• Title/Summary/Keyword: Detour Route

Search Result 29, Processing Time 0.024 seconds

A Study on the Protection Switching Mechanism for Distribution Automation System Ethernet Networks Service of Distribution Automation System (배전자동화시스템 통신서비스를 위한 이중화 통신망 보호절체 알고리즘 연구)

  • Yu, Nam-Cheol;Kim, Jae-Dong;Oh, Chae-Gon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.6
    • /
    • pp.744-749
    • /
    • 2013
  • The protection switching technology is widely adopted in the fiber-optical transmission equipments based on TDM(Time Division Multiplexing), such as PDH, SDH/SONET. A variety of protection switching algorithms for Ethernet networks and the progress of standardization are summarized in the document. There are several kinds of protection switching algorithms for Ethernet networks, such as STP, RSTP, MSTP and etc. However, since Ethernet signal move through detour route, it causes much time to recover. Accordingly, it is difficult to secure a usability of Ethernet networks and QOS(Quality of Service). Also, if the protection switching protocol standardized by IEEE and ITU-T is used, it remains a inherent network switching time for protection. Therefore, a specific protection switching algorithm for Ethernet are needed for seamless and stable operation of Ethernet networks service for Distribution Automation System(DAS). A reliable protection algorithm with no switching delay time is very important to implement Self-healing service for DAS. This study of FPGA based protection switching algorithm for Ethernet networks shows that in case of faults occurrence on distribution power network, immediate fault isolation and restoration are conducted through interaction with distribution equipments using P2P(Peer to Peer) communication for protection coordination. It is concluded that FPGA based protection switching algorithm for Ethernet networks available 0ms switching time is crucial technology to secure reliability of DAS.

Silver Nanowire-based Stretchable and Transparent Electrodes (Silver Nanowire 기반 Stretchable 투명 전극)

  • Lee, Jin-Young;Kim, Su-Yeon;Jeong, Da-Hye;Shin, Dong-Kyun;Yoo, Su-Ho;Seo, Hwa-Il;Park, Jong-Woon
    • Journal of the Semiconductor & Display Technology
    • /
    • v.14 no.3
    • /
    • pp.51-55
    • /
    • 2015
  • We have fabricated silver nanowire (AgNW) films as a stretchable and transparent electrode on polydimethylsiloxane (PDMS) substrates using a spray coater. Inherently, they show poor surface roughness and stretchability. To tackle it, we have employed a conductive polymer, poly (3,4-ethylenedioxythiophene) : Poly(styrene sulfonate) (PEDOT : PSS). PEDTO : PSS solution is mixed with AgNWs or spin-coated on the AgNW film. Compared with AgNW film only, PEDOT : PSS film only, and polymer-mixed AgNW films, the AgNW/polymer bilayer films exhibit much better surface roughness and stretchability. It is found that spray-coating of AgNWs on uncured PDMS and spin-coating of PEDOT : PSS solution on the AgNW films enhance the surface roughness of electrodes. Such a bilayer structure also provides a stable resistance under tensile strain due to the fact that each layer acts as a detour route for carriers. With this structure, we have obtained the peak-to-peak roughness ($R_{pv}$) as low as 76.8nm and a moderate increase of sheet resistance (from $10{\Omega}/{\Box}$ under 0% strain to $30{\Omega}/{\Box}$ under 40% strain).

The Collision Prevention System between Vehicles based on Fuzzy on a urban environment (도심환경에서 퍼지 기반 차량간 충돌 예방 시스템)

  • Jeong, Yi-Na;Lee, Byung-Kwan;Ahn, Heui-Hak
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.5
    • /
    • pp.69-79
    • /
    • 2014
  • This paper proposes the Collision Prevention System based on Fuzzy which reasons a risk with the location information of vehicles and pedestrians and prevents collision between vehicles, and between a vehicle and a pedestrian with the reasoned risk. The proposed system provides three functions. First, it identifies a pedestrian's location with his smart phone and a vehicle's location with the GPS equipped in the vehicle. and transfers the identified information to their neighbors. Second, it makes a vehicle and a pedestrian reason a risk by considering a moving direction, a moving speed and road information. Third, it provides a vehicle and a pedestrian with the reasoned information such as route detour, speed reduction, etc. Therefore, the proposed collision prevention system based on Fuzzy not only prevents collision accidents beforehand by reasoning a risk, but also reduces a variety of losses by protecting traffic accident and congestion.

Blind Detouring Problem in Geographic Routing for Wireless Ad-hoc Networks (무선 애드-혹 망을 위한 위치기반 라우팅에서의 맹목적 우회경로 결정문제)

  • Na, Jong-Keun;Kim, Chong-Kwon
    • Journal of KIISE:Information Networking
    • /
    • v.33 no.6
    • /
    • pp.428-437
    • /
    • 2006
  • Wireless ad-hoc routing has been extensively studied and many clever schemes have been proposed over the last several years. One class of ad-hoc routing is geographic routing where each intermediate node independently selects the next hop using the given location information of destination. Geographic routing, which eliminates the overhead of route request packet flooding, is scalable and suitable for large scale ad hoc networks. However, geographic routing may select the long detour paths when there are voids between a source and a destination. In this paper, we propose a novel geographic routing approach called Geographic Landmark Routing(GLR). GLR recursively discovers the intermediate nodes called landmarks and constructs sub-paths that connect the subsequent landmarks. Simulation results on various network topologies show that GLR significantly improves the performance of geographic routing.

Selection of Expressway Ramp Metering Sites and Priority Making (고속도로 램프미터링 도입지점 및 우선순위 선정)

  • Choi, Keechoo;Shim, Sangwoo;Lee, Eui-Eun;Kim, In-Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.579-585
    • /
    • 2009
  • In spite of the proven effectiveness of ramp metering system, it has not been successfully implemented in Korean setting. The purpose of this paper is to select target locations to introduce ramp metering into the Korean expressway system. For this, domestic standards to introduce ramp metering have been presented after reviewing those of the US. The major criteria are level of service (LOS), the existence of detour route, space for queue build-up and opened ramp. 15 different locations were selected and AHP has been used to make priority among them. Intuitively, the result of priority was in accordance with the congestion and traffic volume. The core results identified in this paper is expected to be used in different cities and expressway networks elsewhere.

Using Importance-Performance Analysis to Improve Traffic Information Disseminating Strategies on VMS (IPA를 이용한 VMS 서비스 평가와 정보제공 개선전략)

  • Choi, Keechoo;Choi, Yoon-Hyuk;Oh, Seung Hwoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.747-754
    • /
    • 2006
  • Real-time traffic information disseminated through VMS is known to have effects not only on driver to plan a route choice, detour the congestion, and cope with incident, but also on VMS operator to manage the traffic volume indirectly. But, the dissemination of traffic information is operated in the side of provider, not of user. Importance-Performance analysis (IPA) offers a simple, useful method for simultaneously considering both the importance and performance dimensions when evaluating or improving strategy. This technique has been successfully used in a variety of settings to define priorities and guide resource optimization decisions. This study uses IPA to evaluate traffic information strategies through VMS to make resource improvement recommendations. It gained 760 samples by field surveys, which are conducted in Korean Thanksgiving Day, weekday and weekend at the service areas of expressways. The results indicate that the motivations in quadrant I (concentrate here) are dissemination of exactly information and quick transmission, while distance of VMS, most drivers are not satisfied with that is located in quadrant III (low priority).

Evaluation of SWMM Snow-melt Module to Secure Bi-Modal Tram Operation (바이모달 트램 운행 안전성 확보를 위한 SWMM 융설 모듈 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.441-448
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the show pack melt/freezing due to unexpected snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snow-fall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for know removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system prediction.

A Strict Hub Network Design with Single Allocation for Road Freight Transportation (도로화물수송의 단일할당 제약 허브네트워크 설계)

  • Kim, Nam-Ju;Kim, Yong-Jin
    • Journal of Korean Society of Transportation
    • /
    • v.29 no.2
    • /
    • pp.91-100
    • /
    • 2011
  • Hub network design for freight transportation is a decision process that determines hub locations together with freight transportation routes among shippers so as to ultimately minimize total logistics cost. This study presents the optimal location of hubs by strict hub network design policy with single allocation, which overcomes the limitation of Kim et al. (2008) that does not allow direct transportation among shippers. The greedy-interchange algorithm is employed for hub location decision process, and EMME/2 is adopted for the route searching process. Application of the processes to the nationwide highway network shows that the best hub locations in order are Seoul metropolitan, GyeongNam, Chung-nam, Jeon-Nam, Gyeong-Buk, Chung-Buk, and the locations are concentrated on the Seoul-Busan corridor. The strict hubnetwork design policy with single allocation increases the transportation distance but decreases the transportation cost by passing through the hubs instead of direct transportation. The reduction in total transportation cost can be achieved as the number of hubs increases, but the amount of the reduction gradually decreases because the cost reduction from the decrease in detour transportation distance between non-hubs and hubs becomes less than the discount reduction from dispersion of inter-hubs transportation volumes.

A Study on the Establishment of Optimal Transportation Networks in Busan New Port (부산항 신항 최적의 교통망 수립에 관한 연구)

  • Park, Ho-Kyo;Choi, Yang-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.125-132
    • /
    • 2017
  • The development project of Busan New Port aims to be Logistics Hub Port but there are too many things to deal with ; enlargement of harbour, interport competition, modernization of harbour loading equipment and so on. At present, 23 berths of North and South container quay are in operation and 22 berths will be constructed on west and south-side by 2020. Namely, Busan New Port will operate 45 berths in 2020. When it comes to port distripark, a large-scale of Port distripark project is underway, such as Ung-Dong district 1,2 phase, West container 1,2phase, North distripark and so on. This study is to deduce traffic system problem of Busan New Port which is caused by the development project through predicting traffic need considering the development project. According to study, there are three main problems of traffic system : 1. traffic congestion caused on main crossroad, connecting second harbour back road. 2. It has been predicted that South-North road and traffic capacity of New Port road would lack compared to traffic volume-to-be-increased. Moreover, the detour volume of traffic is caused because New Port's 1st avenue and route 2 were not connected directly. Thus, this study suggests three kinds of improvement plan for smoother traffic flow. 1st. Operate roundabout on major intersection, for example, second harbour back road, west container wharf's subway corridors(South to North), and permit only right turn on sub-intersection. 2nd. Extend New Port road(North container's port road) by utilizing side walk and median. 3rd. Install exit ramp which utilizes Route 2 connecting New Port's 1st avenue and local road 1042. The method we used to analyze the effect of improvement is Vissim of Mircro Simulation Package.