• Title/Summary/Keyword: Delay Time Cost

Search Result 435, Processing Time 0.026 seconds

Optimal Release Policies of Software System with Scheduled Delivery Time (예정된 인도시기를 가진 Software시스템의 최적방출정책)

  • 정영배;신현재
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.9 no.13
    • /
    • pp.29-32
    • /
    • 1986
  • A decision procedure to determine when computer software should be released after testing is described. This paper extends optimum release policies minimizing the total expected software cost with a scheduled software delivery time under reliability requirement constraint. Such cost considerations enable us to make a release decision as to when transfer a software system from testing phase to operational phase. The underlying model is software reliability growth model described by a nonhomogeneous poisson process. It is assumed that the penalty cost function due to delay for a scheduled software delivery time is linearly proportional to time. Numerical examples are shown to illustrate the results.

  • PDF

Accuracy Analysis of Ionospheric Delay of Low Earth Orbit Satellites by using NeQuick G Model

  • Bak, Serim;Kim, Mingyu;Kim, Jeongrae
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.10 no.4
    • /
    • pp.363-369
    • /
    • 2021
  • Since the Global Navigation Satellite System (GNSS) signal received from the low Earth orbit (LEO) satellite is only affected by the upper ionosphere, the magnitude of the ionospheric delay of Global Positioning System (GPS) signal received from ground user is different. Therefore, the ground-based two-dimensional ionospheric model cannot be applied to LEO satellites. The NeQuick model used in Galileo provides the ionospheric delay according to the user's altitude, so it can be used in the ionospheric model of the LEO satellites. However, the NeQuick model is not suitable for space receivers because of the high computational cost. A simplified NeQuick model with reduced computing time was recently presented. In this study, the computing time of the NeQuick model and the simplified NeQuick model was analyzed based on the GPS Klobuchar model. The NeQuick and simplified NeQuick model were applied to the GNSS data from GRACE-B, Swarm-C, and GOCE satellites to analyze the performance of the ionospheric correction and positioning. The difference in computing time between the NeQuick and simplified NeQuick model was up to 90%, but the difference in ionospheric accuracy was not as large as within 4.5%.

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

Implementation of Real-time Monitoring and Remote Control System Testbed based on Digital Twin (디지털 트윈을 활용한 실시간 모니터링 및 원격제어 시스템의 테스트베드 구현)

  • Yoon, Jung-Eun;Kim, Won-Suk
    • Journal of Korea Multimedia Society
    • /
    • v.25 no.2
    • /
    • pp.325-334
    • /
    • 2022
  • Digital twin has the advantages of quality improvement and cost reduction, so it is widely applied to various industries. In this paper, a method to implement the major technologies of digital twin easily and quickly is presented. These include data management and relay servers, real-time monitoring applications including remote control interfaces, and direct connection protocols for video streaming. In addition, an algorithm for controlling a two-wheeled vehicle with a 2D interface is also proposed. The implemented system performs near real-time synchronization between the real environment and the virtual space. The delay time that occurs in remote control of the vehicle in the real environment was compared with the results of applying the proposed delay time reduction method. In addition, in the case of 2D interface-based control, an algorithm that can guarantee the user experience was implemented and applied to the actual environment and verified through experiments.

Development of New Methods for Position Estimation of Underground Acoustic Source Using a Passive SONAR System

  • Jarng, Soon-Suck;Lee, Je-Hyeong;Ahn, Heung-Gu
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.69-75
    • /
    • 2000
  • The aim of the work described in this paper is to develop a complex underground acoustic system which detects and localizes the origin of an underground hammering sound using an array of hydrophones located about 100m underground. Three different methods for the sound localization will be presented, a time-delay method, a power-attenuation method and a hybrid method. In the time-delay method, the cross correlation of the signals received from the array of sensors is used to calculate the time delays between those signals. In the power-attenuation method, the powers of the received signals provide a measure of the distances of the source from the sensors. In the hybrid method, both informations of time-delays and power-ratios are coupled together to produce better performance of position estimation. A new acoustic imaging technique has been developed for improving the hybrid method. This new acoustic imaging method shows the multi-dimensional distribution of the normalized cost function, so as to indicate the trend of the minimizing direction toward the source location. For each method the sound localization is carried out in three dimensions underground. The distance between the true and estimated origins of the source is 28m for a search area of radius 250m.

  • PDF

Efficient Implementations of a Delay-Constrained Least-Cost Multicast Algorithm

  • Feng, Gang;Makki, Kia;Pissinou, Niki
    • Journal of Communications and Networks
    • /
    • v.4 no.3
    • /
    • pp.246-255
    • /
    • 2002
  • Constrained minimum Steiner tree (CMST) problem is a key issue in multicast routing with quality of service (QoS) support. Bounded shortest path algorithm (BSMA) has been recognized as one of the best algorithms for the CMST problem due to its excellent cost performance. This algorithm starts with a minimumdelay tree, and then iteratively uses a -shortest-path (KSP) algorithm to search for a better path to replace a “superedge” in the existing tree, and consequently reduces the cost of the tree. The major drawback of BSMA is its high time complexity because of the use of the KSP algorithm. For this reason, we investigate in this paper the possibility of more efficient implementations of BSMA by using different methods to locate the target path for replacing a superedge. Our experimental results indicate that our methods can significantly reduce the time complexity of BSMA without deteriorating the cost performance.

Non-fragile Guaranteed Cost Control of Uncertain Nonlinear Systems with Time-varying Delays in State and Control Input (시변 시간 지연을 갖는 불확실한 비선형 시스템의 비약성 보장 비용 제어)

  • Kim, Jae-Man;Choi, Yoon-Ho;Park, Jin-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.3
    • /
    • pp.459-465
    • /
    • 2012
  • In this paper, we present a non-fragile guaranteed cost control design method for uncertain nonlinear systems with time varying delays in state and control input, even though the controller gain is perturbed. The uncertain nonlinear term in the systems is norm bounded and the linear matrix inequality(LMI) optimization method is employed as a stability analysis of the systems. We design a robust controller and show the asymptotical stability of uncertain time-varying systems based on Lyapunov method. Also, we guarantee a specific level of performance of the systems. The simulations are carried out to demonstrate the effectiveness of the proposed method.

A study on the development of Logistic Support system (군수 지원시스템 개발 방법에 관한 연구)

  • 신주환;전완수;김형렬
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.166-172
    • /
    • 1999
  • Weapon system is defined as a combination of primary system and logistics support system which are evaluated by capability and operational availability respectively. Weapon system developer thought that primary system was weapon system and also only primary system was important. Recent comparison of total life cycle cost showed that logistics support system was proved to be more important than primary system. However, until now no systematic approach to logistics support system development have applied in the area of developing support system and much money was exhausted by wrong logistics support system. We need to construct a universal metric for effectiveness of logistics support system and to cut out whatever activities or support elements which do not contribute to the metrics. This study describes a new approach under the name function approach to logistics support system development and also classifies five factors of failure frequency, stock out of frequency, administrative delay time, active repair time and logistic delay time that have influence on operational availability of logistics support system.

  • PDF

An efficient Multicast Delivery Mechanism Based on Locality in Mobile IPv6 Networks (이동 IPv6 환경에서 지역성에 기반한 효율적인 멀티캐스트 전송 메커니즘)

  • Sung Sulyun;Kim Kiyoung;Shin Yongtae
    • The KIPS Transactions:PartC
    • /
    • v.12C no.3 s.99
    • /
    • pp.409-418
    • /
    • 2005
  • This paper presents an efficient multicast method based on a locality in mobile IPv6 networks. We exploit the repetitive movement pattern of mobile node to reduce the total number of experience of graft and join procedure. We defined the locality scope by a movement pattern. While the network is included in the locality scope, the network should maintain a multicast tree even when the mobile node moves to the other network. In this way, the mobile host can receive a multicast service without a delay when it moves to the network in the locality scope later. We compare our scheme with existing schemes under the total signaling cost and the service delay time by using a discrete analytical model for cost analysis. Analytical results demonstrated that the total signaling cost and service delay time was significantly reduced through our proposed scheme.