen and pH) and nutrients including organic materials was largely affected by tides in the Asan Bay.

Maximum Value Calculation of High Dose Radioiodine Therapy Room (고용량 방사성옥소 치료 병실의 최대치 산출)

  • Lee, Kyung-Jae;Cho, Hyun-Duck;Ko, Kil-Man;Park, Young-Jae;Lee, In-Won
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.14 no.1
    • /
    • pp.28-34
    • /
    • 2010
  • Purpose: According to increment of thyroid cancer recently, patients of high dose radioiodine therapy were accumulated. Taking into consideration the acceptance capability in the current facility, this study is to calculate the maximum value of high dose radioiodine therapy in patients for treatment. Materials and Methods: The amount and radioactivity of waste water discharged from high dose radioiodine therapy in patients admitted at present hospital as well as the radiation density of the air released into the atmosphere from the high dose radioiodine therapy ward were measured. When the calculated waste water's radiation and its density in the released air satisfies the standard (management standard for discharge into water supply 30 Bq/L, management standard for release into air 3 $Bq/m^3$) set by the Ministry of Education, Science and Technology, the maximum value of treatable high dose radioiodine therapy in patients was calculated. Results: When we calculated in a conservative view, the average density of radiation of waste water discharged from treating high dose radioiodine therapy one patient was 8 MBq/L and after 117 days of diminution in the water-purifier tank, it was 29.5 Bq/L. Also, the average density of radiation of waste water discharged from treating high dose radioiodine therapy two patients was 16 MBq/L and after 70 days of diminution in the water-purifier tank, it was 29.7 Bq/L. Under the same conditions, the density of radiation released into air through RI Ventilation Filter from the radioiodine therapy ward was 0.38 $Bq/m^3$. Conclusion: The maximum value of high dose radioiodine therapy in patients that can be treated within the acceptance capability was calculated and applied to the current facility, and if double rooms are managed by improving the ward structure, it would be possible to reduce the accumulated treatment waiting period for radioiodine therapy in patients.

  • PDF

Recycle Possibility of the Stone-Dust in Quarry as Subbase Layer Materials of the Road (도로 보조기층재로서 채석장 석분토의 재활용가능성 분석)

  • Kim, Kyeong-Su;Song, Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.279-287
    • /
    • 2007
  • An ore of stone obtained from quarry lose its about 60% such as the muck and the stone-dust during the process of making the architectural block, the crushed aggregate and so on. A part of the muck is only reutilized for the crushed aggregate as road pavement materials, while the most of the muck in the shape of powder is mixed with water and then it is deposited in a sludge tank. The muck in the shape of powder is called the stone-dust. If the stone-dust is discharged and sprayed, an ecosystem will have terrible damage because the seepage of surface water, the flow of ground water and the movement of air are not occurred smoothly by packing the void of soils. As the Waste Management Law (2003) in Korea, the stone-dust is sorted out the industrial waste and the most of that is dumped in ground. Therefore, the establishments of an efficient recycling plan are necessary through the improvement of engineering properties of the stone-dust. To investigate the possibility of recycle and improvement for the stone-dust, the stone-dust and natural soils are sampled from six quarries in Korea. The various soil tests are performed by use of the mixed soils with the stone-dust content ratio. As the result of various soil tests, the recycle possibility of the stone-dust is analyzed as subbase layer materials of the roads.

A Study on the Forming Technology of Multi-stage Aircell Filling Valves (다단 에어셀 충진 밸브성형기술에 관한 연구)

  • Kim, Mi-Suk;Park, Dong-Sam
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.57-64
    • /
    • 2017
  • Today, due to the environmental regulations regarding air pollution in the EU, the use of EPS (Styrofoam) as the cushioning material in the packaging industry is decreasing. In effect, air cushioning based cushioning materials are rapidly expanding into the market and replacing EPS, due to their excellent buffering ability and environmental friendliness. This is a new selective filling type air filling material manufacturing technology that affords improvements in the amount of raw materials required, its processing and its aesthetic appearance compared to the conventional air filling cushioning materials. In this study, a multi-stage air cell filling valve molding technology is developed based on selective filling technology, which allows packages to be selectively filled in various forms by applying valve forming structure technology. This multi-stage air cell filling valve molding technology is a technique in which a plurality of injection ports are formed by laminating three layers of films, viz. a first injection film, a valve film, and a second injection film having valve ends. In the conventional technology, a separate external air injection path for injecting air into a plurality of connected air bags is needed. However, in the proposed system, an external air injection path is formed inside the air bag, Due to the lack of need for an injection furnace, the raw material and process are reduced and air is injected and then discharged, while the air bag is reduced in length to 63 ~ 66% of its normal value. The outer surface of the outer air injection path is integrated inside by maintaining the original length of the cross section, while the unnecessary folded air is injected into the interior of the air bag, This smart air filling type cushioning material manufacturing technology constitutes a big improvement over the existing technologies.

Geochemistry and Mineralogy of Mine Drainage Water Precipitate and Evaporite Minerals in the Hwasoon Area (화순 폐탄광지역 광산배수와 침전 및 증발잔류광물에 대한 지구화학적 및 광물학적 연구)

  • 박천영;정연중;강지성
    • Economic and Environmental Geology
    • /
    • v.33 no.5
    • /
    • pp.391-404
    • /
    • 2000
  • This study investigated the geochemical characteristics of mine drainage discharged from an abandoned coal mine in the Hwasoon area. Surface water samples were collected from 23 locations along the Hancheon creek. The concentration of Zn and Cu in stream waters was highest at low pH (3.53), whereas the content of TDS and TDI was highest at high pH (7.78) due to the concentration of Ca, $HCO_3$ and $SO_4$. At the upstream site, the Ba, Fe, Mn, Zn, and $SO_4$ contents were relatively high but decreased significantly with the distance from the coal mine. On the contrary, the Na and $NO_3$ contents were low at the upstream site but increased downstream. Yellow precipitate material collected in the Hancheon consisted mainly of iron and LOI. This yellow precipitate was heated from 100 to $900^{\circ}C$ for 1 hour. With increasing temperature, the intensity of hematite peaks were sharply produced in X-ray pattern and the absorption band Fe-O of hematite increased in IR due to dehydration and melting. The yellow to brown precipitate and evaporite materials were collected by a air-dry from the acid mine water at the laboratory. After drying, the concentration of ions in the acid water samples increased progressively in oversaturation with respect to either gypsum, ferrohexahydrite or quenstedetite. The X-ray powder diffraction studies identified that the precipitated and evaporated materials after drying were well crystallized gypsum, ferrohexahydrite and quenstedetite. Diagnostic peaks used for identification of gypsum were the 7.65, 4.28, 3.03, 2.87 and 2.48$\AA$ peaks and those for ferrohexahydrite were the 5.46, 5.12, 4.89, 4.44, 4.05, 3.62, 3.46, 3.40, 3.20, 3.03, 2.94, 2.53, 2.28, 2.07, 1.88 and 1.86${\AA} peaks. The IR spectra with OH-stretching, deformation of $H_2O$and ${SO_4}^{2-}$stretching vibration include the existence of gypsum, ferrohexahydrite and quenstedetite in the precipitated and evaporite materials. In the SEM and EDS analysis for the evaporite material, gypsum with well-crystallized, acicular, and columnar form was distinctly observed.

  • PDF

Non-exposure Simple Suturing Endoscopic Full-thickness Resection with Sentinel Basin Dissection in Patients with Early Gastric Cancer: the SENORITA 3 Pilot Study

  • Eom, Bang Wool;Kim, Chan Gyoo;Kook, Myeong-Cherl;Yoon, Hong Man;Ryu, Keun Won;Kim, Young-Woo;Rho, Ji Yoon;Kim, Young-Il;Lee, Jong Yeul;Choi, Il Ju
    • Journal of Gastric Cancer
    • /
    • v.20 no.3
    • /
    • pp.245-255
    • /
    • 2020
  • Purpose: Recently, non-exposure simple suturing endoscopic full-thickness resection (NESS-EFTR) was developed to prevent tumor exposure to the peritoneal cavity. This study aimed to evaluate the feasibility of NESS-EFTR with sentinel basin dissection for early gastric cancer (EGC). Materials and Methods: This was the prospective SENORITA 3 pilot. From July 2017 to January 2018, 20 patients with EGC smaller than 3 cm without an absolute indication for endoscopic submucosal dissection were enrolled. The sentinel basin was detected using Tc99m-phytate and indocyanine green, and the NESS-EFTR procedure was performed when all sentinel basin nodes were tumor-free on frozen pathologic examination. We evaluated the complete resection and intraoperative perforation rates as well as the incidence of postoperative complications. Results: Among the 20 enrolled patients, one dropped out due to large tumor size, while another underwent conventional laparoscopic gastrectomy due to metastatic sentinel lymph nodes. All NESS-EFTR procedures were performed in 17 of the 18 other patients (94.4%) without conversion, and the complete resection rate was 83.3% (15/18). The intraoperative perforation rate was 27.8% (5/18), and endoscopic clipping or laparoscopic suturing or stapling was performed at the perforation site. There was one case of postoperative complications treated with endoscopic clipping; the others were discharged without any event. Conclusions: NESS-EFTR with sentinel basin dissection is a technically challenging procedure that obtains safe margins, prevents intraoperative perforation, and may be a treatment option for EGC after additional experience.

Discharged Maximum Current Density of Vanadium Redox Flow Battery with Increased Electrolyte Flow Rate (바나듐계 산화-환원 유동 전지의 최대 방전전류와 유량의 상관성에 대한 실험적 연구)

  • Kim, Jung Myoung;Park, Hee Sung
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.40 no.12
    • /
    • pp.777-784
    • /
    • 2016
  • All-vanadium redox flow batteries (VRFBs) are used as energy storage systems for multiple intermittent power sources. The performance of the VRFBs depends on the materials and operating conditions. Hence, performance characterization is of great importance in the development of the VRFBs. This paper proposes a method for determining the maximum current density based on stoichiometric ratios. A laboratory-scaled VRFB with a projected electrode area of $25cm^2$ is electrically charged when the state of the charge has begun from 0.6. The operating conditions, such as current density and volumetric flow rate are important in the test, and the maximum current density is influenced by the mass transfer coefficient. The results show that increasing the electrolyte flow rate from 5 mL/min to 60 mL/min enhances the maximum current density up to $520mA/cm^2$.

A study on the Separation of Acetic Acid, Nitric Acid and Hydrofluoric Acid from Waste Etching Solution of Si Wafer Manufacturing Process (Silicon wafer 에칭공정시 발생(發生)되는 폐(廢)에칭액 으로부터 초산(醋酸), 질산(窒酸) 및 불산(弗酸)의 분리.회수(分離.回收)에 관한 연구(硏究))

  • Kim, Jun-Young;Lee, Hyang-Sook;Shin, Chang-Hoon;Kim, Ju-Yup;Kim, Hyun-Sang;Ahn, Jae-Woo
    • Resources Recycling
    • /
    • v.16 no.1 s.75
    • /
    • pp.59-67
    • /
    • 2007
  • Recovery of acids from the waste etching solution of containing acetic, nitric and hydrofluoric acid discharged from silicon wafer manufacturing process has been attempted by using solvent extraction method. EHA(2-Ethylhexlalcohol) for acetic acid and TBP(Tri-butly Phosphate) for nitric and hydrofluoric acid as a extraction agent was used to the experiment to obtain the process design data in separation procedure. From the experimental data and McCabe-Thiele diagram analysis, we obtained the optimum conditions of phase ratio(O/A) and stages to separate each acid sequently from the mixed acids. The recovery yield was obtained above 90% for acetic acid from the acid mixtures, 90% for nitric acid from acetic acid extraction raffinate and then above 67% for hydrofluoric acid from final extraction raffinate.

Results of Microsurgical Anterolateral Tunnel Approach for Cervical Disc Herniation (경추간판탈출증에 대한 미세 전측방 Tunnel Approach의 결과)

  • Jang, Woo-Young;Kim, Keun-Soo;Lee, Jung-Chung;Kim, Chul-Jin;Choi, Ha-Young;Xuan, Xiu-Nan;Han, Dong-Han
    • Journal of Korean Neurosurgical Society
    • /
    • v.30 no.5
    • /
    • pp.600-604
    • /
    • 2001
  • Objective : The authors report the microsurgical anterolateral tunnel approach for the treatment of the cervical disc diseases and its postoperative surgical results. Methods : All surgical procedures followed the method of classical microsurgical anterior discectomy. Small tunnel(7-8mm) was made on the disc space reaching to the posterior longitudinal ligament. The disc materials and bony spurs were removed through this tunnel. Thirty-one patients of cervical disc herniation(24 cases with pure disc herniation, 7 cases with combined cervical spondylosis) were evaluated on the symptoms, conformation in plain X-ray, C-T, and MRI. The follow up time was over 2 years. Results : Postoperatively the result(following the out come scale) was excellent and good in Twenty-nine patients. One with fair result showed remnant disc particle and spur and another one is combined with cord contusion. One patient with lesion in C 3-4 space and two cervicothoracic junction showed excellent result. Two patients with osteoporosis also showed good results. Cervical spine curvature and disc space height were not changed on the plain X-ray and MRI in all patients. Twenty-nine patients were discharged within 3 days after surgery without any postoperative complications. Conclusions : The microsurgical anterolateral tunnel approach could be indicated for the treatment of patients with cervical disc diseases and with difficulty in achieving interbody fusion(the higher cervical level and cervicothoracic junction, osteoporosis etc.).

  • PDF

Endoscopic Third Ventriculostomy for Adult Aqueduct Stenosis : Double Fenestration - A Case Report and Technical Note - (성인 수도관 폐쇄증에 대한 내시경적 제3뇌실 누공술 : 이중개창술 - 증례보고 및 수술수기 -)

  • Shim, Yong-Jin;Ha, Ho-Gyun;Jung, Ho;Kim, Yong-Seog;Park, Moon-Sun
    • Journal of Korean Neurosurgical Society
    • /
    • v.29 no.8
    • /
    • pp.1019-1023
    • /
    • 2000
  • Objective : Endoscopic third ventriculostomy is gaining popularity as a minimally invasive surgical option for certain types of hydrocephalus as an alternative to shunting. The authors have tried to fenestrate down to the subdural space passing through the prepontine cistern to lessen or avoid the chance of redoing due to healing. Materials and Method : A 48-year-old male patient with several years of intractable headache was presented. Magnetic Resonance Image(MRI) of the brain revealed marked ventricular dilatation with stenotic cerebral aqueduct. A 2.3mm flexible steerable endoscope($Neuroview^{(R)}$) was introduced via precoronal route and accessed to the third ventricular floor. Using 3-French Fogarty balloon catheter, thin third ventricular floor and the arachnoid membrane of the prepontine cistern were fenestrated, so called "double fenestration". To confirm the fenestration, subdural compa-rtment of the left abducens nerve was identified during the procedure. Forceful pulsating flow through the orifice convinced the patency of the opening. Results : The patient was discharged on the third postoperative day without any postoperative complications. The postoperative follow-up MRI of the brain, at second and sixth months, clearly demonstrated the flow void through the third ventricular floor. Conclusions : Endoscopic third ventriculostomy was successfully performed on an adult hydrocephalus patient with aqueduct stenosis. The third ventricular floor and arachnoid membrane of the prepontine cistern were fenestrated to achieve double fenestration to minimize the chance for failure. The details of this procedure and results are described.

  • PDF