• Title/Summary/Keyword: Development Duration

Search Result 1,603, Processing Time 0.023 seconds

Segment and Word Duration Produced by Preschool Children (학령전기 아동의 분절음 및 단어 길이)

  • Kang, Eunyeong
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.8 no.4
    • /
    • pp.291-305
    • /
    • 2020
  • Purpose : The duration of speech segments reflects children's speech motor development. The purpose of this study was to determine whether segmental sound and word duration varies by age among preschool children. Methods : A total of 60 children aged 4~5 years participated in this study. Participants took the picture-naming test to produce single-word speech data. The duration of the consonant at the initial position of the word and the final position of the word, the voice onset time of plosive, the duration of the vowel following the initial consonant, and the duration of the word were measured. Results : As age increased, the duration of the initial consonant, the duration of the word, and the voice onset time decreased significantly. The main effects of age, manner of articulation, and place of articulation on the duration of the initial consonant were significant. The duration of consonants in the nasal sound and plosives and the duration of bilabial and alveolar sound differed significantly between groups. The main effects of age and vocal type on voice onset time were significant. The main effect of age on the duration of the consonant in the final position of word and on the duration of the vowel were not statistically significant. Conclusion : The results of this study showed that the duration of segmental sound and the word were associated with speech development between 4 and 5 years old. Accordingly, duration of the segmental sound and the word may serve as an acoustic cue as they reflect speech development and speech motor control maturity.

Association of Duration and Rate of Grain Filling with Grain Yield in Temperate Japonica Rice (Oryza sativa L.)

  • Yang, Woon-Ho;Park, Tae-Shik;Kwak, Kang-Su;Choi, Kyung-Jin;Oh, Min-Hyuk
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.52 no.1
    • /
    • pp.112-121
    • /
    • 2007
  • Grain filling is a crucial factor that determines grain yield in crops since it is the final process directly associated with crops' yield performance. Grain filling process can be characterized by the interaction of rate and duration of grain filling. This study was conducted, using 16 temperate japonica rice genotypes, with aims to (1) seek variations in grain filling duration and rate on area basis, (2) compare the contribution of grain filling duration and rate to grain yield, and (3) examine the influence of temperature and solar radiation for effective grain filling on grain yield in relation to grain filling duration and rate. Grain filling rate and duration exhibited highly significant variations in the ranges of $20.7{\sim}46.3\;g\;m^{-2}d^{-1}\;and\;11.2{\sim}35.5$ days, respectively, depending on rice genotypes. Grain yield on unit area basis was associated positively with grain filling duration but negatively with grain filling rate. Grain filling rate and duration were negatively correlated with each other. Final grain weight increased linearly with the rise in both cumulative mean temperature and cumulative solar radiation for effective grain filling. Higher cumulative mean temperature and cumulative solar radiation for effective grain filling were the results of longer grain filling duration, but not necessarily higher daily mean temperature and daily solar radiation for effective grain filling. Grain filling rate demonstrated an increasing tendency with the rise in daily mean temperature for effective grain filling but their relationship was not obviously clear. It was concluded that grain filling duration, which influenced cumulative mean temperature and cumulative solar radiation for effective grain filling, was the main factor that determined grain yield on unit area basis in temperate Japonica rice.

A Study of Development Schedule Estimation Based on Development Type (소프트웨어 개발형태 기반 개발기간 추정 연구)

  • Park Seok-Gyu;Kim Woon-Yong
    • Journal of the Korea Computer Industry Society
    • /
    • v.7 no.3
    • /
    • pp.191-198
    • /
    • 2006
  • Area of software measurement is active more than thirty years. There is a huge collection of researches but still no concrete software development effort, duration and cost estimation model. The data sets used to conduct previous studies in the duration estimation model are often small and not too recent, these types of models should not be apply in recent projects that have complex architecture and various development environment. Therefore, Oligny et al. presents empirical models that predict software project duration in accordance with project platform based on project effort using the log data transformation. These models are based on the analysis of 396 project data provided by release 4 of the ISBSG Benchmark. Applying Oligny et al.'s models to 534 project data provided release 6 of the ISBSG Benchmark, the project duration is affected by development type more than development platform. Therefore, This paper presents the model of duration estimation according to development type. This paper proves the duration is more affected by development type than development platform. And, The model according to development type is more adequate for duration estimation.

  • PDF

A Predictive Model for Software Development Team Size and Duration Based on Function Point (기능점수 기반 소프트웨어 개발팀 규모와 개발기간 예측 모델)

  • Park, Seok-Gyu;Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.10D no.7
    • /
    • pp.1127-1136
    • /
    • 2003
  • Estimation of software project cost, effort and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of models estimate the development effort using the function point that is measured from the requirement specification. This paper presents optimal team size and duration prediction based on function point in order to provide information that can be used as a guide in selecting the most Practical and productive team size for a software development project. We introduce to productive metrics and cost for decision criteria of ideal team size and duration. The experimental is based on the analysis of 300 development and enhancement software project data. These data sets are divide in two subgroups. One is a development project; the other is a maintenance project. As a result of evaluation by productivity and cost measured criteria in two subgroups, we come to the conclusion that the most successful projects has small teams and minimum duration. Also, I proposed that predictive model for team sire and duration according to function point size based on experimental results. The presented models gives a criteria for necessary team site and duration according to the software size.

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

Effects of IVM and IVF Duration on In Vitro Development and Cell Numbers of Embryos in Korean Native Cattle

  • Park Yong-Soo
    • Reproductive and Developmental Biology
    • /
    • v.28 no.4
    • /
    • pp.221-226
    • /
    • 2004
  • The present study was performed to investigate the effects of in vitro maturation (IVM) and in vitro fertilization (IVF) duration on the development of Korean Native Cattle embryos. The time of blastocyst formation and the quality of blastocysts based on cell numbers were examined. The cleavage rate increased with the length of IVF duration in the groups of 18-hr IVM, but was constant in the groups of 24-hr IVM. The development rate to the 8-cell stage was significantly higher in the IVM 18: IVF 20 group than in the IVM 24: IVF 24 group. The development rate to the blastocyst stage was highest in the IVM 18: IVF 20 group, significantly different from that of the IVM 18: IVF 16, IVM 24: IVF 20 and IVM 24: IVF 24 group. The time of blastocysts formation tended to be shorter when IVM and IVF duration were decreased. The number of inner cell mass, trophoblast and the total cells were significantly higher in the IVM 18: IVF 16 group than in the IVM 24: IVF 24 group (P<0.05). These results demonstrated that the IVM and IVF duration should be adequate for the efficient production of bovine embryos, and it might particularly be essential to determine the proper combination of IVM and IVF duration.

A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module (BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

A Study on the Development of Reflect Sunshine Duration Meter(I) (반사식 일조계 개발에 관한 연구(I))

  • 이부용;문승의
    • Journal of Environmental Science International
    • /
    • v.4 no.2
    • /
    • pp.117-120
    • /
    • 1995
  • The comparision of sunshine duration meter was carried out on the roof of Korea Meteorological Research Institude by comparing Pyrheliometer(Eppley NIP model) to sunshine duration meter(Reflection type) during from Nov. 8, 1989 to Feb. 19, 1990. In the observation Period, daily mean sunshine duration time difference of Jordan sunshine duration meter was recorded 0.47hour and Reflect sunshine duration meter was recorded 0.39hour. More than one hour time difference was observed 15 cases by Jordan sunshine duration meter and 11 cases by Reflect sunshine duration meter.

  • PDF

The Analysis of Channel Characteristics on Downtown of Daejeon for K Band Satellite Communication (대전 도심지의 K 대역 위성통신 채널특성 분석)

  • Kwon, Kun-Sup;Heo, Jong-Wan;Hwang, Ki-Min;Lim, Chul-Min;Ryu, Heung-Gyoon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.17 no.5
    • /
    • pp.620-628
    • /
    • 2014
  • This paper describes the analysis results of channel characteristics in the operating area of satellite OTM (On-The-Move) terminal. The communication channel between the Koreasat-5 and OTM terminal on a test car was measured and recorded in downtown of Daejeon, using the received beacon signal of around 20 GHz. And the measurement data were statistically analyzed and then compared with highway and national road environments. The statistical evaluation of satellite channel was conducted by using probability density function and Markov model and then presented average connection duration(ACD), average fade duration(AFD), and level crossing rate(LCR) of downtown environment.

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF