• Title/Summary/Keyword: Design Project Planning

Search Result 591, Processing Time 0.024 seconds

Methodology for Establishment of Operational Concept for Speed-Up of Defense Robot and Improvement Direction of the Defense Acquisition System (국방로봇 신속 전력화를 위한 운용개념 수립 방법론 및 획득체계 개선방향)

  • Eom, Hongseob
    • The Journal of Korea Robotics Society
    • /
    • v.13 no.3
    • /
    • pp.182-189
    • /
    • 2018
  • The purpose of this paper is to suggest the methodology for the establishment of operational concept for speed-up of defense robot and improvement direction of the defense acquisition system for the defense robot. In order to achieve this goal, the current defense acquisition system was analyzed into long-term planning, mid-term programming, and project execution stages. And I suggest the methodology for the establishment of operational concept for speed-up of defense robot and direction of development of the defense robot acquisition system considering the characteristics of the robot in terms of core technologies of robot, robot ecosystem and effectiveness-based-robot-design, respectively. Based on the methodology for establishment of the operational concept of defense robot and development direction of the defense acquisition system presented in this study, it will be possible to design efficiently the defense robot in the future.

An Analysis of Success Factors of New Product Plan in DFSS (DFSS(Design For Six Sigma)사고를 통한 신제품계획 단계에서 프로젝트 성공요인에 대한 실증분석)

  • Lee, Kang-Koon;Ree, Sang-Bok
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.1
    • /
    • pp.42-50
    • /
    • 2005
  • The IMD(International Institute for Management Development) report said that national competitiveness of Korea is declined in this year. The main reason for Korea's decline is a largely related to the weakness of corporate competitiveness. The new product development is a necessary ingredient for improving the national competitiveness. The analysis of changing of technologies and customer's needs is needed for successful new product development. In this paper, We found out successful factors of the project by use of DFSS(Design for Six Sigma) and proved them by case study of K-company. Result from this paper is applied to the new product development planning step for K-company and it made a great success rate. It is expected that the result is applied to the same kind industries.

A Study on the Stack Effect Characteristics in High-Rise Apartments (초고층 주상복합 아파트의 연돌효과 특성에 관한 연구 -D 프로젝트를 중심으로-)

  • Choi, Dong-Tak;Son, Won-Tug;Choi, Young-Sik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.1
    • /
    • pp.37-43
    • /
    • 2011
  • Study of stack effects in the early design stage is the most appropriate moment to draw any problems and provide the right solutions. However, In a real process, The pre-design planning stage review is not thoroughgoing enough to high-rise construction site. Therefore, this study has reviewed by selecting one of inappropriate project [D] to find the possible stack effect alternatives in an early design documentation stage and provide countermeasures to be a foundations of stack effect in the construction stages.

Remarks on Education Method to Turn Failure Experience to Instructions for Engineering Design

  • Arimitsu, Yutaka;Yagi, Hidetsugu
    • Journal of Engineering Education Research
    • /
    • v.13 no.2
    • /
    • pp.74-77
    • /
    • 2010
  • This article proposes to examine how the study of failure differs from other technical subjects, and how to turn failure experiences to one's advantage. The authors surveyed the properties of failures in PBL (Project Based Learning) and also examined students' interest and understanding of failure, after introducing failure examples. To investigate how students communicate failure experiences to third parties, reports of the failure experience in PBL were evaluated. From above mentioned surveys, we get the following results. The typical causes of failure in educational institutions are lack of skill in manufacturing and inadequate planning, which conversely are minor causes of failure in the industry. A knowledge database on failure, employed commonly in industry, is not effective in PBL, because projects in educational institutes are usually changed every year. Case studies in failure can be approached from many points of view including causes, processes, effects and safety measures. While teachers should emphasize the notable points in the failure examples in introducing examples of specific topics in machine design, teachers should explain the multiple aspects in the failure examples to educate students about the complexity of actual accidents.

  • PDF

Optimal Design of Contour-Lined Plots for Land Consolidation Planning in Sloping Areas (경사지 경지정리지구의 등고선 구획 최적설계)

  • 강민구;박승우;강문성;김상민
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.6
    • /
    • pp.83-95
    • /
    • 2003
  • In this study, a new concept in a paddy consolidation project is introduced in that curved parallel terracing with contour-lined layout is adopted in sloping areas instead of conventional rectangular terracing. The contoured layout reduces earth-moving considerably compared to rectangular methods in consolidation projects. The objective of the paper is to develop a combinatorial optimization model using the network theory for the design of contour-lined plots which minimizes the volume of earth moving. The results showed that as the length of short side of plot is longer or the land slope is steeper, the volume of earth moving for land leveling increases. The developed optimization model is applied for three consolidated districts and the resulting optimal earth moving is compared with the volume of earth from the conventional method. The shorter is the minimum length of short side of a polt with increases the number of plots, the less is the volume of earth. As the minimum length of short side is 20 m for efficient field works by farm machinery, the volume of earth moving of optimal plot is less by 21.0∼27.1 % than that of the conventional consolidated plots.

A Methodology for Global ERP Implementation Based on GSI(Global Single Instance) and Its Application (GSI(Global Single Instance)기반의 Global ERP 구축 방법론 및 적용 사례)

  • Lee, Jae-Kwang;Cho, Min-Ho
    • Journal of Information Technology Services
    • /
    • v.7 no.3
    • /
    • pp.97-114
    • /
    • 2008
  • Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.

From Excluded Ghettos to Exclusionary Enclaves: A Private Sector Initiative in Guangzhou, China

  • Chen, Huiwei;Chan, Roger C.K.;He, Qicong
    • Land and Housing Review
    • /
    • v.4 no.3
    • /
    • pp.211-223
    • /
    • 2013
  • Massive migration is underway in rapidly urbanizing Guangzhou, the south gate of P. R. China. Over half the migrants choose to rent in "villages-in-the-city" in the downtown area because of the low-cost and prime location. The overpopulation and resulting poor environment and high crime-rate turn villages-in-the-city into de facto ghettos. As a result, these ghettos are undergoing a manner of demolition-development, leaving migrants' housing needs unmet. A private-sector initiative-the Tulou Commune-intends to address this considerable market potential. Targeting low-income groups, the Tulou Commune creates a socio-spatially exclusionary enclave. This paper analyzes the Tulou Commune and the implications if more low-income migrants shifting from village-in-the-city (excluded ghetto) to Tulou Commune (exclusionary enclave). This study argues that the intervention of the private sector causes the demographic, social, and spatial similarities and differences of the two living arrangements. Socioeconomic and institutional factors also affect the initiative. This study also provides more empirical evidence in the field of low-cost housing and socio-spatial development in transitional Chinese cities. As the first project of its kind, the analysis of the case can suggest how to improve strategies for accommodating migrants in the future.

Planning for the Yeonin Mountain Provincial Park (연인산 도립공원 조성계획)

  • Lee, Jun-Bok
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.1 s.120
    • /
    • pp.9-19
    • /
    • 2007
  • This plan was submitted as part of an invited competition for the provincial park planning of Yeonin Mountain, which was held by the Gyeonggi Innovation Corporation in November, 2006. The proposed site is located at Seungan-ri, Gapyung-eup, Gapyung-gun, Gyunggi-do and covers about $150,010m^2$. The main goal of this project is to "Suggest a New Park Paradigm" by shedding old ways of thinking about parks through an integrated development concept. Planning was approached as follows: First, providing an unique theme to the support facilities area of Yeonin Mountain Piovincial Park. To achieve this theme, the Seungan support facilities area was designated to be home to a Seven Colored Theme Garden, currently named the Native Wild-flower Garden, while the Baekdun facilities area is to be centered on a Self-loaming Forest Camp, which will give the chance of a hands-on wildlife experience. With these themes, which create recreational goals that will encourage not only tourism but education as well, the foundation was laid for a multi-purpose park paradigm. Second, Developing a Core Facility Zone. To accomplish the development of a core facility zone, park buildings will be arranged in accordance with an integrated building lay-out for easy access and use, and the facilities specified by design for the Seven Colored Theme Garden are provided for the newly prepared site. This will allow focus on the user's viewpoint instead of the view of the planner or of ease of maintenance.

A Study of Planning and Application of Fire Protection Facilities in Remodeling (리모델링시 소방시설의 계획 및 적용에 관한 연구)

  • Jung, Jin-Ho;Yun, Myung-O;Je, Jin-Ju
    • Fire Science and Engineering
    • /
    • v.22 no.5
    • /
    • pp.90-98
    • /
    • 2008
  • There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.

A Theoretical Study on the Wildlife Passage for Connecting Fragmented Habitat(I)- In the case of Wildlife Passage Types and Design Process (분절된 서식처의 연결을 위한 생태이동통로에 관한 이론적 연구(I) - 유형구분 및 조성절차를 중심으로 -)

  • 김귀곤;최준영
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.293-307
    • /
    • 1998
  • This study has been divided into two parts, 1) literature review and 2) a case study. Based on literature review and case studies found in Korea and abroad, this study aimed at classifying wildlife passages and establishing their development procedures in order to establish a theoretical ground for the development of wildlife passage as a way to link habitats that have been fragmented by the construction of roads and other developments. The results of the literature review are as follows : 1) Impact of road construction on surrounding ecological environment is found in various aspects. Along with damage of habitats as direct impact, decrease of biodiversity and simplification of species due to limited breeding and movement are cited as possible indirect impact. 2) In order to lessen the impact generated from fragmented habitats, various types of wildlife passage are being developed in Europe and are showing positive results. 3) In Korea, interests on animal passages have been rising recently. The ministry of Environment and local authorities are establishing development plans for the passages. However, practical materials on the usefulness of adoped methods are not available.4) In order to create an effective wildlife passage, decisions have to be made first on basic factors of planning and designing such as ecosystem rehabilitation methods and surveys on wildlife movement routes and habitat environment. Based on this, in a planning and designing stage, the location and type of a passage, size and measures to attract animals and prevent a collision need to be finalized. This should be followed by a series of process of maintenance, management and monitoring after the development. Based on the results of a theoretical study to develop an wildlife passage, Part 2 of this study deals with the results of an experiment through a specific planning and design that includes a process of ecological surveys, site selection, type selection, ecosystem infrastructure, planting design and construction details on an actual study area and presents them as a model project.

  • PDF