China is playing more predominant role in the liquefied natural gas (LNG) market worldwide and LNG import price is subject to various factors both at home and abroad. Nevertheless, previous studies rarely heed a multiple of factors. A time-varying parameter factor augmented vector auto-regression (TVP-FAVAR) model is adopted to discover the determinants of China's LNG import price and their dynamic impacts from January 2012 to December 2021. According to the findings, market fundamentals have a greater impact on the import price of natural gas in China than overall economic demand, financial considerations, and world oil prices. The primary determinants include domestic gas consumption, consumer confidence and other demand-side information. Then, there are diverse and time-varying spillover effects of the four common determinants on the volatility of China's LNG import price at different intervals and time nodes. The price volatility is more sensitive and long-lasting to domestic natural gas pricing reform than other negative shocks such as the Sino-US trade war and the COVID-19 pandemic. The results in this study further proves the importance of domestic natural gas market liberalization. China ought to do more to support the further marketization of natural gas prices while working harder to guarantee natural gas supplies.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.63
no.1
/
pp.40-45
/
2014
This study examines the system and process of battery stored energy in vehicles and suggest the effective area for the use of V2G(vehicle-to-grid) from Jeju Smart Grid Demonstration Project. V2G means technology of electric power transmission from the battery of electric-drive vehicles to state grid. As for the increasing of effectiveness for demand-side control, V2G is a very good alternative. In the U.S., the utilization of electric vehicles is under 40% on average. In this case, we can use he battery of electric vehicle as role of frequency regulation or generator of demand-side resource. V2G, which is the element of Smart Transportation, consists of electric vehicle battery, BMS(battery management system), OBC(on-board charger), charging infrastructure, NOC(network operating center) and TOC(total operation center). V2G application has been tested for frequency regulation to secure the economical efficiency in the United States. In this case, the battery cycle life is not verified its disadvantage. On the other hand, Demand Response is required by low c-rate of battery in electric vehicle and It can be small impact on the battery cycle life. This paper concludes business area of demand response is more useful than frequency regulation in V2G application of electric vehicles in Korea. This provides the opportunity to create a new business for power grid administrator with VPP(virtual power plant).
Pubilc utility industries including the electric utility industry are facing a new stream of privatization com-petition with the private sector and deregulation. The necewssity to solve now and in the future power supply and demand problems has been increasing through the sophisticated generation expansion plan(GEP) approach con-sidering not only KEPCo's supply-side resources but also outside resources such as non-utility generation(NUG) demand-side management (DSM). Under the environmental situation in the current electric utility industry a new approach is needed to acquire multiple resources competitively. This study presents the development of a modified electric generation expansion analysis system(EGEAS) model with avoided cost based on the existing EGEAS model which is a dynamic program to develope an optimal generation expansion plan for the electric utility. We are trying to find optimal GEP in Korea's case using our modified model and observe the difference for the level of reliabilities such as the reserve margin(RM) loss of load probability(LOLP) and expected unserved energy percent(EUEP) between the existing EGEAS model and our model. In addition we are trying to calculate avoided cost for NUG resources which is a criterion to evaluate herem and test possibility of connection calculation of avoided cost with GEP implementation using our modified model. The results of our case study are as follows. First we were able to find that the generation expansion plan and reliability measures were largely influenced by capacity size and loading status of NUG resources, Second we were able to find that avoided cost which are criteria to evaluate NUG resources could be calculated by using our modified EGEAS model with avoided cost. We also note that avoided costs were calculated by our model in connection with generation expansion plans.
This paper illustrates the competition between the mobile pay and credit card systems by utilizing the theory of two-sided markets. Two firms, as platforms, maximize the profit collecting fees from consumers on one side and from retailers on the other side. Consumers pay to buy goods and services with mobile pay, credit card, or cash. The basic model is one that each platform maximizes its profit. We show that the fees for credit card holders and retailers are higher than the respective costs. The fee for retailers of the mobile payment is higher than its cost, while the buyer's fee may be higher or lower than its cost. Applied model is the one that employs the delegation game model. The total profit of the mobile pay system is composed of its profit and the weighted demand for the mobile pay. It is shown that buyers' fee under the applied model is lower than that under the basic model, resulting in an increase of the demand for the mobile pay. The fee for the retailers rises, albeit the sum of fees for the buyers and retailers falls. The profit for the mobile pay system is increased, while that for the credit card company stays the same.
Khan, Gohar Feroz;Moon, Jung-Hoon;Rhee, Cheul;Rho, Jae-Jeung
Asia pacific journal of information systems
/
v.20
no.1
/
pp.1-31
/
2010
One of the prominent challenges of e-government identified in developing countries is low level of ICT literacy and skills of e-government users. For those countries at the nascent stage of e-government development, it is crucial to identify and provide e-skills needed from the demand side. However, prior research has mostly focused on the supply side of e-skills, ignoring the consumption side of e-skills. In addition, no user centric approach for e-skills identification and development for e-service consumption, with respect to the stages of e-government development, have been proposed and validated. The purpose of this article is thus to: 1) Identify skills required for e-services utilization by all participants-citizens, public, and private sector employees-involved in G2C, G2B, and G2E e-government relationships respectively; assuming they are consumers of e-government and to 2) Propose and validate an user-centric approach for e-skills identification and development based on stages of e-government utilizing the Delphi method. As a result of the study, a comprehensive list of e-skills (N = 81) was generated. We found that e-skills required for e-service consumption are not merely technical; they include a wide variety of related skills that can be applied to enhancing e-skills. Therefore, the findings can serve as a standard curriculum for training and educating both citizens and government employees in developing countries. Moreover, the findings of this research may also facilitate international organizations in indentifying and measuring citizens' readiness for e-government in terms of e-skills.
Proceedings of the Korea Society for Energy Engineering kosee Conference
/
1998.05a
/
pp.179-184
/
1998
'90년대 이후 전기에너지의 효율적 이용에 따른 절약과 전력사용패턴의 개선을 목적으로 하는 수요관리 즉 DSM(Demand Side Management)의 중요성이 증대되고 있다. 하지만 전기소비량의 약 60%를 차지하는 산업용에 대해서는 전동기 보급율 조사, 냉방수요 행태 조사 및 조명기기 보급실태 조사와 같이 단일기기나 온도에 대한 조사 및 분석만이 이루어져 왔으며, 산업용 전체를 대상으로 업종별 End-Use별 사용실태 조사, 분석, 예측 등 체계적 분석이 이루어지지 않았다. (중략)
본 논문에서는 국내에서 시행중인 전력수요관리사업의 현황을 분석하고 수요관리사업의 보급실적 통계를 구축하는 필요성과 구축 결과를 정리하였다. 일반적인 전력분야 통계와 구분되는 수요관리 분야 통계의 특성을 분석하였으며, 이러한 특성을 효율적으로 반영할 수 있는 수요관리보급통계 지표를 개발하였다. 또한 본연구를 통해 개발한 수요관리보급 통계집은 수요관리평가 웹페이지를 통해 보급하여 사용자의 편의성을 도모하였다.
고효율변압기란 철심소재를 비정질 자성재료(아몰퍼스 메탈)나 방향성 규소강판 등을 사용하여 무부하 손실(철손)을 기존 변압기에 비해 약 70% 줄인 절전형 변압기를 말한다. 이러한 고효율변압기 및 고효율변압기 보급지원제도에 대하여 소개하고, 고효율변압기 보급활성화 방안을 찾고자 한다.
Since the natural gas air-conditioning not only increases the base load of the gas company but also decreases the summer peak load of the electricity company, it is considerded as an efficient demand-side management program. This paper suggests the economic evaluation method of the gas air-conditioning program from the perspectives of the participants, the pipeline gas company, the local distribution company, the electricity company, and the total resources. The absorption type gas air-conditioning/space-heating is selected as a case study to illustrate the economic analysis of the natural gas air-conditioning.
Proceedings of the Korea Technology Innovation Society Conference
/
2000.11a
/
pp.177-193
/
2000
In foreign countries, high-efficiency electric machineries have been developed in view of cost reduction, environmental issues, energy conservation etc. Especially they focus on developing energy conservation measures and demand-side management. Thus, patent application and secure of patent claims are on the rise as important issues in this field. In this paper, we analyzed patent application trends about inverters, ac/dc converters, reactive power control equipments, high-efficiency transformers and electric ballasts among high-efficiency electric machineries. First, we analyzed general technology trends, and constructed patent technology data. Second, we graphed patent application trends in terms of application years, assignees and nations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.