The Study on Hydraulic Model Experiment of Discharge Channel and Spillway

여수토 방수로의 수리모형검시에 관한 연구

  • Published : 1966.12.01

Abstract

'This hydraulic experiment have been practised Juk an Reservoir spillway and discharge 'channel which the province Kyong Buk was constructed and designed U. hook, for seizing all state of hydraulic. As result of the experimellt planning and making the model test, it has gained the necessary data at the amendment, projection of the most rational and economical result. 1. Project (1) Experiment project....1/30 of the discharge (2) project flood....0.01945 $m^3$/sec (rapidly) 2. Design Experiment It were sighted the water level for the nine point (L. & R. sides of No. O, L. & R. of No.1, L. side of NO.2, NO.3, No. 4 and NO.5), but it appeared each other that the lowest water level was 0.63 m at spillway (No.5) and the highest water level 0.735m less than planning water level O.75 m at No. 0. It was regarded as the phenomena appearing the difference from the calculation of the rational formular and coefficient of discharge. 3. Experiment examine E. ${\circled1}$ As a table (2) it had not a difference in comparision with design and was some lower value than design experiment's. E ..${\circled2}$) !twas same table (3) in a consequence of Experiment contracted Rocky cutting. E.${\circled3}$. ${\circled4}$ It was done amend.ment Experiment by elevating G.H. in only control point, but was not sure result as a table (2)(3)(4), and so it was changed largely in ${\circled5}$ Experiment. E. ${\circled5}$ Increasing water level was understanded to be proportion to $V^2$ in consideration of centrifugal force in the curve part and showed velocity contracting in curve the effect order's being regular in consequence of 1/6 sloped extending G.H. attached from 5 No. 0 to 1. 50 m, to S No. 0+5m. (S; discharge channel number).

Keywords