• 제목/요약/키워드: Detail point

검색결과 566건 처리시간 0.024초

Low Level GPU에서 Point Cloud를 이용한 Level of detail 생성에 대한 연구 (Point Cloud Data Driven Level of detail Generation in Low Level GPU Devices)

  • 감정원;구본우;진교홍
    • 한국군사과학기술학회지
    • /
    • 제23권6호
    • /
    • pp.542-553
    • /
    • 2020
  • Virtual world and simulation need large scale map rendering. However, rendering too many vertices is a computationally complex and time-consuming process. Some game development companies have developed 3D LOD objects for high-speed rendering based on distance between camera and 3D object. Terrain physics simulation researchers need a way to recognize the original object shape from 3D LOD objects. In this paper, we proposed simply automatic LOD framework using point cloud data (PCD). This PCD was created using a 6-direct orthographic ray. Various experiments are performed to validate the effectiveness of the proposed method. We hope the proposed automatic LOD generation framework can play an important role in game development and terrain physic simulation.

Accuracy Comparison Between Image-based 3D Reconstruction Technique and Terrestrial LiDAR for As-built BIM of Outdoor Structures

  • Lee, Jisang;Hong, Seunghwan;Cho, Hanjin;Park, Ilsuk;Cho, Hyoungsig;Sohn, Hong-Gyoo
    • 한국측량학회지
    • /
    • 제33권6호
    • /
    • pp.557-567
    • /
    • 2015
  • With the increasing demands of 3D spatial information in urban environment, the importance of point clouds generation techniques have been increased. In particular, for as-built BIM, the point clouds with the high accuracy and density is required to describe the detail information of building components. Since the terrestrial LiDAR has high performance in terms of accuracy and point density, it has been widely used for as-built 3D modelling. However, the high cost of devices is obstacle for general uses, and the image-based 3D reconstruction technique is being a new attraction as an alternative solution. This paper compares the image-based 3D reconstruction technique and the terrestrial LiDAR in point of establishing the as-built BIM of outdoor structures. The point clouds generated from the image-based 3D reconstruction technique could roughly present the 3D shape of a building, but could not precisely express detail information, such as windows, doors and a roof of building. There were 13.2~28.9 cm of RMSE between the terrestrial LiDAR scanning data and the point clouds, which generated from smartphone and DSLR camera images. In conclusion, the results demonstrate that the image-based 3D reconstruction can be used in drawing building footprint and wireframe, and the terrestrial LiDAR is suitable for detail 3D outdoor modeling.

구조계획과 디테일에 관한 연구 (A Study on Structural Plannings and Details)

  • 박선우;최취경
    • 한국공간구조학회논문집
    • /
    • 제9권1호
    • /
    • pp.53-60
    • /
    • 2009
  • 본 연구의 목적은 건축가와 구조엔지니어가 어떻게 밀접한 관계를 유지하면서 구조계획과 구조디테일을 발전시킬 수 있는 방법론에 대하여 논하고자 한다. 실제로 일반적인 건축물이 아닌 특수 건축물에서 구조적인 거동에 관한 조사 없이 디테일 해결이란 상당히 어렵다. 그러한 조사 없이 해결된 디테일은 힘의 흐름을 정확히 예측할 수 없고 단지 조형적인 이미지만 표현될 뿐이다. 건축가와 협력관계에서 디테일 해결하는 과정을 구조 엔지니어 입장에서 제시하고자 한다.

  • PDF

RFID 전자기준점 일련번호 구성기법 (Generation of ID in Control-point based on RFID)

  • 남권모;차득기;이인수;김수정
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2009년도 춘계학술발표회 논문집
    • /
    • pp.133-134
    • /
    • 2009
  • This study deals with a mobile terminal without connection to a network-server-program contained detail information of control-point reading ID consisted of latitude and longitude, following directly checking location on a control-point based on RFID.

  • PDF

전력수용가 정전비용 산출물 위한 설문조사 방법론에 관한 연구 (Research for the survey of method to serviced customer Interruption cost evaluation)

  • 박수만;김재철;문종필;배주천
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.259-261
    • /
    • 2002
  • KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.

  • PDF

내진 상세 철근콘크리트 골조의 비탄성 거동에 관한 해석적 연구 (Analytic Investigation on Inelastic Behavior of Reinforced Concrete Frame with Seismic Detail)

  • 박철용;이한선;김상대
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1996년도 가을 학술발표회 논문집
    • /
    • pp.466-472
    • /
    • 1996
  • The nonlinear analysis was perforned for a 2-bay 2-story moment-resisting reinforced concrete plane frame with seismic detail using KDARC 2D program. The analytical models consist of the material model, the member model, the hysteretic model, and the damage model etc. The conclusion based on the results of analysis is as following. : (1) Story shear-displacement relationship is similar to the experiment result but from the energy point of view, the analysis relationship is similar to the experiment result but from the energy point of view, the analysis result was different from the experiment result. (2) Plastic hinges were found to occur mainly in beams at first story while all the columns had plastic hinges throughout the structure. (3) Failure mode is a little different from experiment result in the yielding mechanism. (4) Damage index isabout 0.25. This means that the degree of damage is moderate and can be repairable.

  • PDF

국내 소프트웨어 개발사업에 적합한 기능점수규모 예측방법에 관한 연구 (A Study on Estimating Function Point Count of Domestic Software Development Projects)

  • 박찬규;신수정;이현옥
    • 경영과학
    • /
    • 제20권2호
    • /
    • pp.179-196
    • /
    • 2003
  • Function point model is the international standard method to measure the software size which is one of the most important factors to determine the software development cost. Function point model can successfully be applied only when the detailed specification of users' requirements is available. In the domestic public sector, however, the budgeting for software projects is carried out before the requirements of softwares ere specified in detail. Therefore, an efficient function point estimation method is required to apply function point model at the early stage of software development projects. The purpose of this paper is to compare various function point estimation methods and analyse their accuracies in domestic software projects. We consider four methods : NESMA model, ISBSG model, the simplified function point model and the backfiring method. The methods are applied to about one hundred of domestic projects, and their estimation errors are compared. The results can used as a criterion to select an adequate estimation model for function point counts.

Pinning potential of a perpendicular magnetic domain wall due to a point defect

  • Song, Kyungmi;Lee, Kyung-Jin
    • 한국자기학회:학술대회 개요집
    • /
    • 한국자기학회 2013년도 자성 및 자성재료 국제학술대회
    • /
    • pp.139-140
    • /
    • 2013
  • We investigate effect of a point defect on the pinning potential for a perpendicular magnetic domain wall based on the NEB method. We find that this method can give a reasonable value for the pinning potential and allows us to study the effect of various geometrical and magnetic properties on the pinning potential. In the presentation, we will discuss the effect of Ku and wire width on the pinning potential in detail.

  • PDF

반응면 기법을 이용한 초음속 전투기 날개의 다학제간 다점 설계 (Multidisciplinary Multi-Point Design Optimization of Supersonic fighter Wing Using Response Surface Methodology)

  • 김유신;김재무
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2004년도 추계 학술대회논문집
    • /
    • pp.173-176
    • /
    • 2004
  • In this study, the multidisciplinary aerodynamic-structural optimal design is carried out for the supersonic fighter wing. Through the aeroelastic analyses of the various candidate wings, the aerodynamic and structural performances are calculated such as the lift coefficient, the drag coefficient and the deformation of the wing. In general, the supersonic fighter is maneuvered under the various flight conditions and those conditions must be considered all together during the design process. The multi-point design, therefore, is deemed essential. For this purpose, supersonic dash, long cruise range and high angle of attack maneuver are selected as representative design points. Based on the calculated performances of the candidate wings, the response surfaces for the objectives and constraints are generated and the supersonic fighter wing is designed for better aerodynamic performances and less weights than the baseline. At each design point, the single-point design is performed to obtain better performances. Finally, the multi-point design is performed to improve the aerodynamic and structural performances for all design points. The optimization results of the multi-point design are compared with those of the single-point designs and analyzed in detail.

  • PDF

게임요소의 규모가중치 기준 연구 (The Weight of Game Factor of Game Contents Costing)

  • 임득수;이태호
    • 디지털융복합연구
    • /
    • 제4권1호
    • /
    • pp.9-16
    • /
    • 2006
  • Function Point(FP) is well spread and advanced methodology in software costing. But FP is not common in game contents costing. It is one reason that Game Contents is a new area in software costing. And, ISO/IEC FDIS 19761(final draft) recommends not to use FP method in game contents costing. So we suggested new methodology in that area which is called Game Factor Point Method(GFPM). In this paper, we studied more about the weight of the game factor. We hope this will clarify them. We made definition of game factor, and studied more detail about Mission which was a little ambiguous in prior study. We also studied difficulties of game factor which will be a very important factor in game contents costing.

  • PDF