• Title/Summary/Keyword: Design & Construction management

Search Result 2,189, Processing Time 0.027 seconds

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF

An Analysis on the Problems of General Conditions for Domestic Design-Build Construction Projects (국내 설계${\cdot}$시공일괄발주방식을 위한 공사계약 일반조건의 문제점 분석)

  • Seo Young-Min;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.303-306
    • /
    • 2003
  • Although design-build construction projects have recently increased. general conditions of construction contract are not reflecting the characteristic of design-build construction projects neither performing its fundamental roles as implying many claim elements. So. this study aims to propose the basis for improving the general conditions of the domestic design-build construction projects. This study reviews literatures associated with design-build construction contract and analyses domestic general conditions into foreign standard forms of general conditions. Additionally, it is examined the problems of design-build construction contracts and performed questionnaire survey to the practitioner in the construction contract field. In doing so, this study suggests the direction for improving general conditions of domestic design-build construction projects.

  • PDF

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

EFFECTS OF ADOPTING KMS BASED BUSINESS PROCESS MANAGMENT IN DESIGN COMPANIES IN KOREA

  • Jin-Won Hwang;Hyung-Won Choi;Doo-Won Hwang;Young-Woong Song;Hyong-Chul Lim;Yoonki Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1030-1035
    • /
    • 2009
  • The value of intangible assets of a company attracts attention in enterprise management environment drastically changing. Following such a trend, many companies have adopted knowledge management. Especially in construction industry of which success of a project is easily affected by the capacity of various participants and work performers, we may find many cases to which the knowledge managements have been adopted. However, the domestic design companies have tended to be late to introduce the knowledge management or have difficulty in effective use of KMS already constructed. This study suggests KMS based on BPM (Business Process Management) and drives its effects to improve problems mentioned above. We drives the expected effects by studying the existing studies and surveying domestic design companies and suggests Prototype for introducing a real system.

  • PDF

Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase (녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석)

  • Lee, Duhwan;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.103-112
    • /
    • 2020
  • In this study, based on actual project implementation cases, task management plans for construction management related green building certification were derived in major stages. Accordingly, the importance from details of construction management tasks for the operation and management process of the schematic design phase, design development phase, and construction document phase, focusing on G-SEED certification, was analyzed. In addition, major items were derived based on the weight of additional construction costs and acquisition scores through previous research cases on the analysis of construction costs for G-SEED certification, and the importance from details of construction management tasks on the major items of G-SEED certification was analyzed. As a result, the review and confirmation of the elements of reflection related to G-SEED in the schematic design phase, the adequacy of design documents and the connectivity of design phase in the design development phase were important. And the review and confirmation of the items directly related to the construction phase in the construction document phase were important.

AUTOMATED HAZARD IDENTIFICATION FRAMEWORK FOR THE PROACTIVE CONSIDERATION OF CONSTRUCTION SAFETY

  • JunHyuk Kwon;Byungil Kim;SangHyun Lee;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.60-65
    • /
    • 2013
  • Introducing the concept of construction safety in the design/engineering phase can improve the efficiency and effectiveness of safety management on construction sites. In this sense, further improvements for safety can be made in the design/engineering phase through the development of (1) an automated hazard identification process that is little dependent on user knowledge, (2) an automated construction schedule generation to accommodate varying hazard information over time, and (3) a visual representation of the results that is easy to understand. In this paper, we formulate an automated hazard identification framework for construction safety by extracting hazard information from related regulations to eliminate human interventions, and by utilizing a visualization technique in order to enhance users' understanding on hazard information. First, the hazard information is automatically extracted from textual safety and health regulations (i.e., Occupational Safety Health Administration (OSHA) Standards) by using natural language processing (NLP) techniques without users' interpretations. Next, scheduling and sequencing of the construction activities are automatically generated with regard to the 3D building model. Then, the extracted hazard information is integrated into the geometry data of construction elements in the industry foundation class (IFC) building model using a conformity-checking algorithm within the open source 3D computer graphics software. Preliminary results demonstrate that this approach is advantageous in that it can be used in the design/engineering phases of construction without the manual interpretation of safety experts, facilitating the designers' and engineers' proactive consideration for improving safety management.

  • PDF

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

A Framework of Function Analysis for the Construction Robotics Design

  • Yi, Chang-Yong;Park, Young-Jun;Park, Jin-Young;Park, Chan-Young;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.370-374
    • /
    • 2022
  • Construction is a labor-intensive industry that heavily relies on skilled construction workers. However, the aging of the workforce is rapidly growing, and the shortage of skilled workers is intensifying. The application of construction robotics technology can solve the problem of workforce shortage and guarantee construction productivity, safety, and quality improvement. This study presents a framework of the functional analysis for construction processes and work tasks that classifies and analyzes processes and work tasks for construction robotics design. The framework presents the functional analysis process, which analyzes workers' attributes and identifies functions of construction robotics.

  • PDF

Development of Requirement Taxonomy for Design Bases Management during NPP lifecycle (원전 생애주기간 설계기준 정보관리를 위한 요건 분류체계 개발)

  • Kim, Jong-Myeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.134-135
    • /
    • 2018
  • Nuclear Power Plant consists of about 1.4 million facilities. and the design standards and design requirements for the continuos utilization and safety of facilities are complexly connected with the facilities. When a design change for facilities or design requirements is occurred at the time of construction or operation, there are a lot of facilities, design requirements, and design bases that are affected by the facilities or design bases being changed. The above design changes are so complex that the existing document-bases design change process is time-consuming and may also cause human error. In this study, we developed a design requirement taxonomy that can be applied to the data-centric design bases document that can improve it. To do this, we analyze the design elements from the highest level to the lowest level applied to the nuclear power plant, and classify the design elements according to the characteristics of the design elements.

  • PDF