• Title/Summary/Keyword: Development Progress

Search Result 2,912, Processing Time 0.036 seconds

Mathematical Modelling of Degree of Hydration and Adiabatic Temperature Rise (콘크리트의 수화도 및 단열온도상승량 예측모델 개발)

  • 오병환;차수원;신경준;하재담;김기수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.883-887
    • /
    • 1998
  • Hydration is the main reason for the growth of the material properties. A exact parameter to control the chemical and physical process is not the time, but the degree of hydration. Therefore, it is reasonable that development all material properties should be formulated in terms of degree of hydration. Mathematical formulation of degree of hydration is based on combination of reaction rate functions. The effect of moisture conditions as well as temperature on the rate of reaction is considered in the degree of hydration model. This effect is subdivided into two contributions: water shortage and water distribution. The former is associated with the effect of on the progress of hydration. The water needed for progress of hydration do not exist and there is not enough space for the reaction products to form. The latter is associated with the effect of free capillary water distribution in the pore system. Physically absorption layer does not contribute to progress of hydration and only free water is available for further hydration.

  • PDF

Progress in Si crystal and wafer technologies

  • Tsuya, Hideki
    • Journal of the Korean Crystal Growth and Crystal Technology
    • /
    • v.10 no.1
    • /
    • pp.13-16
    • /
    • 2000
  • Progress in Si crystal and wafer technologies is discussed on single crystal growth, wafer fabrication, epitaxial growth, gettering, 300 mm and SOI. As for bulk crystal growth, the mechanism of grown-in defects (voids) formation, the succes of grown-in defect free crystal growth technology and nitrogen doped crystal are shown. New wafer fabrication technologies such as both-side mirror polishing and etchingless process have been developed. The epitaxial growth of SiGe/Si heterostructure for high speed bipolar device is treated. Gettering technology under low temperature process such as RTP is important, and also it is shown that IG effect for Ni could be predicted using computer simulation of precipitate density and size. The development of 300 mm wafer and SOI has made progress steadily.

  • PDF

Knowledge-Based Model for Forecasting Percentage Progress Costs

  • Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.518-527
    • /
    • 2012
  • This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

A MONITORING METHOD OF PROJECT PROGRESS WITH RFID TECHNOLOGY

  • Soungho Chae ; Naruo Kano
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.491-496
    • /
    • 2005
  • In this paper, the authors explained the overview of a method for detecting location of worker for development of a monitoring system for project progress management using RFID technology. Data is the RSSI (Receive Signal Strength Indication) from RFID tag attached to the worker installing a rolling shutter, and was obtained from antennas and RFID readers set around the construction site. Neural network was done using RSSI collected and the area where worker is performing a task, and an estimation model of the working area was prepared. The network had a range of the percentage of correctly classified from 62% to 92%. The authors suggested the method to make estimate by using integrated networks prepared in respect of RFID readers, and showed the percentage of correctly classified of 84.3%. According to the result, the authors confirmed the possibility of the monitoring system with RFID technology, and mentioned the factors necessary to develop for further practical use.

  • PDF

A Study on Research and Development Strategies for Measuring Instrument (계측기기 연구개발 전략에 관한 연구)

  • 최만용
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.1
    • /
    • pp.109-114
    • /
    • 1997
  • In the past few decades, the measuring instrument industries have made rapid progress with increase on the demand in industries such as precision instrument, chemistry, electronics, industrial measurement and automobile. Thus, development strategy and technical advancement are required for both securing the competitiveness on products in the world market and industrial development. Intensifying competitiveness of measuring instrument is needed in the world market. It can be achieved by development of measuring instrument holding comparative priority. A development strategy should be drawn up in the long-term point of view for coping with the increasing demand of measuring instrument and securing competitiveness in the world market.

  • PDF

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Evaluation on R&D Progress for Manganese Nodule Development and Its Prospects (심해저 망간단괴 개발사업의 국제기술 동향 분석 및 향후 개발 전망)

  • Park, Se-Hun;Park, Seong-Wook;Kang, Gil-Mo
    • Ocean and Polar Research
    • /
    • v.27 no.4
    • /
    • pp.477-490
    • /
    • 2005
  • The development of manganese nodule mining technology is very important in order to secure a long-term and stable supply of rare strategic metals. In the twenty years following the R&D activities with the international consortia in the 1970s, studies on mining technologies have been carried out by several national projects in Korea. The current metal prices such as copper, nickel, cobalt, and manganese have been drastically changed since 2002. Rapid economic growth of Asian countries, especially China, have induced the situation. And the possibility of copper shortage is looming just around the comer. Because of the imbalance between production and consumption, copper is fundamentally the most threatened metal in the future in terms of potential metal shortage. Manganese nodules contain a considerable percentage of copper as the future metal resource. Therefore, it is necessary to concentrate our effects on developing these resources. This paper introduces our evaluation of R&D progress for the development of manganese nodules. The issue and role of manganese nodules during the difficult period of a potential future metal shortage period is discussed and its prospect outlined. Also, this paper tried to emphasize the necessity of continuous R&D efforts for the commercial development of such mineral resources.

Rice Insects : The Role of Host Plant Resistance in Integrated Management Systems

  • Heinrichs, E.A.
    • Korean journal of applied entomology
    • /
    • v.31 no.3
    • /
    • pp.256-275
    • /
    • 1992
  • Insects are among the most important abiotic and biotic constraints to rice production. National rice research programs are in various stages in the development and implementation of integrated pest management (IPM) stratagies for rice insect control. Among the various control tactics, insect resistant cultivars are sought as the major tactic in rice IPM. Through the activities of interdisciplinary teams of scientists significant progress has been made in the development and release of insect resistant cultivars to farmers. Because of its compatibility with other control tactics insect resistance has proven to fit well into the IPM approach to rice insect control agents and minimize the need for insecticide applications. The development of biotypes which overcome the resistance in rice plants has been a significant constraint in the breeding of rice for resistance to insects. Most notable examples in Asia are the green leafhopper, Nephotettix virescens, brown planthopper, Nilaparvata lygens and the Asian rice gall midge, Orseolia oryzae. The current breeding stratege is to develop rice cultivars with durable resistance on which virulent biotypes cannot adapt. In spite of the significant progress made in the breeding of insect resistant cultivars there are still numerous important rice insect species for which host plant resistance as a control tactic has not been fully utilized. Advances in biotechnology provide promise of solving some of the problems that have limited the use of host plant resistance as a major tactic in the integrated management of rice insect pests.

  • PDF