• 제목/요약/키워드: Design expert system

검색결과 712건 처리시간 0.026초

조선 후기 원유의 영선체제와 과정에 관한 연구 (A Study on the System and Process of the Construction and Management for the Royal Garden and Landscape in the Late Choson Dynasty)

  • 전영옥
    • 한국조경학회지
    • /
    • 제26권2호
    • /
    • pp.73-90
    • /
    • 1998
  • The construction and management of the royal garden and landscape were the most significant project in Choson Dynasty. The kind of the royal garden and landscape were the rear garden of the palace, the groves of the royal shrine and orchard, etc. As the important project of the country, these constructions were controlled by the administrative system without division into the fields of engineering, building and landscaping. The purpose of this study is to investigate the administrative system. In particular, this study is focused on the construction and management of the royal garden and landscape in Hanyang from the 18th century to the late 19th century. This study is based on the analysis of historic documents and a survey of the relics. The results were summarized as follows : 1) The administrative system of the construction and management of the royal garden and landscape was composed of the government offices under Industry Board as a permanent organization - Yongjosa, Santaeksa, Chunchonsa, Songonggam, Changwonso - and Togam as a temporary organization. In addition to these organizations, there were Revenue Board, Ceremony Board, Military Board, which served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and Songonggam. The high cost works were carried out through Togam and normal repairing works were completed by Songonggam. In case of planting, those works were carried out through Chunchonsa and the military. The management in the 3rd step; This process was done by two parts like the process of works. In case of facilities, management was done 효 the officers of Pongshim. In case of groves of newly - planted trees, this management was done by Tongsanbyonlgam and Tongsanjik who served cultivation and harvest of fruit trees as an expert.

  • PDF

Reliability of mortar filling layer void length in in-service ballastless track-bridge system of HSR

  • Binbin He;Sheng Wen;Yulin Feng;Lizhong Jiang;Wangbao Zhou
    • Steel and Composite Structures
    • /
    • 제47권1호
    • /
    • pp.91-102
    • /
    • 2023
  • To study the evaluation standard and control limit of mortar filling layer void length, in this paper, the train sub-model was developed by MATLAB and the track-bridge sub-model considering the mortar filling layer void was established by ANSYS. The two sub-models were assembled into a train-track-bridge coupling dynamic model through the wheel-rail contact relationship, and the validity was corroborated by the coupling dynamic model with the literature model. Considering the randomness of fastening stiffness, mortar elastic modulus, length of mortar filling layer void, and pier settlement, the test points were designed by the Box-Behnken method based on Design-Expert software. The coupled dynamic model was calculated, and the support vector regression (SVR) nonlinear mapping model of the wheel-rail system was established. The learning, prediction, and verification were carried out. Finally, the reliable probability of the amplification coefficient distribution of the response index of the train and structure in different ranges was obtained based on the SVR nonlinear mapping model and Latin hypercube sampling method. The limit of the length of the mortar filling layer void was, thus, obtained. The results show that the SVR nonlinear mapping model developed in this paper has a high fitting accuracy of 0.993, and the computational efficiency is significantly improved by 99.86%. It can be used to calculate the dynamic response of the wheel-rail system. The length of the mortar filling layer void significantly affects the wheel-rail vertical force, wheel weight load reduction ratio, rail vertical displacement, and track plate vertical displacement. The dynamic response of the track structure has a more significant effect on the limit value of the length of the mortar filling layer void than the dynamic response of the vehicle, and the rail vertical displacement is the most obvious. At 250 km/h - 350 km/h train running speed, the limit values of grade I, II, and III of the lengths of the mortar filling layer void are 3.932 m, 4.337 m, and 4.766 m, respectively. The results can provide some reference for the long-term service performance reliability of the ballastless track-bridge system of HRS.

다양한 취약점 점검 도구를 이용한 자동화된 네트워크 취약점 통합 분석 시스템 설계 (An Automatic Network Vulnerability Analysis System using Multiple Vulnerability Scanners)

  • 윤준;심원태
    • 한국정보과학회논문지:컴퓨팅의 실제 및 레터
    • /
    • 제14권2호
    • /
    • pp.246-250
    • /
    • 2008
  • 본 논문에서는 네트워크 취약점 분석 결과의 정확성을 향상시키기 위한 방법으로 다양한 취약점 점검 도구를 통합할 수 있는 네트워크 취약점 자동 분석 시스템을 제안한다. 일반적으로 전문가에 의한 수동 점검이 가장 정확한 취약점 점검 방법으로 평가되지만, 복잡하고 규모가 큰 네트워크의 경우 효율적인 취약점 분석을 위해 자동화된 네트워크 취약점 점검 도구를 활용한다. 그런데 취약점점검 도구의 종류에 따라 점검 대상이 다르거나 동일한 점검 대상에 대해서도 점검 항목과 점검 결과가 다를 수가 있어, 상호보완적인 목적으로 몇 개의 취약점 점검 도구를 동시에 사용하는 것이 효과적이다. 그러나 취약점 점검 도구들의 점검 결과에 대한 연관성 분석과 통합 분석에는 사람에 의한 수동적인 분석 작업이 필요하기 때문에, 이것은 상당히 시간 소모적인 작업이 되고 네트워크의 규모에 따라 통합 분석이 불가능하기도 하다. 본 논문에서는 다양한 취약점 점검 도구를 통합할 수 있는 인터페이스를 제공하고, 공통의 점검 정책 수립과 통합 분석의 자동화를 특징으로 하는 네트워크 취약점 통합 분석 시스템을 제안한다.

다단계 퍼지 리스크 그래프 모델을 적용한 SIL 할당에 관한 연구 (A Study of SIL Allocation with a Multi-Phase Fuzzy Risk Graph Model)

  • 양희갑;이종우
    • 한국철도학회논문집
    • /
    • 제19권2호
    • /
    • pp.170-186
    • /
    • 2016
  • 본 논문에서는 철도 시스템에서 안전무결성수준 평가를 위한 다단계 퍼지 리스크 그래프를 제안한다. 본 모델은 입력변수의 모호함과 주관적 전문가 판단의 단점을 보완하는 것을 목적으로 한다. 다단계 퍼지 리스크 그래프 모델은 2단계로 구성된다. 본 논문에서는 첫 번째 퍼지화를 위한 상세 입력 변수가 제안되고 첫 번째 단계에서 퍼지 이론을 적용하여 기존의 리스크 그래프 입력 변수인 심각도, 노출도, 회피도, 요구율을 산정한다. 퍼지 추론 및 역퍼지화 결과 2단계에서 적용할 입력변수가 도출된다. 두 번째 단계에서는 식별된 해당 해저드에 대하여 안전 무결성 수준과 허용 해저드율을 산정하여 안전 요구사항을 수립한다. 또한 다단계 퍼지 리스크 그래프 모델을 검증하기 위해 CENELEC SC 9XA WG A10 보고서에 소개된 건널목 시스템을 대상으로 한 안전성 평가 결과와 비교하여 모델을 검증하였으며, 철도 분야의 초기 개념 설계 단계 안전성 요구사항을 수립 시 적용할 수 있다.

전자기장을 이용한 준설토 고효율 이송기술 실증 및 기술 지침 개발 (Dredging Material High Efficiency Transport Technology Test by Using the Electro Magnetic Field and Development of the Technical Design Manual)

  • 김동철;김유승;여찬수;김선빈;박승민
    • 한국연안방재학회지
    • /
    • 제5권4호
    • /
    • pp.173-182
    • /
    • 2018
  • As the research about increasing the efficiency of dredging soil transport, the technology, which reduce the friction between pipe wall and fluid in the pipe and disturbed generating pipe blockage, has been developed. So for the purpose of applying this technology to real construction site, main test has been tried at the real scale test in field. As a test result, this paper will show 30% flow efficiency increasing by permitted electro magnetic force to the pipe. And test result was evaluated as a ultra sonic velocity profiler. To propose the design technique and the execution manual of the high efficiency dredging material transport technic, this research have confirmed flow status changing depending on a soil material kind under electro-magnetic field and analyze the effect of electro-magnetic field which affects to each dredged soil material transportation. For achieving this research, EMF(Electro-Magnetic Field) generator is installed on the dredger(20,000HP) and through monitored flow status, dredging soil flow rate and sampled material specification is confirmed. Also dredger operating condition is measured and dredger power for soil transportation, hydraulic gradient and flow rate are compared, as transportation efficiency is calculated by this parameter, it is possible to check transportation efficiency improvement depending on each dredged soil material under electro-magnetic field. To verify the technique of dredged soil transfer using electromagnetic field, which is the core technique of the high efficiency dredged soil transfer, and the technique of expert system for pipeline transfer and the flow state. This could lead to a verification of transfer efficiency according to the characteristics of the dredged soil (sand, clay, silt) and the transfer distance (5km, 10km, 15km), which is planned to be used for a technology development of pump power reduction and long-distance transfer applying the high efficiency dredged soil transfer technology.

액상화 해석을 위한 UBC3D-PLM의 적용성에 관한 연구 (A Study on the Application of UBC3D-PLM for Soil Liquefaction Analysis)

  • 박언상;김병일
    • 한국지반신소재학회논문집
    • /
    • 제21권1호
    • /
    • pp.1-10
    • /
    • 2022
  • 본 연구에서는 액상화 평가를 위해 적용 가능한 UBC3D-PLM을 활용하고자 상대밀도를 이용한 모델 변수 평가방법을 제안하였다. 또한, 가속도와 간극수압이 측정되고 있는 액상화 발생 지역의 사례에 대한 동적 유효응력해석 즉, 액상화 해석을 수행하여 실측 및 기존 Finn 해석결과와 비교 분석하였다. 본 연구를 통해 제안한 방법은 관련 모델에서 요구하는 필요 변수를 쉽게 평가할 수 있고, 액상화가 발생된 지역에서의 간극수압 거동을 예측할 수 있는 것으로 나타났다. 또한, 연구대상 지역의 경우 실측과 해석 모두 지진 가속도가 최대값에 도달한 후, 일정 시간이 경과한 시점에서 액상화가 발생하는 것으로 나타났다. 본 연구에서 적용한 UBC3D-PLM의 경우 실측과 유사한 과잉간극수압 거동을 예측하였고, 실측과 동일하게 액상화 발생여부를 평가하였다. 특히, 모래층에서의 과잉간극수압이 더 크게 발생하였지만, 실제는 실트층에서 액상화가 발생한 현상을 정확하게 구현하였다. 제안 모델 변수 평가방법과 UBC3D-PLM을 적용한 유한요소해석이 실제와 유사하게 액상화 발생 영역을 평가함으로써 향후 내진 설계 및 보강 시 액상화 보강 영역 선정에 활용될 수 있을 것으로 기대된다.

델파이 기법을 활용한 화재피난 시나리오 개선 연구- 모바일 어플리케이션과 재실자 심리를 중심으로 - (A Study on the Improvement of Fire Evacuation Scenario Using Delphi Technique -Focus on The Mobile Application and psychology-)

  • 이상기;김성현
    • 서비스연구
    • /
    • 제12권2호
    • /
    • pp.23-37
    • /
    • 2022
  • 본 연구에서는 화재가 발생했을 때, 화재감지시스템과 연동된 모바일 어플리케이션의 도움을 받아 재실자들이 안전하게 피난할 수 있는 기존의 김태완 외3명(2018)이 제안한 서비스 시나리오를 토대로 1950년 RAND사가 개발한 다양한 전문가의 경험적 지식을 통한 문제해결을 하는 기법인 델파이 조사(Delphi Method)를 통해 좀 더 현실적인 시나리오를 작성하여 피난심리나 행동에 도움이 될 수 있는 모바일 자극을 접목하여 시나리오를 고도화하는 것이 최종 목적이다. 또한 제작되어지는 시나리오가 일반적인 건물의 구조와 동선까지 고려하여 좀 더 현실적으로 만들기 위해 전문가 시나리오검증과 델파이 기법을 적용하여 기존 시나리오에서 불필요하거나 현실적으로 실현이 어려운 부분을 제외 하였다. 연구 결과 1차 델파이 조사에서 화재경보 시에 보일 수 있는 주요 심리로 꼽혔던 것은 의구심, 안전불감, 경각심이었으며, 2차 델파이 조사의 결과를 분석한 결과 내용타당도(CVR)와 수렴도, 합의도를 모두 만족하는 것은 의구심과 경각심 두 가지 심리가 도출되었다. 최종적으로 이 내용을 적용하여, 모바일 어플리케이션의 도움을 받아 화재 대응 단계에서 피난하는 시나리오를 작성하였다. 본 연구를 통해서 화재발생시 재실자들의 피난률을 높이기 위해 이를 활용하는 방법을 적용할 수 있을 것이다.

플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발 (Development of Expert system for Plant Construction Project Management)

  • 김우주;최대우;김정수
    • 정보기술응용연구
    • /
    • 제2권1호
    • /
    • pp.1-24
    • /
    • 2000
  • 건설업에 있어서의 프로젝트 관리 즉, 사업 관리는 다른 분야에 비해 여러 가지 요인들로 인해 상대적으로 매우 높은 불확실성과 위험을 수반하게 되며, 이러한 불확실성과 위험으로 인해 건설업에서의 사업관리의 중요성이 매우 크게 인식되고 있다. 사업관리 단계에 있어 사업 정의 및 사업 계획 단계와 사업 설게 및 사업 수행 단계를 자동 또는 반자동적으로 동시에 일관성을 유지시킬 수 있는 체제의 확립이 절실하다고 판단되며, 이를 지원할 수 있는 지원시스템의 필요성이 부각되고 있다. 그러나 이들 초기 단계의 업무는 사업 설계 및 사업 수행 단계와 비교해 상대적으로 비정형적으며, 해당 기업의 축적된 노하우나 전문적 지식에 대한 의존성이 강함으로 인해 쉽게 시스템적 지원을 제공하는데 어려움을 가지고 있다. 특히 이러한 문제는 본 연구에서 대상으로 하고 있는 플랜트 건설 분야에서는 매우 두드러지게 나타나고 있다. 따라서 본 연구에서는 이러한 사업 관리 시스템과 연계될 수 있도록 할 수 있는 체계적 접근 방법을 제시하고 이를 구현함으로써 이상의 문제에 대한 하나의 해결 방법을 제시하고 있다. 이러한 해결 방안을 위한 주요 방법론으로서는 지식 기반 추론과 사례기반 추론 및 신경회로망 기법을 체택하고 있으며 덧붙여, 본 연구에서 개발된 사업 관리 전문가 시스템은 국내 굴지의 건설 회사의 열병 합발전소와 하수처리장 건설을 위한 실제 사업 관리 업무에 적용되어 그 성과를 경험적으로 검증하고 있다. 나아가 이러한 실제 적용 사례는 본 방법론 및 시스템이 다른 플랜트 건설 분야에서도 성공적으로 적용될 수 있으며, 따라서 플랜트 건설 분야에서의 사업 관리 업무의 질적 향상과 생산성의 제고에 기여할 수 있음을 시사하고 있다.

  • PDF

고령자 가정환경수정 관련 정책에 대한 이해: 작업치료사의 관점에서 (Understanding Policies related to Home Modification for the Elderly: An Occupational Therapist's Perspective)

  • 황나경;심선화
    • 한국융합학회논문지
    • /
    • 제12권12호
    • /
    • pp.389-399
    • /
    • 2021
  • 본 연구는 국내·외 가정환경수정 관련 정책들을 살펴봄으로써 'Aging In Place; AIP' 실현을 위한 국내 가정환경수정 관련 제도의 방향성과 가정환경수정 전문가로서 작업치료사에게 요구되는 역량에 대해 살펴보고자 하였다. 국내 가정환경수정 분야의 확장과 작업치료사 역량 강화를 위해 가정환경수정의 설계와 중재 실현이 반영된 명확하고 실질적인 가정환경수정 프로세스 확립이 요구되며, 거주인의 구체적인 필요와 요구를 파악하는 평가와 국내 주택 유형의 특성을 반영한 가정환경 평가도구의 적절한 선택 및 표준화 과정이 필요하다. 또한 정책과 제도에 대한 이해 및 타 분야 전문가와의 소통·협력을 위한 관련 지식 기반 구축을 위해 노력해야 할 것이다. 제도적 측면에서는 기존의 저소득층, 장애인 중심으로 시행되었던 주택개조 지원제도에서 저소득 고령자를 포함하여 소득 수준에 관계없이 고령자가 자신의 노화에 적응해 갈 수 있는 주택개조 지원제도가 필요하다. 더불어 국외 사례에서와 같이 베리어프리(Barrier Free) 주택개조 지원제도와 정부와 지자체의 협력을 통한 지원범위 확대, 저리 융자와 조세 감면, 환경수정 서비스 관련 단체 및 기관들의 거버넌스 구축 등 다양하고 효율적인 방안 마련을 위해 노력할 필요가 있다.

치유정원 조성을 위한 계획요소의 중요도 분석 (Analysis of the Importance of Planning Elements for Healing Gardens)

  • 정명자;박원규
    • 한국조경학회지
    • /
    • 제45권4호
    • /
    • pp.81-91
    • /
    • 2017
  • 본 연구는 효과적인 치유정원 계획에 필요한 치유정원 계획요소의 체계를 세우기 위해 선행 연구문헌을 종합 분석하여 치유정원 계획분야와 계획요소를 도출하고, 전문가 설문을 통하여 치유정원 계획요소의 중요도를 평가하였다. 연구결과는 다음과 같다. 첫째, 5개 계획분야와 19개 계획요소를 도출하였으며, 그 내용은 다음과 같다. $\LARGE{\cdot}$ 계획분야: 물리적 환경, 사회적 환경, 인지적 환경, 기능적 환경, 심리적 환경 $\LARGE{\cdot}$ 계획요소: 식물식재, 정원경관, 수경공간, 그늘공간, 작업공간, 레크레이션공간, 커뮤니티공간, 운동공간, 랜드마크요소, 사인시스템, 안전한 시설물과 재료, 재해안전시설, 유니버설디자인, 접근이 쉬운 동선, 경제적 유지관리, 시각적 개방성, 프라이버시 보장, 휴식공간의 다양성, 예술적 요소 둘째, 계획요소의 중요도 순위 분석 결과, 상위요소로 1순위는 식물식재, 2순위는 재해안전시설, 3순위로는 휴식공간의 다양성이 차지하였고, 하위요소로 예술적 요소와 랜드마크 요소가 각각 18위와 19위로 나타났다. 셋째, 계획요소의 중요도 수준을 평가하여 3개의 그룹으로 분류하였으며, 가장 중요한 A그룹은 식물식재, 재해안전시설이 포함되었고, 다음으로 중요한 B그룹은 휴식공간의 다양성, 커뮤니티공간, 수경공간, 유니버설 디자인, 안전한 시설물과 재료, 경제적 유지관리, 접근이 쉬운 동선, 프라이버시 보장, 정원경관, 작업공간, 시각적 개방성이 포함되었으며, 상대적으로 덜 중요한 C그룹은 그늘공간, 운동공간, 레크레이션공간, 사인시스템, 예술적 요소, 랜드마크 요소가 포함되었다. 그룹의 중요도 1순위의 2개 요소는 치유정원 계획 시에 필수적으로 적용되어야할 요소로 판단되며, 2순위의 11개 요소는 중요하게 고려되어야 하는 요소로 해석된다. 또한, 3순위의 6개 요소는 상대적으로 낮은 중요도 수준을 보여 치유정원 계획 시 설계자가 임의적으로 선택할 수 있는 요소로 판단된다.