• Title/Summary/Keyword: Development Costs

Search Result 2,218, Processing Time 0.03 seconds

Development of the DRG Fee Adjustment Mechanism Reflecting Nurse Staffing Grades (간호관리료 차등제를 반영한 DRG수가 조정기전 개발)

  • Kim, Yunmi;Kim, Se Young;Kim, Jiyun
    • Journal of Korean Clinical Nursing Research
    • /
    • v.19 no.3
    • /
    • pp.321-332
    • /
    • 2013
  • Purpose: Korean health insurance extended application of the Diagnosis Related Groups (DRG) payment system to tertiary and general hospitals from July, 2013. This study was done to develop a DRG fee adjustment mechanism applied to levels of nurse staffing to assure quality nursing service. Methods: Nurse stafffing grades among hospitals in Korea were analyzed. Differences and ratio of inpatient costs by nurse staffing grades in DRG fees and differences of DRG fee between tertiary and general hospitals were compared. Results: In 2013, nurse staffing grades in tertiary and general hospitals had improved, but other hospital nurse staffing grades remained at the 2001 level. Gaps of inpatient costs between first and seventh nurse staffing grades were over 10% in 4 out of 7 DRG diagnosis; However differences of DRG fee between tertiary and general hospitals were only 4.51% and 4.72% respectively. A DRG fee adjustment mechanism was developed that included nurse staffing grades and hospitalization days as factors of the formula. Conclusion: Current DRG fees motivate hospitals to decrease nurse staffing grades because cost reduction is bigger than compensation. This DRG fee adjustment mechanism reflects nurse staffing supply to motivate hospitals to hire more nurses as a reasonable compensation system.

An Economic Analysis on Dual-fuel Engine Generation for Peak Load (피크부하용 혼소엔진발전의 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

The Effect of Relational Benefits, Reward Programs and Switching Costs on Relational Commitment in Container Terminals (컨테이너터미널의 관계혜택, 보상프로그램 및 전환비용이 관계결속에 미치는 영향)

  • Yang, Yun-Ok;Shin, Chang-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.36 no.8
    • /
    • pp.673-681
    • /
    • 2012
  • As competition increases among ports, new marketing strategies and differentiated means in addition to the existing core services are needed to prevent existing container shipping companies from escaping and to attract new customers. The additional services and reward programs are investigated. How these variables affect relational commitment in terms of customer retention is examined. Customers of the container terminals are examined in terms of psychological behavior. This study presents the structural equation model that shows the connection among benefits, rewards, switching costs and relational commitment. The empirical analysis is done with the subject of the container terminal users and the implications are derived.

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

Development of a Micro-Bubble System for Ozone Off-Gas Recycling in the Ozone Treatment Process (오존처리공정의 배오존 재활용 마이크로버블시스템 개발)

  • Young-Man, Cho;Jae-Ouk, Jung;Kwang-Heon, Lee;Yong-Jun, Jung
    • Journal of Environmental Science International
    • /
    • v.31 no.12
    • /
    • pp.1061-1068
    • /
    • 2022
  • The purpose of this study was to develop a recycling system for ozone off-gas. Although the ozone transmission rate of the injector method differs slightly depending on the ozone injection rate, it reaches approximately 99%, which is very high. During the increase in water inflow to the ozone recycling system from 2 L/min to 10 L/min, the average ozone recycling rate was 99.4% at a 1 ppm ozone injection rate, 98.6% at a 2 ppm ozone injection rate, 98.1% at a 3 ppm ozone injection rate. Ozone treatment facility operating costs can be divided into the costs of pure oxygen production, ozone production, and maintenance. The annual operating costs of ozone treatment facilities in Korea are estimated to be approximately 38.9 billion won. The annual savings are estimated to be approximately 5.8 billion won when the ozone transfer rate of the diffuser method, which is mostly employed in domestic water treatment plants, is 85% and 15% of the ozone is recycled.

DISTANCE MEASUREMENT IN THE AEC/FM INDUSTRY: AN OVERVIEW OF TECHNOLOGIES

  • Jasmine Hines;Abbas Rashidi;Ioannis Brilakis
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.616-623
    • /
    • 2013
  • One of the oldest, most common engineering problems is measuring the dimensions of different objects and the distances between locations. In AEC/FM, related uses vary from large-scale applications such as measuring distances between cities to small-scale applications such as measuring the depth of a crack or the width of a welded joint. Within the last few years, advances in applying new technologies have prompted the development of new measuring devices such as ultrasound and laser-based measurers. Because of wide varieties in type, associated costs, and levels of accuracy, the selection of an optimal measuring technology is challenging for construction engineers and facility managers. To tackle this issue, we present an overview of various measuring technologies adopted by experts in the area of AEC/FM. As the next step, to evaluate the performance of these technologies, we select one indoor and one outdoor case and measure several dimensions using six categories of technologies: tapes, total stations, laser measurers, ultrasound devices, laser scanners, and image-based technologies. Then we evaluate the results according to various metrics such as accuracy, ease of use, operation time, associated costs, compare these results, and recommend optimal technologies for specific applications. The results also revealed that in most applications, computer vision-based technologies outperform traditional devices in terms of ease of use, associated costs, and accuracy.

  • PDF

A Collaborative Engineering Based System Supporting Product Development Process (협업공학 기반의 제품개발 지원 시스템)

  • Park H. S.;Choi H. W.;Lee G. B.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.9 no.4
    • /
    • pp.387-396
    • /
    • 2004
  • In order to keep and increase a competitive potential, industrial enterprises have to reduce their costs for product development as well as shorten lead time in product development processes. Moreover they have to respond to market factors and conditions such as increasing demands for functionality and individuality of products, short product life cycles, high pressure on prices and time to market. The improved functional requirement in connection with high time and cost pressure lead to high risk in product development. Technological fine improvements in connection with high time and cost pressure lead to high development risk. To cope with these challenges many enterprises have to collaborate globally. The collaborative engineering in product development is aimed to create distributed collaborative corporations and to facilitate the management of design conflicts. This paper provides a methodology for analyzing collaborative design process as well as the tools and the framework to support collaborative product development. The methodology can identify the interdependences among design tasks and teams. The tools and framework are implemented to facilitate the management of product development process.

A Survey on Child Rearing Conditions and Parent Education for Parents before and after Childbirth (자녀출산 전후의 부모들을 위한 양육여건 및 부모교육 실태 조사 - 대전광역시를 중심으로-)

  • Park, Young-Yae;Lee, Gab-Sook;Rha, Jong-Hye
    • Korean Journal of Human Ecology
    • /
    • v.12 no.4
    • /
    • pp.463-495
    • /
    • 2003
  • The purpose of this study was to obtain a fundamental data for developing a policy concerning women and child rearing and a parent education program for young parents who are around their childbirth, a period crucially important both for the parents in terms of the role adjustment, career management, and family finance, and for the infants in terms of its physical and psychological well-being. The subjects were 509 mothers before and after childbirth currently living in the Metropolitan City of Daejeon. Data were obtained through questionnaires and interviews in two major areas of pregnancy-delivery-childcare and parent education. Data were analyzed using SAS, mostly through frequency analysis, percentiles, t-tests, and F-tests. Results of descriptive analyses were organized along the following areas and issues: Pregnancy(family planning, regular check-ups, difficulties, prenatal education, costs, etc.); delivery(type of delivery, delivery related experience, costs, clinic/medical institute of choice, worries/problems, help/supports, etc.); postpartum care(place, kinds of help and helper, costs, postpartum care facilities, etc.); childcare circumstances(place, carer, time schedules, childcare centers or facilities feeding and weaning, etc.); husband's attitudes and involvement in the overall process; working mothers(maternity leave, temporary retirement for child rearing, etc.); and, parent education(family planning, pregnancy, delivery, postpartum care, child rearing, areas or issues needing parent education, facilitative and hindering factors to ideal parenting, etc.). Differences between groups of pregnant mothers and postpartum mothers, working- and non-working mothers, groups of different income levels, mothers and fathers of different educational levels, mothers of first pregnancy(or childbirth) and experienced mothers were also analyzed. Several conclusions with suggestions were drawn in relation to the need for strong implementation as well as developing of policies on women and childcare and for developing a new parent education program for parents before and after childbirth.

  • PDF

Cost Based Vulnerability Control Method Using Static Analysis Tool (정적 분석 툴을 이용한 비용 기반의 취약점 처리 방안)

  • Lee, Ki Hyun;Kim, Seok Mo;Park, Young B.;Park, Je Ho
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.5 no.3
    • /
    • pp.139-144
    • /
    • 2016
  • When, Software is developed, Applying development methods considering security, it is generated the problem of additional cost. These additional costs are caused not consider security in many developing organization. Even though, proceeding the developments, considering security, lack of ways to get the cost of handling the vulnerability throughput within the given cost. In this paper, propose a method for calculating the vulnerability throughput for using a security vulnerability processed cost-effectively. In the proposed method focuses on the implementation phase of the software development phase, leveraging static analysis tools to find security vulnerabilities in CWE TOP25. The found vulnerabilities are define risk, transaction costs, risk costs and defines the processing priority. utilizing the information in the CWE, Calculating a consumed cost in a detected vulnerability processed through a defined priority, and controls the vulnerability throughput in the input cost. When applying the method, it is expected to handle the maximum risk of vulnerability in the input cost.