• 제목/요약/키워드: Design & Construction management

검색결과 2,189건 처리시간 0.032초

실내수영장 공조관리 요인이 시설물 결로원인과 예방에 미치는 영향 (The Effects of HVAC Management on Condensation Cause and Prevention in Indoor Swimming Pools)

  • 성하동
    • 대한안전경영과학회지
    • /
    • 제20권2호
    • /
    • pp.9-20
    • /
    • 2018
  • This study is empirically intended to look into the effects of HVAC management on condensation cause and prevention in indoor swimming pools. The findings are summarized as follows. First, the experience of condensation in indoor swimming pools showed that 132 out of 142 people in total experienced the condensation in indoor swimming pools, which they had a high experience rate of 92.3%. For the location of condensation, the wall joints were 46.8% and the windows were 34.5%, which a total of 72.3% occurred in the wall joints and windows. Second, the effect of construction design, HVAC management and building construction on the cause of condensation in indoor swimming pools showed that building construction had an effect on the cause and location of condensation depending on the seasonal time, partially adopting hypothesis 1. Third, the effect of condensation-causing factors on condensation-preventing factors in indoor swimming pools showed that condensation had a close relationship with air and temperature conditions depending on the time and location of condensation, adopting hypothesis 2. As for the above-stated findings, the HVAC management in indoor swimming pools is an important concern factor that continues to cause condensation despite the development of advanced construction materials. Especially, building construction is a main factor that has a direct effect on condensation in the HVAC management of facilities. This implies that the window management is important in maintaining the wall joints - which can suppress the selective use and defect occurrence of construction materials - or confined spaces for a long time.

공공발주용역 실적 및 평가 관리 프로세스 개선에 대한 연구 (A Research on Improvement Scheme for Management Technique of Public Ordering Service Results and Estimation)

  • 이규성;이한규;김남곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.238-239
    • /
    • 2013
  • A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.

  • PDF

Aspects Of Architectural Design Using BIM Technologies

  • Tikhonova, Oleksandra;Selikhova, Yana;Donenko, Vasyl;Kulik, Mykhailo;Frolov, Denys;Iasechko, Maksym
    • International Journal of Computer Science & Network Security
    • /
    • 제22권1호
    • /
    • pp.85-92
    • /
    • 2022
  • In this article, we look at the application of BIM (Building Information Modeling) in sustainable infrastructures. In response to global warming, energy shortages, and environmental degradation, people are trying to build eco-friendly, low-carbon cities and promote eco-friendly homes. A "green" building is the entire life cycle of a building that includes maximizing the conservation of resources (energy, water, land, and materials), protecting the environment, reducing pollution, providing people with healthy, comfortable, and efficient use of space, and establishing harmony between nature and architecture. In the field of ecological and sustainable buildings, BIM modeling can be integrated into buildings with analog energy, air flow analysis, and solar building ecosystems. Using BIM technologies, you can reduce the amount of waste and improve the quality of construction. These technologies create "visualization" of digital building models through multidimensional digital design solutions that provide" modeling and analysis "of Scientific Collaboration Platforms for designers, architects, utility engineers, developers, and even end users. Moreover, BIM helps them use three-dimensional digital models in project design and construction and operational management.

화재안전기준(NFSC)에 따른 기계분야 소방설비 설계, 시공, 감리 유지관리 업무 표준화 방안에 대한 제안 (Proposals On The Designe, Construction, Management Maintenance standardization Method Of Mechanical Field Fire Protection System By NFSC)

  • 김성일;강경식
    • 대한안전경영과학회지
    • /
    • 제19권3호
    • /
    • pp.11-17
    • /
    • 2017
  • The study seeks to cooperate with the investigation of a fire investigation based on public-private partnership. Fire protection systems provide a wide variety of viewpoints from the perspectives of design, construction, management, maintenance, maintenance and maintenance systems at a particular point in time, construction, management, and maintenance systems. What is controversial is that there are illegal activities such as illegal activities of the Patent Office, misconduct of construction work and unreasonable construction of construction works.As a theoretical framework, the present study identified the four key elements of a successful disaster response system : responsiveness, control, professionalism, and bias.

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

A FUNDAMENTAL STUDY TO DEVELOP STANDARD TECHNOLOGY CRITERIA FOR IT-CONSTRUCTION FUSION TECHNOLOGIES, TO BE APPLIED TO A U-CITY

  • Kyoon-Tai Kim;Jae-Goo Han;Chang-Han Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1352-1358
    • /
    • 2009
  • As the demand for a convergence between construction technologies and IT is on the rise, as seen in the visualization of U-City construction, studies on the ways in which IT in should be utilized in the building and construction field have been continuously and actively performed. However, there has been almost no development of standardized technology criteria relating to the life cycle of a building (planning, design, construction, and maintenance). That is, there are almost no examples of efforts made to combine construction technology and IT in a fundamental way, considering the environment, the facility, its spatial characteristics, engineering, materials, and structure, aspects that are commonly required not only for interior spaces but also for exterior construction of U-City. Despite the fact that a state-of-the-art infrastructure has been built, and the competency of users with the cutting-edge technology, composite studies on technologies, facilities, services and spaces are still lacking, and basic research on the composite operation method including compatibility and linkage between facilities and services within a U-City has been insufficient as well. It is generally known that by fusing IT with construction technologies, the total period of construction taken can be reduced and construction expenses can be curtailed, while construction quality can be improved. For this reason, it is vital to prepare a standardized base to connect cutting-edge IT with the construction technologies. In preparing such a base, the most urgent issue is to develop standardized technology criteria. The ultimate objective of this research is to establish the technological criteria system required to apply construction-IT fused technologies to U-Cities, and to develop the technological criteria for the design, construction and maintenance of the U-Cities. This paper, whose objective is to establish development strategies for construction-IT fused technologies by way of analyzing the criteria for conventional construction projects, the necessity of criteria for construction-IT fused technologies, and the current status of U-Cities' development, is the underlying research for this purpose. The strategies established are expected to be utilized in establishing the system of criteria for construction-IT fused technologies, and to contribute to a knowledge base in the construction-IT field. In addition, based on the strategies established, criteria for construction-IT fused technologies, such as design criteria and construction standards, will be developed, and by applying these criteria and standards, the ultimate objectives of U-Cities, which are the enhancement of urban competitiveness and the satisfaction of residents, will be attained

  • PDF

스마트 안전모와 비콘을 이용한 건설현장 안전관리 시스템 설계 및 구현 (Design and Implementation of Construction site Safety management System using Smart Helmet and BLE Beacons)

  • 서귀빈;민세동;이승현;홍민
    • 인터넷정보학회논문지
    • /
    • 제20권3호
    • /
    • pp.61-68
    • /
    • 2019
  • 과거 건설공사의 목표는 원가절감과 공사기간의 단축을 통한 효율성 증진이었다. 하지만 최근 안전관리의 중요성이 부각되고 있으며, 고용 노동부는 산업 재해로 인한 사망자를 절반으로 감소하겠다는 목표를 설정하였으며, 이에 따라 제도적 및 법적 개선이 추구되고 있으며 안전에 대한 필요성이 강조되고 있다. 하지만 일부 대형 건설 회사를 제외한 대부분의 건설업체는 안전관리에 많은 부족함을 보이고 있다. 이러한 건설현장의 안전문제를 해결하기 위하여 본 논문에서는 스마트 안전모와 비콘을 이용하여 건설현장 안전관리 시스템을 설계 및 구현하였다.

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례 (A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management)

  • 박영진;송경철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF