• Title/Summary/Keyword: Design-Build Process

Search Result 484, Processing Time 0.023 seconds

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Identification of Claim Elements for Design Build Projects using FMEA Method (FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출)

  • Yoon, Seokmin;Hyun, Changtaek;Han, Sangwon;Cha, Yongwoon
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

Development and Design of Variable Lamination Manufacturing (VLM) Process by Using Expandable Polystyrene Foam (발포 폴리스티렌 폼을 이용한 가변 적층 쾌속 조형 공정 설계 및 개발)

  • 안동규;이상호;양동열;신보성;박승교;이용일
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.759-762
    • /
    • 2000
  • Rapid Prototyping (RP) techniques have their unique characteristics according to the working principles: stair-stepped surface of parts due to layer-by-layer stacking, low build speed caused by line-by-line solidification to build one layer, and additional post processing to improve surface roughness, so it is required very high cost to introduce and to maintain RP apparatus. The objective of this study is to develop and design a new RP process, Variable Lamination Manufacturing using expandable polystyrene foam sheet as part material (VLM-S), which can make up for the disadvantage of existing techniques, and to develop an apparatus to implement the process. In order to examine the possibility of practical utilization of the proposed VLM-S process for prototyping of a general three-dimensional shape, an auto-shift lever knob and a pyramid shape were fabricated.

  • PDF

ROLES AND RELATIONSHIPS BETWEEN ARCHITECTS AND CONTRACTORS BASED ON CONTRACTOR-DESIGNER ISSUE IN JAPAN

  • Sayaka Nishino;Shin Takamatsu;Shuzo Furusaka
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.758-763
    • /
    • 2009
  • In Japan, it has been argued between architects and contractors that which process is desirable, the traditional process or the design-build process. It is called the contractor-designer issue. In 1968, Kajima Corporation chairman Morinosuke Kajima and the Japan Architects Association had a public controversy over it. On the other hand, in practice, architects and contractors have secured quality of buildings thorough a close communication in the design and construction process of building. What are the relationships between architects and contractors? What roles do architects and contractors have in practice? This study has two aims. First one is to analyze the contractor-designer issue based on roles and relationships between architects and contractors, and then to show conflicts between them. Second one is to consider issues which architects face in the relationships with contractors.

  • PDF

Development of a Dedicated CAM System for Styrofoam-pattern Machining (자동차 프레스 금형의 스티로폼-패턴 가공을 위한 전용 CAM 시스템 개발)

  • 박정환
    • Korean Journal of Computational Design and Engineering
    • /
    • v.3 no.4
    • /
    • pp.223-235
    • /
    • 1998
  • A dedicated CAM(Computer-Aided Manufacturing) system has been developed, which generated tool-path to machine Styrofoam stamping die-patterns in Chrysler Corporation. A previous process to build die-patterns was to "stick build" the pattern, in which stock is cut & glued together, and then the NC machining of part-surface shape completes building a Styrofoam die-pattern. The current process utilizes the developed CAM system, and almost removes the manual work, consequently reduces the overall lead time. The paper presents the overall system structures, tool-path generation, and some features of Styrofoam pattern machining.

  • PDF

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

Material Characterization of RP Process - Fused Deposition Modeling (쾌속조형용 재료의 특성 - FDM)

  • 김승화;안성훈
    • Korean Journal of Computational Design and Engineering
    • /
    • v.7 no.2
    • /
    • pp.96-101
    • /
    • 2002
  • Rapid Prototyping (RP) technology has been advanced to fabricate initial prototypes from various materials. Stratasys′ Fused Deposition Modeling (FDM) is one of the typical RP processes that provide functional prototypes of ABS plastic. In order to predict the behavior of final ABS parts, it is critical to understand the material properties of the raw FDM process material, and the effect that FDM build parameters have on the FDM part. In this paper, we seek to characterize the properties of ABS parts fabricated by the FDM 1650. Using the Design of Experiment (DOE) approach, the process parameters of FDM, such as raster orientation, air gap, bead width, color, and model temperature were examined. Tensile strengths of crisscross specimens, 〔45°/-45°〕, cross specimens, 〔0°/90°〕, and directionally fabricated tensile specimens (〔0°〕 and 〔90°〕) were measured and compared with the injection molded FDM-ABS P400 material. For the FDM parts made with a -0.003"air gap, the typical tensile strength ranged between 50 percent and 83 percent of the strength of injection molded ABS P400. From the experiments, a couple of build rules for designing FDM parts were obtained.

Efficient Calculation of Trapped Volumes in Layered Manufacturing Process (적층 성형 과정에서 고립 체적의 효율적 계산)

  • 김진영;이건우;정융호
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.2
    • /
    • pp.154-161
    • /
    • 1998
  • Prototypes of a design are always needed for the purpose of visualization and evaluation in the aspect of manufacturability functionality, and aesthetic appearance. Since the prototyping process requires a significant amount of cost and time, various rapid prototyping processes are recently being introduced in the process. However, it is usually necessary for a part built up by a rapid prototyping system to be refined by a post-processing process, in which the stair steps on the surfaces, the support structures (if they exist), and the unprocessed material are eliminated. This post-processing is usually done manually and is a time-consuming task. Especially, eliminating the trapped volumes, the volume of the unprocessed material entrapped by the solidified portion, is sometimes impossible in some processes. This study provides a designer with a tool to detect the existence and to calculate the quantity of the trapped volumes at the given build-up direction, so that the proper build-up direction is chosen or the part is built by pieces to avoid the problems caused by the trapped volumes in advance. Since the proposed algorithm can efficiently calculate the amount of the trapped volumes at any build-up direction, it has the potential of such application as optimizing the build-up direction to minimize the trapped volumes.

  • PDF