전력수급기본계획에 열병합발전 설비 반영 방법론의 개발 (The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;김미예;우성민;조성린;임현성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

전력수급기본계획에 열병합발전 설비 반영시의 효과분석에 관한 연구 (The Analysis of Effect in Order to Consider Combined Heat and Power Capacity in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;문정호;연준희;정현성;우성민;김미예
    • 에너지공학
    • /
    • 제16권1호
    • /
    • pp.22-31
    • /
    • 2007
  • 본 논문에서는 전력수급기본계획에 열병합발전설비의 최적용량을 반영할 수 있는 방법론을 개발하였으며 이에 따른 효과를 분석하였다. 이를 위해 열병합발전의 계획발전원가를 새로이 산정하여 심사곡선법(Screening Curve Method : SCM)을 이용한 정태적 최적 전원을 구성하였다. 이때, 열병합발전은 전기와 열을 생산하는 것이 가장 중요한 특징이므로 이를 고려할 수 있도록 열병합발전의 전기용량과 열용량을 모두 고려할 수 있는 계획발전원가를 도출하였다. 또한, 심사곡선법을 적용시키기 위한 부하지속곡선의 경우도 열병합발전의 특징을 고려하여 전기 및 열 부하지속곡선을 구성하여 적용하였다. 이때, 현재 수립된 전력 수급기본계획을 최대한 수정하지 않는 범위 내에서 열병합발전설비를 반영하도록 하였다. 열병합발전 건설계획을 반영한 계획안의 타당성을 증명하기 위해서 열병합발전 건설계획을 반영한 계획안과 전력수급기본계획을 비교 하였다. 즉, 발전량 기대치를 산출하여 발전원별 연료소비량 및 환경에 미치는 영향을 도출함으로써 열병합발전의 반영에 대한 효율성을 입증하였다.

Study of Peak Load Demand Estimation Methodology by Pearson Correlation Analysis with Macro-economic Indices and Power Generation Considering Power Supply Interruption

  • Song, Jiyoung;Lee, Jaegul;Kim, Taekyun;Yoon, Yongbeum
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1427-1434
    • /
    • 2017
  • Since the late 2000s, there has been growing preparation in South Korea for a sudden reunification of South and North Korea. Particularly in the power industry field, thorough preparations for the construction of a power infrastructure after reunification are necessary. The first step is to estimate the peak load demand. In this paper, we suggest a new peak demand estimation methodology by integrating existing correlation analysis methods between economic indicators and power generation quantities with a power supply interruption model in consideration of power consumption patterns. Through this, the potential peak demand and actual peak demand of the Nation, which experiences power supply interruption can be estimated. For case studies on North Korea after reunification, the potential peak demand in 2015 was estimated at 5,189 MW, while the actual peak demand within the same year was recorded as 2,461 MW. The estimated potential peak demand can be utilized as an important factor when planning the construction of power system facilities in preparation for reunification.

Rural Water Supply from the Irrigation Reservoir

  • 김대철;박성기
    • 한국농공학회지
    • /
    • 제37권E호
    • /
    • pp.47-54
    • /
    • 1995
  • Irrigation water has been mainly used for paddy rice. Irrigated paddy land tends to be recently converted to land for green house, farm house, and rural-industrial complex. Consequently, demand of water for crops, domestic & industrial, rural recreations, small-scaled hydropower, livestocks, and environment in the rural area, so called rural water, is rapidly increasing. In order to supply rural water, water in the existing irrigation reservoir could be enlarged by repairment of irrigation canal and reinforcement of irrigation reservoir, and be saved by the operation rule curve, utilization of dead water, and balanced storage management.

  • PDF

탐색곡선법과 WASP-IV 모형을 이용한 국내 적정 전원구성 분석 (Generation Mix Analysis based on the Screening Curve and WASP-IV Techniques)

  • 장세환;박종배;노재형
    • 전기학회논문지
    • /
    • 제61권4호
    • /
    • pp.534-541
    • /
    • 2012
  • This paper tries to elicit an optimal generation mix of Korea. Two approaches, using the screening curve method and taking advantage of a generation expansion planning tool, WASP-IV, are applied in getting the mix. The data used in this study is based on the 5th basic plan for long-term electricity supply and demand. The Load Duration Curve, that is needed for applying Screening Curve Method(SCM), is made based on the load profile in 2010. In our using SCM, the nuclear plant's operation characteristic, carbon emission cost and spinning reserve are considered. In using WASP-IV to get the adequate generation mix, the base and target demand forecasts in the 5th basic plan are used and the carbon emission cost is also considered. In this paper, It introduces the domestic adequacy generation mix in 2024 though SCM and WASP-IV.

열병합발전이 고려된 심사곡선법에 의한 전원구성 비율 산정방법의 연구 (A Estimation Method for Ratio of Generator Composition included Combined Heat and Power Using Screening Curve Method)

  • 김용하;이범;최상규;김미예;연준희;김명렬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.736-738
    • /
    • 2005
  • For calculating optimal generation composition of The Basic Plan of Long Term Electricity Supply & Demand, the Screening Curve Method that using generation cost for planning is needed. This paper will induce optimal power system ratio included Combined Head and Power and suggest the method for optimal generation composition of The Basic Plan of Long Term Electricity Supply & Demand that considered policy side.

  • PDF

경쟁 기반의 부품 생산과 협업 기반의 완성품 생산 시스템에서 생산과 수요 통제의 통합적 고찰 (Integrated Demand and Production Control for the Competition-based Component and Cooperation-based End Item)

  • 김은갑
    • 산업공학
    • /
    • 제22권4호
    • /
    • pp.368-375
    • /
    • 2009
  • This paper considers a two-stage supply system consisting of two make-to-stock facilities. The facility in the first stage produces a single type of component in anticipation of future demands from the market and the end item production while the facility in the second stage produces the end item in anticipation of future demands from the OEM customers. The facility in the first stage has the option of to accept or reject each incoming demand from the market. In this paper, we address the problem of how to control the exogenous component demand and how to manage the production of the end item and the component so as to maximize the system's profit subject to the system costs. In this paper, we present a heuristic policy that is the base-stock production policy combined with a linear switching curve for component demand control. Numerical study is implemented under different operating conditions of the system and it shows that the performance of the heuristic is very promising compared to that of the optimal policy for the Markov model.

열병합발전이 전력수급 및 환경에 미치는 영향에 관한 연구 (A Study on Effect Considering the Electricity Supply & Demand and Environment Using CHP)

  • 김용하;나인규;김동근;우성민;김미예;임현성;손승기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.521-522
    • /
    • 2006
  • This paper calculates co-generation generating capacity for the electric supply and demand. CHP is applied to SCM(Screening Curve Method) to calculate CHP generating capacity On the other hand, small co-generation is applied to potential area conversing small co-generation generating capacity considering economic analysis and useful life. these methods executed project scheduled to construction plan. Accordingly, EES(Expected Energy Served), Fuel type consumption and CO2 effects is analyzed by Booth-Baleriaux and data

  • PDF

투자결정 모델을 활용한 개인정보유출의 기대손실 분석 (Analysis of Loss Expectancy on Personal Information leakage using Quantitative Invest Decision Model)

  • 김정연
    • 한국전자거래학회지
    • /
    • 제20권2호
    • /
    • pp.93-106
    • /
    • 2015
  • 전자상거래의 성립을 위해 온라인 정보시스템 상에서 거래 당사자의 정보를 제공하는 것은 필수적이다. 거래의 간편성을 위해 서비스 제공 기업이 이를 보관하고 개인정보와 거래 정보를 가공하여 추가 서비스를 제공하는 것이 전자상거래 분야에서 일반화 되고 있다. 그러나 해당정보의 임의적 보관은 거래의 간편화에 도움이 되는 반면 외부 유출로 인해 직접적 혹은 간접적 피해가 발생할 수 있는 가능성을 높인다. 본 연구는 시스템 운영 기업의 측면에서 정보유출 사고발생의 위험률과 이로 인해 발생할 수 있는 기대 손실을 분석하기 위해 정보보호 관리체계로 대표되는 정성적 정보보호 관리방식과 더불어 대표적인 정량적 분석 방법인 개인정보에 대한 수요공급 곡선과 Gordon and Loeb 모델을 소개한다. 또한 한국인터넷진흥원에서 실시한 개인정보보호 수준 실태조사 결과 중 개인정보 누출사고가 있었던 조사 대상 사업자의 분포가 핵심사업분야나 기업규모에 따라 큰 편차를 나타내는 원인을 제시하였다. 이를 통해 징벌적 손해배상으로 유출사고로 인한 기업의 금전적 손실이 일정 수준을 유지하는 것과 법률로 요구하는 개인정보보호 기준을 최상위등급으로 유지하는 것이 기업간 개인정보 취약점의 편차를 보완할 수 있는 방법으로 제시된다.

Shared Vision 모형을 이용한 용수수급의 안정성 분석 (Water Demand and Supply Stability Analysis Using Shared Vision Model)

  • 정상만;이주헌;안중근
    • 한국수자원학회논문집
    • /
    • 제37권7호
    • /
    • pp.569-579
    • /
    • 2004
  • 최근 들어 지구온난화와 기상조건의 변화로 기후의 변동폭이 증가하면서 극심한 가물이 자주 발생하고 있다. 또한 기 개발된 용수원의 수질 오염, 물 분배에 관한 상류지역의 반대 및 지방자치단체간의 수리권 문제 등도 상류지역으로부터의 맑은 수자원 확보를 필요하게 만드는 요인이다. 따라서 이에 대한 용수공급 관리 방안의 필요성에 대한 인식이 부각되고 있으며, 수도권의 용수수요 변화에 대한 북한강 유역 댐의 용수공급 능력에 대한 적절한 검토가 필요한 실정이다. 본 연구에서는 북한강 유역 댐의 용수공급 가능성을 파악하고 적절한 용수 공급방안을 제시하기 위하여 shared vision 모형인 스텔라 소프트웨어를 이용한 모의 운영시스템을 개발하였다. 또한 이 모형에서는 수위에 따른 평균의 최소, 중간, 최대의 조건으로 3가지 Rule을 정하여 저수지의 운영곡선의 변화와 발전방류에 따른 안전 공급율 변화를 분석하였다.