• 제목/요약/키워드: Discharge method

검색결과 3,024건 처리시간 0.03초

HEC-1 모형의 유역특성변화에 따른 설계 홍수량의 비교 분석 (Anlaysis of Design flood in a relation to Changing Characteristics of Area by using HEC-1 Model)

  • 김선주;김필식
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
    • /
    • pp.537-543
    • /
    • 1999
  • While there are to estimating design discharge , we are in trouble with how to separate area, Because discharges will be different depending on the shape of area even though there are same size of area . This study is for a reasonable presentation of design discharge method where there are changing characteristcs of area with SCS and Clark theory by sung HEC-1 Model. While we were Estimating desgin discharge with separating area in a relation to Time of Concentration(Tc) with SCS , Clark method, we found that if there are no variation of Tc the value of a discharge is not changed where shapes of area are different though. And from the result of analysis with SCS and Clark method, we ascertained that discharge by the SCS method was more bigger than that of the Clark where Area is less than 100ha. On the other hand, Clark method is more bigger in the more 1000ha.

  • PDF

혼성 유체-입자(몬테칼로)법을 이용한 유사스파크 방전의 기동 특성 해석 (Analysis on the lgnition Charac teristics of Pseudospark Discharge Using Hybrid Fluid-Particle(Monte Carlo) Method)

  • 심재학;주홍진;강형부
    • 한국전기전자재료학회논문지
    • /
    • 제11권7호
    • /
    • pp.571-580
    • /
    • 1998
  • The numerical model that can describe the ignition of pseudospark discharge using hybrid fluid-particle(Monte Carlo )method has been developed. This model consists of the fluid expression for transport of electrons and ions and Poisson's equation in the electric field. The fluid equation determines the spatiotemporal dependence of charged particle densities and the ionization source term is computed using the Monte carlo method. This model has been used to study the evolution of a discharge in Argon at 0.5 torr, with an applied voltage if 1kV. The evolution process of the discharge has been divided into four phases along the potential distribution : (1) Townsend discharge, (2) plasma formation, (3) onset of hollow cathode effect, (4) plasma expansion. From the numerical results, the physical mechanisms that lead to the rapid rise in current associated with the onset of pseudospark could be identified.

  • PDF

자연하천에서 무차원 유속분포-지표유속법을 이용한 유량산정 (Discharge Estimation Using Non-dimensional Velocity Distribution and Index-Velocity Method in Natural Rivers)

  • 김창완;이민호;정성원;유동훈
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.855-859
    • /
    • 2007
  • It is essential to obtain accurate and highly reliable streamflow data for water resources planning, evaluation and management as well as design of hydraulic structures. A new discharge estimation method, which is named 'non-dimensional velocity distribution and index-velocity method,' was proposed in this research. This method showed very close channel discharges which were calculated with the exiting velocity-area method. When velocity-area method is used to estimate channel discharge, it is required to observe point velocities at every desired point and vertical using a current meter like Price-AA. However 'non-dimensional velocity distribution and index-velocity method' is used, it become optional to observe point velocities at every desired point and vertical. But this method can not be applied for the cases of very complex and strongly asymmetric channel cross-sections because non-dimensional velocity distribution by entropy concept may be quite biased from that of natural rivers.

  • PDF

방전 시간 밸런싱을 사용한 배터리 교대 방전 기법 (Alternating Battery Discharge Method Using Discharge Time Balancing)

  • 이종배;이성수
    • 전기전자학회논문지
    • /
    • 제19권3호
    • /
    • pp.366-370
    • /
    • 2015
  • 본 논문에서는 배터리 교대 방전 기법에서 배터리 셀의 방전 시간을 밸런싱함으로서 배터리 사용 시간을 크게 높이는 방법을 제안한다. 기존 기법에서는 다수의 배터리 셀을 교대로 방전시킴으로서 배터리에 회복 효과를 발생시키고, 이를 통해 배터리 사용 시간을 연장한다. 이때, 시스템에 공급되는 전원이 차단되지 않도록 배터리 셀이 동시에 켜지는 시간 구간이 있는데, 배터리 셀의 전압 차이로 인해 여러 가지 문제가 발생한다. 이러한 문제를 해결하기 위해서 배터리 셀이 가능한 한 균등한 전압을 가지도록 배터리의 방전 시간을 제어한다. 실험 결과, 제안하는 방법에서 배터리 사용 시간이 19.2% 연장되었다.

전극의 3차원 측정데이터로부터 방전가공조건 결정 (Determination of Electrical Discharge Machining Parameters from the CMM data of a Electrode)

  • 주상윤
    • 한국생산제조학회지
    • /
    • 제9권5호
    • /
    • pp.58-64
    • /
    • 2000
  • This paper proposes a method for determining optimal EDM parameters based on discharge area from the physical model of a tool electrode. Main parameters, which affect the EDM performance, are peak value of currents, pulse-on time, and pulse-off time. Such parameters are closely dependent on the discharge area in EDM process. In this paper the discharge area is estimated from the CMM scanning data to the tool electrode. The method is very useful when any geometric information to the tool electrode is not provided from tool modeler or producer. The method consists of following four steps. First a triangulation mesh is constructed from the CMM data. Secondly, the z-map is modeled from the triangulated mesh. Thirdly, the discharge area is estimated from intersection between the z-map model and a z-height plane. Finally, the machining parameters are easily calculated by some known EDM equations to the discharge area. An example is introduced to show that the machining parameters are calculated from the CMM data to a tool electrode.

  • PDF

유량측정방법에 따른 형산강유량의 불확실도 분석 (Uncertainty Analysis of Hyung San River Discharge due to the methods of Discharge Measurement)

  • 서규우;김수현;김대곤
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.1538-1542
    • /
    • 2005
  • This study is to secure more accurate data of the discharge on the measurement by gaining a reliable hydrological data through the comparison the present method of measuring them and the other way that is based ISO. This study suggests the applicable measurement method of the discharge that has reliance through general elements and the analysis of uncertainty by comparing and assaying the data of the Hyung San River that is measured by the present standard. The result of this study makes us realize that we should complement the measurement method of the discharge securing the reliable and accurate hydrological data Hydrological data is very important things to perform domestic river works or install some structure in river or coast. Securing reliable and accurate hydro-data and making a thesis should go on in other to do any construction in river or coast.

  • PDF

Carbon Nanotube Synthesis using Magnetic Null Discharge Plasma Production Technology

  • Sung, Youl-Moon
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권4호
    • /
    • pp.532-536
    • /
    • 2007
  • Carbon nanotube (CNT) properties, produced using a magnetic null discharge (MND) plasma production technology, were investigated. We firstly deposited the Fe layer 200 nm in thickness on Si substrate by the magnetic null discharge sputter method at the substrate temperature of $300도C$, and then prepared CNTs on the catalyst layer by using the magnetic null discharge (MND) based CVD method. CNTs were deposited in a gas mixture of CH4 and N2 at a total pressure of 1 Torr by the MND-CVD method. The substrate temperature and the RF power were $650^{\circ}C$ and 600W, respectively. The characterization data indicated that the proposed source could synthesize CNTs even under relatively severe conditions for the magnetic null discharge formation.

인공지능기법을 이용한 일유출량의 추계학적 비선형해석 (A Stochastic Nonlinear Analysis of Daily Runoff Discharge Using Artificial Intelligence Technique)

  • 안승섭;김성원
    • 한국농공학회지
    • /
    • 제39권6호
    • /
    • pp.54-66
    • /
    • 1997
  • The objectives of this study is to introduce and apply neural network theory to real hydrologic systems for stochastic nonlinear predicting of daily runoff discharge in the river catchment. Back propagation algorithm of neural network model is applied for the estimation of daily stochastic runoff discharge using historical daily rainfall and observed runoff discharge. For the fitness and efficiency analysis of models, the statistical analysis is carried out between observed discharge and predicted discharge in the chosen runoff periods. As the result of statistical analysis, method 3 which has much processing elements of input layer is more prominent model than other models(method 1, method 2) in this study.Therefore, on the basis of this study, further research activities are needed for the development of neural network algorithm for the flood prediction including real-time forecasting and for the optimal operation system of dams and so forth.

  • PDF

수력기 운전제약을 고려한 저수지식댐의 효과적인 사용수량 결정에 관한 연구 (Effective Method of determining the Water Discharge of a Pondage I considering Operating Constraint)

  • 전동훈;남재현;박시우
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.784-786
    • /
    • 1997
  • In this Paper, the effective method of determining the water discharge of a pondage hydro-unit for hydro dispatch is proposed. The water discharge of a pondage hydro-unit can be determined subtracting the spillage discharge from summation of the inflow and the pondage according to variation of the water level of the reservoir. Proposed method calculates the inflow using the duration curve, the water level from initial level on January 1, and the spillage discharge from the water discharge.

  • PDF

GIS 부분방전 신호와 도착 시간차 분석을 통한 PD발생 위치 추적 (Partial Discharge Position Tracking Method using a GIS Partial Discharge Signal and Arrival Time Difference)

  • 최문규;차한주
    • 전기학회논문지
    • /
    • 제62권9호
    • /
    • pp.1297-1301
    • /
    • 2013
  • This paper analyzes of PD occurrence position through an analysis of the arrival time difference between the GIS partial discharge signal. Because of GIS (Gas Insulated Switchgear) is a facility very important power equipment and as part of the equipment that make up the power system, the stabilization of the power industry, which accounted for 88.5% share of GIS substation in the form of a substation is an important equipment for power supply. In the situation where we are gradually expanding the need for preventive diagnosis in order to improve the efficiency of equipment management and failure prevention for Preventive diagnosis. In this paper as a method for extracting pre-defect of failure of GIS Apply the average value method of calculating the 5 times each using a pulse of the first time of the second pulse (${\Delta}t$) with an oscilloscope generation position PD(Partial Discharge). the results of GIS internal inspection, the partial discharge of the actual the position of the partial discharge was confirmed with an accuracy of about 82% of positions. Arrival time difference in the most effective manner if the partial discharge of GIS internal occurs by applying the averaging method and TOA(Time of arrival) method, the partial discharge occurs you through the measurement and analysis of PD signal occurs was confirmed in the experiment are presented and diagnostic methods location tracking.