Analysis of Main Control Factors for Design Value Engineering Work in Construction Projects (건설 프로젝트 설계VE 업무의 중점 관리 요인 분석)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.128-137
    • /
    • 2006
  • Recently the role and the importance of design value engineering is expected to be high, so research is needed for its effective accomplishment. But in domestic arena, the introduction of the history of design value engineering is too short and insufficient in act of research. Therefore in this research we have suggest the standard for the effective accomplishment of design value engineering work. The way is the abstraction many causes. firstly, we analyzed the team project case of value engineering professional instruction. second, we analyzed the cause of problem produced in accomplishment process of design value engineering work through research for the professional field. So from the base of the analyzed content, we have suggest main control factor for the effectiveness of design value engineering work and the following scheme and process of work efficiency optimization.

Review of effectiveness at the Construction implementation design VE study by the selected target through CostModeling in the Pre-functional analysis Phase (건설공사 실시설계 VE시 기능분석 이전 단계에서 CostModeling을 통한 핵심 쟁점 사항 도출에 의한 효용성에 관한 고찰)

  • Jeong, Yeon-Goo;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.244-245
    • /
    • 2021
  • Design VE (Value Engineering) has been basic design and implementation design separately, but due to the recent change in guidelines, it is changing to implement only once in the implementation design stage. However, in the implementation design stage, construction costs, plans, and specifications based on the volume details are almost completed. Therefore, it is effective to perform the function analysis step after identifying information analysis and key issues through CostModeling based on functional center for the selected target in the process of implementing the VE performance procedure.

  • PDF

A Study on Competency Evaluation Item of Design Phase VE Team (설계VE팀의 역량 평가항목에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.797-800
    • /
    • 2007
  • Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.

  • PDF

Value Engineering Idea Generation for Temporary Construction Designs through Conflict Resolution (가시설 공사 설계VE 대안검토시 모순충돌 해결을 통한 아이디어 창출)

  • Hong, Soonheon;Baeg, Hangee;Moon, Sungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.30-37
    • /
    • 2013
  • Idea creation is the most important step in the overall value engineering (VE) process. Usually the activity is done mostly relying on the experience and knowledge of the experts in the VE team. A more organized approach is needed to find the chance of design improvement during a VE workshop. This study presents an organized approach to increasing the chance of idea creation during the VE workshop. The concept of conflict resolution in TRIZ (Theory of Inventive Problem Solving) is applied to understand the problem area during design improvement. The technical parameters were identified in the problem area to explain the conflicts in design improvement. These technical parameters were used to assist problem solving and improve design functions. A case study was done on a temporary construction operation, and demonstrated that the organized idea creation can help improve the design value of the temporary construction operation.

The Case Study of the Latest Performance on the Design Value Engineering (최근 설계VE 수행사례 연구)

  • Huh, Jae-Yung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.159-166
    • /
    • 2007
  • The Value Engineering(VE) well known as a way of Productivity Elevation is already the proven and outstanding management method in Construction Industry the inside and outside of country. The Value Engineering in domestic, revised by the method of the Construction Technique - Enforcement Ordinance ("the Examination of Design Economy") in 2005, is usually applicable to the Construction Work which cost over 10 billon won. But It is true that there is some differences between theory and reality to apply the Value Engineering in domestic. Therefore the differences are blocking process to enlarge and supply the VE in domestic. In this Study, through a case-analysis of the recently accomplished Design Value Engineering, we give a careful consideration to the problem and cause. And we are inclined to contribute to a successful stay of the Design Value Engineering in domestic as offering the solution about those.

  • PDF

A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis (VE/LCC 기법을 활용한 차수공법 선정사례 연구)

  • Cho Yong-Wan;Chang Jun-Ho;Kim Jin-Man;Ha Jae-In
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

An investigation of Function Analysis patterns for the Effective VE at the Design Phase (효과적인 설계VE 활동을 위한 기능분석 유형조사)

  • Min Kyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.63-71
    • /
    • 2004
  • This study is an analysis the function Analysis Patterns for the effective application of VE(Value Engineering) and a presentation of the function analysis methods. 1. The function analysis of VE activities can be summarized 6 patterns as follows ; a generated ideas without function analysis process, a function analysis make use of inspection tools for generated idea, an illogical jump as a using of subjective terms, a using of duplication terms for same functions, a subjective ranking as function definitions for function analysis, and a large classification for a for approaching function definition. 2. In order for the effective function analysis, the process requires as follows; a check level by project advanced, a reclassified main nouns in the order of frequency of use, a main check objects by concepts of importance and satisfaction degree. It is not only good for the effective function analysis, it also induces effective turn out of the FAST Diagram for function arrangement.

VE Alternative Verification Method Using KANO Model (카노모델을 활용한 VE대안 검증방법)

  • Liu, Jun-Nan;Qiao, Le;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.923-932
    • /
    • 2019
  • VE is used as a powerful tool to add value to facilities by improving functionality and reducing costs. By identifying the client's requirements in the VE process and reflecting them in the quality model, the developed alternatives meet the client's requirements. However, there is no process to verify how the developed alternatives reflect the needs of the client through functional analysis, idea generation and evaluation. The purpose of this study was to develop, verify, and prove the effectiveness of a methodology for evaluating client satisfaction with alternatives developed during the VE Job Plan. The KANO model, which can identify the satisfaction and dissatisfaction of requirements in product planning, was set as a methodology for alternative verification procedures of VE, and was improved and applied to the purpose of this study. As a result, the alternative evaluation method developed in this study was found to be useful. It is expected that the KANO model will be used to evaluate the satisfaction of VE alternatives in the VE Job Plan analysis.

A Study on Innovative Design Approaches for Implementing an Intelligent ICT-Based Smart Highway

  • Bong shik Yun;Myong yun Kim
    • Smart Media Journal
    • /
    • v.13 no.3
    • /
    • pp.62-73
    • /
    • 2024
  • This research, conducted over a three-year period starting from 2020, was a collaborative project between practitioners in the field of VE design and the Korea Expressway Corporation, aimed at innovating the design VE project to construct an intelligent ICT-based smart highway and enhancing highway driving performance and customer satisfaction. The research included R&D support for payment and management systems integrated with IOT technology, the application of the developed prototype at highway sites, and analysis of user performance evaluation. Based on the Innovation Work Roadmap of the Korea Expressway Corporation, the research process involved collaboration between a public participation group and an expert group, considering the technical feasibility of data-based ICT technology through the National Idea VE Contest. The final VE design results were implemented at the Seongnam tollgate site with budget support from relevant departments, followed by a satisfaction survey. It is expected that the continuous contributions to achieving an ESG society, such as the increase in the number of customers using the tolling zone equipped with smart upgrades, along with their satisfaction rate, and the reduction in carbon emissions and total settlement time of highway users, will be sustained.

Understanding of Nondestructive Testing Technique (건설공사의 Value Engineering Study)

  • 최춘배
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.53-58
    • /
    • 2001
  • Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.