• Title/Summary/Keyword: Design-Build delivery method

Search Result 25, Processing Time 0.024 seconds

A Study on the Success Model for Design-Build Delivery Method Process (설계시공일괄방식 프로세스 성공모델에 관한 연구)

  • Kim Jeong-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.119-127
    • /
    • 2003
  • Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Cost Performance Comparison of Project Delivery Methods in Public Sector - Focusing on Mediator Effect of Biddropping on Change Orders - (공공건설공사 발주방식에 따른 비용성과 실증비교 - 설계변경에 대한 낙찰률 매개효과를 중심으로 -)

  • Moon, Hyosoo;Lee, Hyun-Soo;Park, Moonseo;Lee, Bogyeong;Joo, Seonu;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.86-96
    • /
    • 2015
  • According to previous research, the reason why Design-Build(hereinafter "DB") outperforms Design-Bid-Build(hereinafter "DBB") in terms of cost is due to less change orders(hereinafter "COs"). However, if biddropping was low for DBB resulting into increasing COs, then it would be wrong to conclude that DB is superior due to less COs. Therefore, in order to confirm such misjudgment, the attempt to comprehensively analyze biddropping, COs and delivery method was made as previous methods had analyzed either the relationship between delivery method and COs, or biddropping and COs. This research uses path analysis, which simultaneously compares effect sizes on COs according to delivery method and biddropping based on the project type, and validated the mediator effect. The research proved that DB outperforms DBB due to less COs cannot be validated as biddropping caused a mediator effect by intervening between the delivery method and COs for specific project types. Therefore, the mechanism of delivery method acts on COs through biddropping was established. Also, the identity of biddropping was investigated in a different perspective from previous research. Based on this result, this research is expected to help determine a delivery method by considering the mediator effect of specific projects and evaluate performance.

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF