Earth Anchor method as a supporting system is widely used in the large scale deep excavation of urban areas or slope excavation project. Considering the application frequency of that method and catastrophe of that method under unproper construction management, we can find out many problems relevant to the domestic design and construction management of earth anchor method. When we encounter the cases of rapid increments and various decrements in earth anchor axial forces, considering the characteristic of earth anchor method, it is an essential point to catch the reasons and to prepare countermeasures. This article introduces two actual monitoring examples based on the close analyses of measured data in a typical large scale deep excavation project and slope excavation project. One is a rapidly increasing case of earth anchor axial forces with the continuous advance of incremental deformation in a geological layer interface. And another is a decreasing case of earth anchor axial forces with the construction conditions. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.
The 5th International Conference on Construction Engineering and Project Management
/
pp.386-389
/
2013
Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.
최근 수주 물량의 급격한 감소, 업체의 무분별한 난립, 해외시장 진출의 어려움과 같은 외부적 환경 요인은 건설업체로 하여금 경쟁력 강화를 위한 자체적인 체질 개선을 요구하고 있다. 이에 대응하여 대형건설업체를 위주로 다양한 경영 혁신이 시도되고 있으며, 정보시스템의 구축을 통해 업무 효율과 회사 전체적인 생산성 향상을 위한 노력이 이루어지고 있다. 이러한 여러 가지 노력은 사업구조의 개편이나 업무 프로세스의 개선 등을 수반하게 마련이지만, 업무를 수행하는 당사자인 조직과 구성원에 대한 고려가 상대적으로 미흡한 것이 사실이다. 본 연구에서는 기업의 성과에서 조직이 차지하는 중요성에 대한 인식을 바탕으로, 건설업체 내 현장 조직이 가지는 변화의 가능성과 그 방향을 검토하였으며, 현장 관리업무 프로세스를 대상으로 관리혁신에 의한 조직 재설계 방안을 논의하였다.
The disaster and safety accidents in any construction site occur inevitably. Since the on-site disaster and accident occurrence became one of major concerning factors in construction site, architects & building executers have been flooded with safety management advices. The purpose of this paper is to survey and analyze the effect of the application of Safety Patrol Management System(SPMS) upon the reduction of disaster & accident occurrences in construction site. In order to estimate and reduce the disaster and accident ratio in construction site, various surveyed data has been analysed. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.
Purpose: It is necessary to establish more systematic and efficient accident prevention measures in relation to the promotion of safety activities to prevent safety accidents of foreign workers at construction sites, especially as safety accidents of foreign workers continue to occur among industrial accidents occurring at domestic construction sites. In this study, I would like to suggest ways to respond to legal issues related to the recruitment of foreign workers and ways to promote safety management that can effectively reduce industrial accidents through various safety management measures. Research design, data and methodology: In order to establish systematic safety management measures for foreign workers, in-depth research was attempted by collecting and analyzing various data such as the current status of domestic industrial accidents, employment status of foreign workers, and disaster statistics. Results: In addition, I intend to establish and present a more systematic safety management plan by conducting various analysis and feasibility review such as risk assessment education in terms of accident prevention for foreign workers. Conclusions: By establishing and presenting more systematic management measures, such as foreign employment, employment by occupation, and on-site education, this safety management system can effectively prevent accidents for foreign workers and is expected to contribute to the prevention of accidents at domestic construction sites for both construction companies and construction officials.
The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.
건설프로젝트에서 현재 사용되고 있는 작업분류체계(Work Breakdown Structure)는 프로세스 내의 세부작업간 선·후행 관계의 불확실성과 작업의 불합리한 상호 연계성에 기인한 문제점을 내포하고 있다. 이를 해결하기 위해서 본 논문에서는 Work Structuring을 제시하여 프로세스간에 투명성을 부여하고 세부작업간의 간섭을 제거시켜 작업신뢰성을 향상할 수 있는 방안을 도출하였고 프로세스를 개선하기 위한 프로세스 디자인 다이어그램을 개발하였다. WS에 의한 프로세스 개선의 목적은 고객에게 가치를 창출시켜주면서 보다 신속하고 신뢰성 있는 작업 흐름을 만드는 것을 목적으로 하고 있으며 비가치 창출작업의 감소, 프로세스의 명료화 및 투명성 향상 등에 의의가 있다.
The 3th International Conference on Construction Engineering and Project Management
/
pp.331-337
/
2009
This paper summarizes some of approaches that could be taken for data exchange in a non-interoperable work environment and reports lessons learned from the Dongdaemun Design Plaza and Park project. Today's widespread application of building information modeling (BIM) to the construction and architectural design industries requires a change in the cooperation between business organizations and their methods of communication. In particular, the interoperability of information between interdisciplinary organizations, which use specific programs for different purposes, has become a critical issue. More than just a technical problem, it is also highly related to an organization's collaboration culture and the particulars of a specific project. This paper describes the interoperability issue that occurred during the construction documentation phase of the irregularly shaped building project, Dongdaemun Design Plaza and Park, designed by Zaha Hadid Architects and Samoo Architects and Engineers, from the perspective of the technological problem and the collaborative organizations' communications. Although the perfect compatibility of information is not possible, this paper deals with a practical approach to the interoperability issue by examining the way the end-users of computer-aided design (CAD) resolved the interoperability problems in practice.
원자력발전소는 총 사업비 약8.6조, 사업기간 10년 이상이 소요되는 대형 국가기반사업이며, 60년 이상 운영되는 국가경제 및 국민의 안전과 밀접한 시설이다. 따라서 설계, 건설, 운영 등 프로젝트 일련의 과정에서 정확하고 경제적 의사결정이 가능하도록 정확한 정보와 일관된 물리적 형상이 유지되어야 한다. 하지만 원전산업은 다른 산업에 비해 복잡하고 규제가 많아 일찌감치 형상관리의 중요성이 널리 인식되어왔지만, 목적과 주체가 명확하지 않아 체계적인 형상관리에 한계가 있었다. 따라서 본 논문은 많은 격실로 이루어진 APR1400을 설계요건과 형상정보를 반영한 실(Room)기반 데이터베이스 구축 방안을 제시하였다. 실 속성을 구분하는 4가지 요소를 선정하였으며, 이를 기반으로 한 데이터베이스를 활용하여 완성도 높고 체계적인 원자력발전소의 형상관리 체계 활용에 일조하고자 한다.
Lee, Junsoo;Kim, Kang Hyun;Cha, Seung Hyun;Koo, Choongwan
국제학술발표논문집
/
The 8th International Conference on Construction Engineering and Project Management
/
pp.485-492
/
2020
Information on the energy consumption of buildings that can be obtained through conventional methods is limited. Therefore, this study aims to develop a model that can support decision making about building facility management through digital transformation technologies. Through the IoT sensor, the building's energy data and indoor air quality data are collected, and the monitored data is visualized through the ELK Stack and produced as a dashboard. In addition, the target building is photographed with a 360-degree camera and maps using a tool to create a 360-degree tour. Using such digital transformation technologies, users of buildings can obtain various information in real time without visiting buildings directly. This can lead to changes in actions or actions for building management, supporting facility management decisions, and consequently reducing building energy consumption.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.