• Title/Summary/Keyword: Design alternative

Search Result 2,645, Processing Time 0.027 seconds

The Taguchi Robust Design Method : Current Status and Future Directions (다구치 강건설계 방법 : 현황과 과제)

  • Yum, Bong-Jin;Kim, Seong-Jun;Seo, Sun-Keun;Byun, Jai-Hyun;Lee, Seung-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.5
    • /
    • pp.325-341
    • /
    • 2013
  • During the past several decades, the Taguchi robust design method has been widely used in various fields successfully. On the other hand, some researchers and practitioners have criticized the method with respect to the way of utilizing orthogonal arrays, the signal-to-noise ratio as a performance measure, data analysis methods, etc., and proposed alternative approaches to robust design. This paper introduces the Taguchi method first, evaluates the validity of the criticisms, and discusses advantages and disadvantages of each alternative. Finally, research issues to be addressed for effective robust design are presented.

A Study on Interweaving phenomena in contemporary space design with post-structualism (후기 구조주의 관점에서 본 현대 공간디자인에 나타나는 인터위빙(interweaving)현상에 관한 연구)

  • Jung Jae-Won;Kim Moon-Duck
    • Korean Institute of Interior Design Journal
    • /
    • v.15 no.4 s.57
    • /
    • pp.156-164
    • /
    • 2006
  • One of frequent phenomena in the contemporary cultural field is the alternative or accompanying interweaving phenomena which happens in the relative connection of A, B, and C. The power of interweaving mixture is one of energies which unify the contemporary cultural phenomena, and it appears as a major phenomena in the recent popular digital architecture. In this study, the mixture, shape, and contents in the contemporary space design is analyzed as a point of view of Post-Structuralism. Namely, the digital part and non-digital part of alternative and circulating existence in the space are classified and the interweaving phenomena in the contemporary space design are proved. It is studied for digital part and physical space to conjunct the hole space and smooth space of Deleuze as part of interweaving phenomena. It is clear that the compatible concept of the hole space and smooth space is crossed complexly or is coexisting in circulating and extending, and is showed as interweaving phenomena in one space.

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

An Implementation Analysis of Design VE to Turn-key and Alternative Project (턴키 및 대안입찰사업의 설계VE 성과분석)

  • Kim, Ki-Han;Lee, Hyun-Suk;Lim, Hee-Dong;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1011-1014
    • /
    • 2007
  • Design VE system in order to promote the economical efficiency and the functional elevation of construction facilities apply to conatruction over 10 billion from december 2005. But it don't achieve purpose of VE original to maximization of value creation through VE because VE perform formal and result center. This study suggests some idea and analyse implementation of design VE through design VE case of turnkey and alternative project performed in domestic.

  • PDF

System Design Using Discrete Event Simulation (이산사건 시뮬레이션을 사용한 시스템의 설계)

  • 이영해
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.03a
    • /
    • pp.50-55
    • /
    • 1998
  • In this paper we use discrete simulation method to get the criteria of system evaluation required in the case of designing the complicated probabilistic event system having discrete probabilistic variables and to search the effective and reliable alternatives to satisfy the objective value of the given system through on-line, single run within the short time period. If we find the alternative we construct the algorithm which change values of decision variables and determining alternative by using the stopping algorithm which end the simulation in the steady state of system. In order to prevent the loss of data when we analyze the acquired design alternative in the steady state we provide the background of the estimation of the autoregressive model and mean and confidence interval for evaluating correctly the objective function obtained by the small amount of output data through the short time period simulation.

  • PDF

Design of Cellular Manufacturing System with Alternative Process Plans under Uncertain Demand (수요가 불확실한 환경에서 대체공정계획을 고려한 셀형제조시스템 설계)

  • Ko, Chang-Seong;Lee, Sang-Hun;Lee, Yang-Woo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.4
    • /
    • pp.559-569
    • /
    • 1998
  • Cellular manufacturing system (CMS) has been recognized as an alternative to improve manufacturing productivity in conventional batch-type manufacturing systems through reducing set-up times, work-in-process inventories and throughput times by means of group technology. Most of the studies on the design of CMS assumed that each part has a unique process plan, and that its demand is known as a deterministic value despite of the probabilistic nature of the real world problems. This study suggests an approach for designing CMS, considering both alternative process plans and uncertain demand. A mathematical model is presented to show how to minimize the expected amortized and operating costs satisfying these two relaxations. Four heuristic algorithms are developed based on tabu search which is well suited for getting an optimal or near-optimal solution. Example problems are carried out to illustrate the heuristic algorithms and each of them is compared with the deterministic counterpart.

  • PDF

Design models for predicting the resistance of headed studs in profiled sheeting

  • Vigneri, Valentino;Hicks, Stephen J.;Taras, Andreas;Odenbreit, Christoph
    • Steel and Composite Structures
    • /
    • v.42 no.5
    • /
    • pp.633-647
    • /
    • 2022
  • This paper presents the results from reliability analyses of the current Eurocode 4 (EN 1994-1-1) and AISC 360-16 design models for predicting the resistance of headed stud shear connectors within profiled steel sheeting, when the ribs are oriented transverse to the supporting beam. For comparison purposes, the performance of the alternative "Luxembourg" and "Stuttgart" model were also considered. From an initial database of 611 push-out tests, 269 cases were included in the study, which ensured that the results were valid over a wide range of geometrical and material properties. It was found that the current EN 1994-1-1 design rules deliver a corrected partial safety factor γM* of around 2.0, which is significantly higher than the target value 1.25. Moreover, 179 tests fell within the domain of the concrete-related failure design equation. Notwithstanding this, the EN 1994-1-1 equations provide satisfactory results for re-entrant profiled sheeting. The AISC 360-16 design equation for steel failure covers 263 of the tests in the database and delivers 𝛾M*≈2.0. Conversely, whilst the alternative "Stuttgart" model provides an improvement over the current codes, only a corrected partial safety factor of 𝛾M*=1.47 is achieved. Finally, the alternative "Luxembourg" design model was found to deliver the required target value, with a corrected partial safety factor 𝛾M* between 1.21 and 1.28. Given the fact that the Luxembourg design model is the only model that achieved the target values required by EN 1990, it is recommended as a potential candidate for inclusion within the second generation of Eurocodes.

Experimental and analytical study of squat walls with alternative detailing

  • Leonardo M. Massone;Cristhofer N. Letelier;Cristobal F. Soto;Felipe A. Yanez;Fabian R. Rojas
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.497-507
    • /
    • 2024
  • In squat reinforced concrete walls, the displacement capacity for lateral deformation is low and the ability to resist the axial load can quickly be lost, generating collapse. This work consists of testing two squat reinforced concrete walls. One of the specimens is built with conventional detailing of reinforced concrete walls, while the second specimen is built applying an alternative design, including stirrups along the diagonal of the wall to improve its ductility. This solution differs from the detailing of beams or coupling elements that suggest building elements equivalent to columns located diagonally in the element. The dimensions of both specimens correspond to a wall with a low aspect ratio (1:1), where the height and length of the specimen are 1.4 m, with a thickness of 120 mm. The alternative wall included stirrups placed diagonally covering approximately 25% of the diagonal strut of the wall with alternative detailing. The walls were tested under a constant axial load of 0.1f'cAg and a cyclic lateral displacement was applied in the upper part of the wall. The results indicate that the lateral strength is almost identical between both specimens. On the other hand, the lateral displacement capacity increased by 25% with the alternative detailing, but it was also able to maintain the 3 complete hysteretic cycles up to a drift of 2.5%, reaching longitudinal reinforcement fracture, while the base specimen only reached the first cycle of 2% with rapid degradation due to failure of the diagonal compression strut. The alternative design also allows 46% more energy dissipation than the conventional design. A model was used to capture the global response, correctly representing the observed behavior. A parametric study with the model, varying the reinforcement amount and aspect ratio, was performed, indicating that the effectiveness of the alternative detailing can double de drift capacity for the case with a low aspect ratio (1.1) and a large longitudinal steel amount (1% in the web, 5% in the boundary), which decreases with lower amounts of longitudinal reinforcement and with the increment of aspect ratio, indicating that the alternative detailing approach is reasonable for walls with an aspect ratio up to 2, especially if the amount of longitudinal reinforcement is high.

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.