• 제목/요약/키워드: Design Project Planning

검색결과 584건 처리시간 0.028초

학교 복합화를 위한 법적 가능성 및 대상시설에 관한 건축계획 연구 (A Study on the Legal Possibility of Mixed-Use School and the Architectural Planning of the Mixed-Use School facilities)

  • 문종덕;최병관
    • 대한건축학회논문집:계획계
    • /
    • 제35권6호
    • /
    • pp.21-26
    • /
    • 2019
  • This study is to investigate the possibility of legislation that is the foundation of school complexation project and the architectural planning for the target facility as stipulated by related law. Since 2000, many schools have been established and operated in the whole of Korea, mainly in Seoul. However, on the frontline, there is still a lot of difficulty in carrying out the project due to the legal possibility related to the school complexation and the lack of understanding about the facility for school complexation as stipulated by the law. The purpose of this study is to present the possibility of the school complexation project based on related laws and to clarify the classifications of school complexation facilities which are stipulated by the related law, and to propose the foundation for the future school complexation project. The contents of this study were investigated through the literature survey on the theoretical review and related laws of school complexation, and various laws related to school complexation were classified based on this, and the possibility of school complexification prescribed by each law was analyzed. In addition, by classifying facilities subject to school complexation prescribed by the Act and analyzing the detailed standards stipulated in relevant laws for each facility, we propose the facilities that can be combined with school facilities, and utilize the data of this study.

소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계 (Design of maturity model for software project management level evaluation)

  • 전순천
    • 한국항행학회논문지
    • /
    • 제15권4호
    • /
    • pp.609-615
    • /
    • 2011
  • 최근 공공기관 및 금융권에서는 경쟁력 향상을 위한 정보시스템의 통합으로 프로젝트 규모가 대형화되고 있으며, 프로젝트 수도 나날이 증가하고 있어 적절한 소프트웨어 프로젝트 관리 방안이 필요하다. 그러나 프로젝트 관리 영역간의 미치는 영향에 대하여 체계적인 연구가 부족하였다. 따라서 본 연구는 선행 연구를 통하여 프로젝트 관리에 중요한 영역을 도출하였고, "범위, 일정, 품질, 인력, 위험"의 각 영역들 간의 상호 미치는 영향도 분석과 각 영역의 진행 상태를 계획, 실행, 완료 단계로 구분하여 수행도를 분석하였다. 이 영향도와 수행도의 결과를 분석하여 프로젝트 관리 수준을 평가하는 모델을 제시하였다.

친환경 실외 놀이터 계획 요소에 관한 연구 (A Study on the Planning Elements for Eco-friendly Outdoor Playground)

  • 김자경
    • 한국실내디자인학회논문집
    • /
    • 제22권2호
    • /
    • pp.120-130
    • /
    • 2013
  • Since Seoul city supplied 'Sangsang Children's Playground', domestic playgrounds are changing from formal facilities to creative play and learning space recently. From eco-friendly safe playground model development project, eco-friendly playground planning and its actual cases have been occasionally introduced. However, we could not know how well most playgrounds reflect eco-friendly features and whether they are eco-friendly or not because the definition about the concept of eco-friendly playground is inadequate and there are not the specific planning guidelines and evaluation standards for making the eco-friendly playground. Therefore, the development of guidelines for the construction of eco-friendly playground is required and evaluation guidelines for them should be made for the active dissemination of the actual eco-friendly playground and the proper construction of the eco-friendly playground. In this study, we defined the concept of eco-friendly outdoor playground and presented the types and characteristics of the playground based on the concept and suggested basic plan guidelines based on the existing requirements for becoming eco-friendly playground. For this purpose, we checked the plan's common points in the existing playground configuration requirements, installation standards, regulations, and safety standards, and offered the planning elements and guidelines through the analysis of outdoor space evaluation standard in eco-friendly safe playground guidelines and eco-friendly building certification system.

가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델 (Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information)

  • 곽수남;김두연;김병일;최석진;한승헌
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.87-100
    • /
    • 2009
  • 공공사업에서 사업초기단계의 개략공사비 예측은 발주자에게 향후 공사비에 대한 정보를 제공함으로써 효율적인 예산수립을 가능하게 한다. 하지만 사업초기단계는 획득 가능한 정보량이 부족하기 때문에 상대적으로 정확한 공사비 예측이 어렵다. 현재 국내 발주기관에서 활용하고 있는 도로공사 개략공사비 산정체계는 단순하게 단위길이 당 단가에 도로의 연장을 곱하는 선형적인 모델이기 때문에 공사비 예측에 오차가 크게 발생하는 것으로 나타났다. 또한 사업의 진행에 따라 가용정보의 수준이 달라지기 때문에 개략공사비 예측모델에는 이러한 가용정보의 특성이 반영되는 것이 중요하다. 본 연구에서는 사업 초기단계를 크게 기획단계와 설계 초기단계의 두 단계로 구분하여 각 단계의 가용정보 수준 및 공사비 예측의 목적을 고려한 개략공사비 산정모델을 제시하였다. 공사비 예측모델의 개발을 위하여 총 143건의 공사 데이터를 수집하여 활용하였으며, 이를 통해 각 단계의 가용정보 수준에 적합한 공사비 영향변수를 도출하였다. 제안된 기획단계 및 설계초기 단계의 개략공사비 산정모델은 검증과정을 통하여 각 단계에서 요구되는 정확도 수준을 확인하였으며, 이러한 가용정보 수준에 입각한 개략공사비 산정모델은 향후 예산 산정업무나 타당성 조사, 노선 대안 비교검토 등에 활용될 수 있을 것으로 기대된다.

Hull Form Design for Baltic Ice Class Aframax Tanker

  • Park Kyung-Duk;Son Jin-Soo
    • Journal of Ship and Ocean Technology
    • /
    • 제9권2호
    • /
    • pp.29-36
    • /
    • 2005
  • A hull form of Baltic ice class IA Aframax tanker has been developed taking into consideration of powering performance in brash ice channels based on IA class rules. Speed performance of the ship hull form in normal seagoing has been validated through model tests in a towing tank. The hull form design developed in this work has demonstrated good speed performance in normal seagoing although the ship design is entitled to ice class IA.

수도 서울에서 정부종합청사의 입지와 건립 (Site and Erection of the Government Complex Seoul in Capital Seoul)

  • 이수민;우동선
    • 건축역사연구
    • /
    • 제27권2호
    • /
    • pp.51-62
    • /
    • 2018
  • This study examines the site and erection of the Government Complex Seoul which was a project attempted to assemble dispersed government buildings in a certain place. The study focuses on the fact that the project is situated between the 1960s' making of capital Seoul and Seoul urban planning, and the way how the project achieved symbolism in capital Seoul. The project, one of the 1960s' Major Government Buildings, led both plan of capital Seoul and transforming city Seoul. The 1960s' Major Government Building Plan had identical drive with the 1950's Major Government Building Plan, however the 1960s' had additional layer: Seoul urban planning. After restoration of the Capital building, Sejongro the capital street was planned to the site arranging government offices. The Government Complex Seoul was set to be a modern building on a site with historical context according to the plan. Because of the site, the Government Complex Seoul was constructed in aware of other buildings that represented a competitive high-rise atmosphere in the late 1960s, including the Capital building nearby. PAE International's plan was completed through a series of design modification, and it boasted a vertical aspect, unlike the horizontal-looking plan that was already won after the design competition. The Government Complex Seoul tried to acquire the symbolism in the central space of the capital Seoul and high-rised city Seoul. "The new construction method" was a requirement to achieve the height.

R & D 프로잭트의 Feasibility 추정 시스템설계를 위한 추정치 종합화 모형의 구축 (A New Model on Integration of Feasibility Estimates for Designing FEIT System in R & D Project)

  • 권철신
    • 한국경영과학회지
    • /
    • 제15권1호
    • /
    • pp.47-61
    • /
    • 1990
  • The purpose of this study is to construct a new model named Communication Consensus Value Weighted (CCVW) model based on inter-personal technical communication within a project team, and to design Feasibility Estimates Integrated Terminal System (FEITS) which is a subsystem of R & D Project Planning System/System Alternatives Feasibility Estimation System (RDPPL/SAFES) using the model as a key function for feasibility estimation in that system. This new model aims to integrate technical feasibility estimated by several estimators in the lowest level as the project work breakdown structure which is the indentical conception of a terminal system in RDPPL. The process to obtain the feasibility estimate integrated is presented in this paper.

  • PDF

시스템공화 전산지원도구를 이용한 시스템 설계 및 관리 데이터의 통합 (Integration of System Design and Management Data Using CASE Tool)

  • 이우동
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 B
    • /
    • pp.1097-1098
    • /
    • 2006
  • This study investigated the needs and effectiveness of the application of Computer-Aided Systems Engineering Tool in order to enhance the chance of success of the large and complex system development projects like City Train System. Furthermore, it was shown that the merits of Systems Engineering and Project Management must be complementary to each other in their interaction in a project. Especially, for the project plans must be executed based on the fully understood system being developed, the technical and management data of the system development need be integrated and be able to support exact and rapid decision making of project planning. As an alternative solution approach, a model for development knowledge capture integrating both technical and management data of system development was proposed using Computer Aided Systems Engineering tool-Cradle.

  • PDF

시스템 다이내믹스를 이용한 건설성과 인과지도 개발 (Development of a Construction Performance Causal Map Using System Dynamics)

  • 강진영;박희성
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

Brief description of the Design and Construction of the Burj Dubai Project, Dubai, UAE.

  • Abdelrazaq Ahmad K.
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(I)
    • /
    • pp.9-14
    • /
    • 2005
  • The Burj Dubai Project will be the tallest structure ever built by man; when completed the tower will be more than 700 meter tall and more than 160 floors. The early integration of aerodynamic shaping and wind engineering considerations played a major role in the architectural massing and design of this residential tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria. This paper presents a brief overview of the structural system development and considerations of the tower and discusses the construction planning of the key structural components of the tower.

  • PDF