• 제목/요약/키워드: Design Change Management

검색결과 1,094건 처리시간 0.028초

PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발 (Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management))

  • 임형철;최철호;진상윤;김재준;이광명;윤수원
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

실내 미생물 안전을 위한 면역건물기술 인자들의 상호작용에 관한 연구 (A Study of factor analysis of immune building system for microbiological safety)

  • 최상곤;장성민
    • 대한안전경영과학회지
    • /
    • 제14권3호
    • /
    • pp.85-92
    • /
    • 2012
  • In this study the real situation of apartment house in seoul is reproduced with multi-zone modeling program contam2.4. This model include immune building system(disinfection system) which is consist of dilution, Filter Technology and UVGI(ultra violet germicidal irrdiation). In this study experiments design method used for estimating interaction of HRV air change rate, UVGI air change rate and UVGI grade. Result show that HRV air change rate and UVGI air change rate is most influence factor for remove rate. also Interaction of HRV air change rate and UVGI air change rate is ost influence factor for remove rate.

청소년의 자세 교정을 위한 감성 공학적 셔츠 디자인에 관한 연구 (A study on shirts design for postural stability of teenagers considering human sensibility ergonomics)

  • 방혜경;임영문
    • 대한안전경영과학회지
    • /
    • 제17권1호
    • /
    • pp.139-148
    • /
    • 2015
  • For design research of teenagers' posture correcting shirt, postures of teenagers were analyzed and became the base of inventing suitable patterns. The subjects of this study were 198 of both female and male middle school students from the city of Seoul. Students' postures in classroom and length change of body surface were observed and analyzed; based on this, total of 5 postures was selected, and length changes of body surface were applied. The patterns in this study were designed with stretch material to help antagonism by muscle movements. Each fabric that was used in this study had 110% of stretch, 120~140% of stretch, and 150~170% of stretch. Both of one-way-fabric and duplex-fabric were used in this study, depending on application site.

관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구 (A study on the integrated data modeling for the plant design management system and the plant design system using relational database)

  • 양영태;김재균
    • 한국해양공학회지
    • /
    • 제11권3호
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

야드형 AGV-서스펜션 파라미터의 최적화를 위한 충격하중 해석 (Analysis of Impact Load for Optimum of Suspension Parameter of Yard AGV)

  • 홍도관;김재헌;안찬우;전언찬;김중완
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2002년도 추계공동학술대회논문집
    • /
    • pp.161-167
    • /
    • 2002
  • Cai-go management facility of harbor are required an expansion due to increase of cargo quantity. Design technology of Yard AGV call be possible to deal many cargo rapidly and accurately. So it is produced a profit about cal-go management. This study is presented optimum of suspension parameter for design technology Yard AGV. Model I, II are modeled about Initial of container weight, height. When the maximum stroke of suspension is 0.26m, optimum is achieved to reduce the reaction force at the minimum. Also, the reaction force is study to become stability in I second. A change of spring constant and coefficient of damper make change the reaction force and minimum reaction force appear in optimum value. All modeling and analysis are used combination. contact element of Ansys program.

  • PDF

고속도로 주행속도 변화에 영향을 미치는 도로기하구조 특성분석 : 제한속도 상향전후 비교를 중심으로 (Characteristics of Geometric Conditions Affecting Freeway Travel Speed : Focused on Speed Limit Change)

  • 홍성민;오철
    • 한국도로학회논문집
    • /
    • 제16권5호
    • /
    • pp.83-90
    • /
    • 2014
  • PURPOSES : The purpose of this study is to identify the factors affecting the effectiveness of speed limit change that is defined as the amount of increased travel speed. METHODS : A ordered logit model was adopted to analyze the relationship between the change in travel speed and contributing factors. A stretch of Kyungbu freeway was selected for the analysis because the Korea expressway corporation has raised speed limit from 100km/h to 110km/h since September 1st in 2010. RESULTS : The results showed that geometric design elements, speeding cameras, and section length were identified as factors contributing the effectiveness. Contributing geometric design elements include the number of horizontal curves and vertical curves that do not meet the design requirement with 110km/h speed limit. CONCLUSIONS : The outcome of this study will be used for establishing various traffic operations and control strategies for freeway speed management.

수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현 (Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments)

  • 전규환;장길상;박창권
    • 문화기술의 융합
    • /
    • 제7권4호
    • /
    • pp.879-892
    • /
    • 2021
  • 수주생산 환경에서 제조업체의 견적정보는 다양한 고객요구에 대응하여, 프로젝트의 입찰, 수주, 그리고 생산할 제품의 기초정보로 사용하는 중요한 정보이다. 이 견적정보는 고객요구, 제품생산 환경의 변화, 기술제휴사의 도면정보 변경, 그리고 제품의 기술 개선 등의 여러 요인에 의해 변경된다. 이러한 변경으로 인하여, 제조사가 고객의 요구사항을 반영하여 작성중인 견적정보에 다양한 변경이 발생한다. 이러한 다양한 변경요인에 따른 견적정보의 변경은 수주생산 기업의 입장에서 견적관리업무에 많은 부담을 주고 있다. 특히, 견적의 변경요인으로 인한 견적정보 변경은 고객중심의 주문생산 환경에서 고객의 요구사항에 의해 불가피하고 빈번하게 발생한다. 본 논문에서는 견적생성 프로세스를 기준으로 견적변경 프로세스를 제시하고, 일관적이고 효율적인 견적변경처리 방안을 제시하고자 한다. 이를 위하여, 견적의 변경이 발생하는 요인을 정의하고, 각 요인에 대한 변경유형을 정의하였다. 그리고 견적변경에 대한 발생 요인별 사례를 통하여 견적변경 프로세스가 견적관리시스템에 적용되는 과정을 보여준다. 또한 제안된 견적변경 요인, 견적변경 유형, 견적변경 프로세스, 그리고 견적체계 관리의 유용성을 보여주기 위하여, 고객 중심의 수주생산기업인 'H'사의 선박엔진 부문의 통합 견적관리시스템에서의 견적변경처리 기능 및 절차에 적용하였다. 그 결과, 견적변경 요인에 따른 견적변경 처리 및 관리가 효율적으로 수행됨을 확인하였다.

민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로 (A Study on the Improvement of Total Cost Change Control in Private Investment Projects)

  • 김세종;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.119-126
    • /
    • 2001
  • 국내에서 대규모로 진행되고 있는 민간투자사업의 시행에는 많은 난제들이 산재해 있으며, 특히, 민간의 창의와 효율성을 극대화하고자 $\lceil$사회간접자본시설에 대한 민간투자법$\rfloor$ 에 명시된 총사업비 사전확정 및 사후정산 금지규정은 사업비변경과 관련하여 정부와 사업시행자간 분쟁의 요소를 제공하고 있다. 본 연구에서는 민간투자사업의 총사업비 변경에 관련된 문제점들을 파악하고, 그의 개선을 위한 총사업비변경 관리방안을 사업관리요소인 계약·조직·정보·비용·공정관리의 틀로서 접근, 분석하였다. 계약관리의 측면에서 실시협약 관련조항의 표준안을 구축하고, 조직관리의 측면에서 업무범위를 명확화한 업무플로우를 수립하고자 하였다. 아올러 정보관리의 측면에서 설계서 변경관리의 효율화를 위한 도면, 문서관리시스템(DMIS)을 제안하고, 비용·공정관리의 측면에서 실공정과 일치되는 통합 내역관리방안을 제시하고자 하였다.

  • PDF

휘트니스센터의 실내 환경계획에 관한 연구 (Research on the Interior Circumstance Planning of a Fitness Center)

  • 조영연
    • 한국실내디자인학회논문집
    • /
    • 제41호
    • /
    • pp.155-162
    • /
    • 2003
  • The factors to limit interior circumstance and the expression of the space start In the point how to provide the order in the interior space according to the intention of design. The controlling of the natural and artificial surroundings should be focused by synthesizing and analyzing the condition of circumstance, function, and emotion to provide the comfortable room to a customer in a fitness center. A fitness center aiming at the future requires various function according to it's role depending on the change of the social values. In addition, the fitness center reflecting the various regional culture according to the change of values requires the expansion of the cultural and life space. The characteristics of fitness space like this affects the mental effect of a customer with the color and quality of the materials suitable for the characteristics of grouping, continuity, symbolism, and generation as well as the unification in the total design and the simplicity of maintenance and management. The paper aims to extract factors related to the circumstance plan of the interior and to suggest it's application in the interior design. The design applicable to the circumstance plan of the interior will keep changing according to the social change and the change of the understanding along with the factors. The continuous research on the interior circumstance planning of a fitness center could be approach to develop in a systematic method and the paper will be expected to be a little step toward it.