CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

Improving the Accuracy of Early Stage Cost Estimation in Apartment Construction Project (공동주택 프로젝트의 초기 공사비 예측정확도 향상에 관한 연구)

  • Lim, So-Yean;Yeo, Sang-Gu;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.143-147
    • /
    • 2010
  • Due to the diversification and complication of construction projects, controlling risks from the early design-planning phase gives huge impact on success of the construction project. As a part of managing uncertainties it is also important to estimate the project cost several times. Especially, estimating project cost in the early stage gives effects on making a budget for projects. This study estimated the apartment project cost using case-based reasoning(CBR), which is the process of solving new problems based on the past problems. For this, we deduced the apartment cost influence factors which can be gathered in the early stage of project. Based on the factors we established the database for apartment project and calculated the attribute value, attribute similarity and case similarity. Although we retrieve the most similar case from the database, it is very hard to utilize it directly due to the uniqueness of each project. So, Genetic Algorithm(GA) was applied in revising the cost of the retrieved-case. Therefore, the accuracy of the prediction was improved by GA optimization.

  • PDF

A Study on Space alteration by User's Independent Management in Children's Library (어린이도서관에 있어서 이용자의 자주적 관리에 의한 공간변화에 관한 연구)

  • Cheon, Hye-Sun;Lee, Jeong-Mi;Kwack, Dong-Wha;Lim, Che-Zinn;Lee, Sang-Bok
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • This study is including the independent project, "building children's library of the town" that is conducted by a local resident. The study object is the contents of the "design workshop for library planning" and the general process during one year since the opening. This study is delivering "information of children's library" through the work-shop and is conducting the role of a professional space planner by measuring the blueprint. Thus, the study could be conducted with synthetic viewpoint on each library. The followings are the results from the study. First, there were various space operations and a variety of programs in the case library that is independently managed. This is directing to "the constructive and active space usage" by the users and finally results in positive circulation. Secondly, there is a change through the process of execution and operation in the library construction plan. There are needs for the flexible space expansion and adjustment, modifiable furniture layout and design and various keeping areas because there is on-going tendency of corresponding space change. The third, the author could draw more practicable consideration points for space planning by looking at the trend of space change in Transactionist viewpoint. Thus, this study is very meaningful in terms of planning of sustainable public areas.

A Study on the China Urbanization Policies in Jingjingi Region and the Planning Characters for New City Center Design - Focused on the New City Center Development Projects in Rural Area near the Periphery of Metropolitan - (중국 징진지 지역의 도시화 정책과 계획특징 연구 - 수도권 주변 농촌 지역의 신도시 개발계획안을 중심으로 -)

  • Kim, Juntaek;Chung, Kumho
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.22 no.2
    • /
    • pp.35-42
    • /
    • 2020
  • The new urbanization is one of prestige growth engines to lead the next generation of China economy, it promotes new sustainable urban development models guided by various planning polices to improve urban livability and sustainability in accommodation with economy, social, and environmental consideration. The expanding urban periphery to rural area should leverages existing assets, infrastructure, local context and plans as a showcase of environmental and economic balance in a responsibly high-density, green community designed to human development and ecological settlement. The Beijing Chaoyang District and Tianjin Binhai area are a strategic advancement in the policy of building one of the most powerful economic regions, the Bohai Rim. Recently released 'Jingjinji development plan' supports various urbanization policies and encourages sustainable developments including 2 significant city center projects which are under way in global attention. The study compared on the characters of development policies and the cutting-edge smart design strategies by which they are applied, the master plan of the Beijing Chaoyang District expansion plan and Tianjin Yujiapu CBD project embrace innovative sustainable technologies.

Building Commissioning Management Framework from the Case Study of Green Building (녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출)

  • Jeong, Jin-Hak;Park, So-Yeon;Song, Dong-Hun;Ahn, Yong-Han
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

The Study on Hydraulic Model Experiment of Discharge Channel and Spillway (여수토 방수로의 수리모형검시에 관한 연구)

  • 김시원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.8 no.2
    • /
    • pp.1124-1140
    • /
    • 1966
  • 'This hydraulic experiment have been practised Juk an Reservoir spillway and discharge 'channel which the province Kyong Buk was constructed and designed U. hook, for seizing all state of hydraulic. As result of the experimellt planning and making the model test, it has gained the necessary data at the amendment, projection of the most rational and economical result. 1. Project (1) Experiment project....1/30 of the discharge (2) project flood....0.01945 $m^3$/sec (rapidly) 2. Design Experiment It were sighted the water level for the nine point (L. & R. sides of No. O, L. & R. of No.1, L. side of NO.2, NO.3, No. 4 and NO.5), but it appeared each other that the lowest water level was 0.63 m at spillway (No.5) and the highest water level 0.735m less than planning water level O.75 m at No. 0. It was regarded as the phenomena appearing the difference from the calculation of the rational formular and coefficient of discharge. 3. Experiment examine E. ${\circled1}$ As a table (2) it had not a difference in comparision with design and was some lower value than design experiment's. E ..${\circled2}$) !twas same table (3) in a consequence of Experiment contracted Rocky cutting. E.${\circled3}$. ${\circled4}$ It was done amend.ment Experiment by elevating G.H. in only control point, but was not sure result as a table (2)(3)(4), and so it was changed largely in ${\circled5}$ Experiment. E. ${\circled5}$ Increasing water level was understanded to be proportion to $V^2$ in consideration of centrifugal force in the curve part and showed velocity contracting in curve the effect order's being regular in consequence of 1/6 sloped extending G.H. attached from 5 No. 0 to 1. 50 m, to S No. 0+5m. (S; discharge channel number).

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

A Cost-Based Interior Information Management for an Apartment Housing Project (원가기반의 공동주택 마감재 정보관리 방안 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Moon, Hyuk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.76-84
    • /
    • 2009
  • Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.

The Planning and Design for the Central Green Space in Residential Quarters

  • Wang, Shouzhuang
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.219-222
    • /
    • 2001
  • The planning of the central green space (residential park) in a residential quarter is an effective way of increasing public space in the process of urban development and urban renewal. It is regarded as an important technical project in the detail plan of a residential quarter in order to create a better environment in the residential quarters. The scale of a residential park, normally not less than 5000㎡, is defined according to the land-use conditions and the local population. The site should have easy access for the residents, and fit into the surrounding landscape and Fengshui whenever possible. It should also satisfy various leisure needs of the local residents at all ages. The design of the park should be friendly to the residents'interests, hobbies and aspirations. The artistic style of the landscape is to emphasize on delightfulness, harmony and warmness.

  • PDF

An Elementary Introduction on Parks and Green Space Planning that Keep in Step with Urban Development

  • Jing Zhang;Jun Li
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.45-50
    • /
    • 2004
  • Confronting with series of environmental problems. caused by urbanization and the constantly improving consciousness of the entire society towards environmental protection, it has become an inevitable trend to develop parks and green space planning that guided by the principle of 'respecting nature, preferring ecology' and integrate function, arts and culture of landscape design. Aiming at specific project, humanized design should be laid stress on. With fundamental functional construction serving as the base, the reflection of cultural content and regional landscape as the characters, using various landscape gardening elements reasonably to enrich space design as well as highlighting leisure and sport function and following the concept 'human-centered', parks and green space filled with natural vitality and cultural spirit can be constructed, people, city and the nature could develop together in harmony.

  • PDF